Assessing Quality of Asphalt Paving Jobs to Determine Contractor Pay Robin C. Wurl James R. Lundy 2003 Quality & Productivity Research Conference.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Números.
C) between 18 and 27. D) between 27 and 50.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
EuroCondens SGB E.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
CALENDAR.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
The 5S numbers game..
1 A B C
Solve Multi-step Equations
Break Time Remaining 10:00.
The basics for simulations
ABC Technology Project
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
15. Oktober Oktober Oktober 2012.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
4.5 Solve Quadratic Equations by Finding Square Roots
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Addition 1’s to 20.
25 seconds left…...
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Week 1.
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
How Cells Obtain Energy from Food
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Assessing Quality of Asphalt Paving Jobs to Determine Contractor Pay Robin C. Wurl James R. Lundy 2003 Quality & Productivity Research Conference

2 Contractors Employed for Asphalt Paving Jobs in Oregon Job price established prior to commencing At job completion, quality of pavement assessed –If pavement quality exceeds expectations Contractor receives pay bonus –If pavement quality below expectations Contractor is given a pay penalty

3 Bonus or Penalty is Determined by a Pay Factor Pay Factor –Index between 0.75 and 1.05 –Multiplied by original job price to determine final payout figure Final Payout = (Job Price) x (Pay Factor)

4 Pay Factor is a Function of the Expected Quality Level Quality Level Unacceptable: Tear out and replace 0.75 Expected Quality Level Attained Expected Quality Level Exceeded Pay Factor

5 Goal: Map Job Quality to a Pay Factor Statistically quantify quality of pavement job Map statistical quality measure of job to pay factor Statistical Quality Level of Job Job Pay Factor

6 Nature of Pavement Mixes Multiple Quality Characteristics (QCs) – X 1, X 2, …, X p Target values for QCs may change during job Process adjustments in beginning of production Changes in raw materials during production QCs not all equally important

7 The Measure of Quality is Based on Loss Function Consider univariate case: X – mix quality characteristic T – target of quality characteristic Quadratic Loss Function: Expected Loss:

8 Quality Measures Measure of Deviation from Target Measure of Variability

9 Multiple QCs and Target Changes During Job i th observation within j th target change within k th QC j th target change within k th QC k th QC

10 Quality Measures are Estimated for Each QC and Target Estimate deviation from target with Estimate variability with

11 Quality Measures are Averaged Over Target Changes Use number of observations per target in weighted average of quality measures

12 Individual Quality Measures are Mapped to Pay Factor Values Specific point values of quality measures mapped to equitable pay factor –Mappings determined from expertise about process –Straight units (not squared) for quality measures

13 Linear Interpolation is Used Create Continuous Mapping Function

14 Account for Unequal Importance of QCs Assign weights to QCs to account for different relative importance w k - relative importance weight of QC

15 Intermediate Pay Factor Values Computed for Quality Measures Deviation from target: Variability:

16 Intermediate Pay Factor Value Computed for a Specific QC For k th QC:

17 Pay Factor for the Overall Job is Computed Overall:

18 Example Asphalt Paving Job X 1 Air voids in pavement mix (%) Target: T 1 = 4% and changes to 4.3% Relative importance: w 1 = 0.4 X 2 In-place density of pavement (%) Target: T 2 = 93% Relative importance: w 2 = 0.6

19 Quality Measures Computed within Each Target Observation X ijk Target T jk Air Voids (%)Density (%)Air Voids (%)Density (%)

20 Quality Measures Averaged Over Target Changes Weighted Averages Air Voids (%)Density (%) Number of observations for target 1 Number of Observations for target 2

21 Deviation from Target for Air Voids Mapped to Individual Pay Factor Deviation from Target

22 Air Voids (%)Density (%) Quality MeasurePay FactorQuality MeasurePay Factor Quality Measures Mapped to Pay Factor Values Intermediate Pay Factor for Deviation from Target: Intermediate Pay Factor for Deviation from Target: Overall Pay Factor