1 U of M Materials Science Seagate Design Group Alan Bagwell Tony Lindert Loc Nguyen Greg Rayner Industrial Mentor: Dr. Vince Engelkes Faculty Advisor:

Slides:



Advertisements
Similar presentations
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

Xinfeng Magnet Attracts The World. Eyes on Xinfeng Application Market Customer Case Facility Products Contents Xinfeng Team Sales Network.
ONLINE BUSINESS. Business Plan for Online Business  What Is Included In A Business Plan? There are four main parts to a business plan: 1. the description.
Studi Kelayakan (Feasibility Study) Dr. Sukardi Departemen Teknologi Industri Pertanian Fakultas Teknologi Pertanian IPB.
Exceptional Certification The Business Side of Certification Presentation: Certification Network Group – Chicago – Roger L. Brauer, Ph.D., P.E.
Relex Reliability Software “the intuitive solution
Chapter 3. Obtaining Silica-Fume Concrete  Specifying Silica Fume and SFC  Proportioning SFC  Producing SFC.
Continuous Flow Biodiesel Reactor
Amir R. Shayan, H. Bogac Poyraz, Deepak Ravindra, Muralidhar Ghantasala and John A. Patten, Western Michigan University Kalamazoo, MI.
McGraw-Hill/Irwin Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Sixth Edition.
بسم الله الرحمن الرحيم. King Saud University College of Engineering Department of Industrial Engineering King Saud University College of Engineering Department.
EE 666 Advanced Semiconductor Devices All About Hard Drives Lili Ji Lili Ji
Electrochemical Aspects of Copper Chemical Mechanical Planarization (CMP) Esta Abelev, D. Starosvetsky and Y. Ein-Eli. Introduction: Copper is used as.
Mohammed Alzayer Edward Bruns Brady Horner Tyler Schlueter Mat E 413 December 16 th, 2014.
Ken Youssefi Introduction to Engineering – E10 1 Design Process Concurrent Engineering.
Avian Influenza H5N1 Reactive Antibodies BA 468x Technology Commercialization.
Mist Generator Kelly Toy Jon Cappel Joe Bothwell Abdikarim Mahamud Advisor – John Webster Client – Jack Jiang, MD, PhD tents/06.00/ asp.
ACC3200 Chapter 2: Job Order Costing Job Order Costing.
G1 The Essentials to Take Charge of Your Finances Spending plans Advanced.
Key components of the business plan
1 st Phase Model Department Institute of Food Sciences & Technology.
Paint Heat Lamp Power and Control System Team Members: Sui Kwan Ng Vincent Ong Raymond Sidharta Joseph L. Vetter September 18, 2003 Client: H & S Autoshot.
Better CMP Cleaning Solutions Surfactanized Metal Inhibitors, Oxygen Scavengers and a New Particle Remover March CMPUG 2014 San Jose By Geoffrey.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Economics Majors Rank In the Top 10 for Salaries After Graduation
On Target Group Coaching
Business Models MGT 709 New Venture Creation. Business Model Analysis (Hammermesh)  A business model is a “profit engine” or cash generating machine.
Accounting 11 Financial Statements COPY YELLOW TEXT.
McGraw-Hill/Irwin Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Sixth Edition.
ME 481 Mechanical Engineering Design Projects Project Management.
Ken Youssefi Mechanical Engineering department 1 Design Process Concurrent Engineering.
Problem Statement Automotive and heavy equipment applications use sensors on machines to report temperatures, pressures, speeds, etc. to a central embedded.
C H A P T E R 5 Operational Budgets. Learning Objective 1 Describe the importance of personal budgeting.
1 U of M Materials Science Seagate Design Group Alan Bagwell Tony Lindert Loc Nguyen Greg Rayner Industrial Mentor: Dr. Vince Engelkes Faculty Advisor:
Unit 8/Week 8 – PP 101 Instructor Flentroy-Parker.
LOGO Argonne National Lab Presentation 3 Yong Ding Nuttavutt Intarode Ibrahim Iskin Thien Tran 06/12/2009.
U of M Material Science Seagate Design Group
Brizon Inc Products: Microelectronic Application CMP Slurry additive CMP cleaning solutions Wafer storage buffer solution.
FIRE RESCUE FY Budget Worksession July 11, 2011.
Characterization of Heterogeneity in Nano-structures of Co-Copolymers using Two point Statistical Functions Gail Jefferson Mechanical Engineering FAMU-FSU.
MPRI Centralised Laboratories Gerrard Peters School of Physics 1.
Chemical Techniques and Developments Mechanical Planarization.
Entrepreneurship You’re the Boss!. Entrepreneur An individual who undertakes the creation, organization, and ownership of a business. He or she accepts.
Alternating Current Potential Drop Probe Alternating current potential drop (ACPD) testing is a relative newcomer to the area of nondestructive evaluation.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Nanotechnology Tim Tice March 6, What is Nanotechnology? Two components of Nanotechnology Two components of Nanotechnology Processing and production.
Luis Mendez Hala Altunji Johnpaul Golinski Sol Ezra 5/4/2011.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Colloidal Silica, Ceria Slurry의 Particle 규명 및 제어 방법 연구
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
EQUATE PETROCHEMICAL COMPANY EQUATE RCM Project Implementation By Khalid Al-Anzi.
Pinellas Pilots Association Dues and Hourly rate Presentation.
1. Kemet International Ltd Established 1938 Privately owned - main shareholders and directors are descendants of original directors 55 employees based.
Preparation of budgets
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
ULTRASONIC MACHINING PROCESS Prepared by B.BALAMURALI AP/MECH
Design Process Concurrent Engineering
Analyzing Financial Statements
Process engineering TAKT vs CYCLE.
Research Study.
Report from the Society Committee on Budget & Finance
Wear of PM HIP metal matrix composites – influence of carbide type
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
How to Play User Guide.
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Anthony Rivera “Tony” Lab Section 0038 University of Central Florida
Report from the Society Committee on Budget & Finance
Summary of State Appropriations through
Presentation transcript:

1 U of M Materials Science Seagate Design Group Alan Bagwell Tony Lindert Loc Nguyen Greg Rayner Industrial Mentor: Dr. Vince Engelkes Faculty Advisor: Prof. C. Daniel Frisbie

Outline Project Recap Timeline – Phase 1: Research and Design – Phase 2: Laboratory Testing – Phase 3: Implementation – Phase 4: Project Lifespan Cost Analysis Summary 2

Project Goal and Solution Main Goal: Reduce transducer RMS roughness from 10 Å to 2 Å Project Solution: Chemical Mechanical Processing / Nanogrinding 3 On the advanced lapping process in the precision finishing of thin-film magnetic recording heads for rigid disc drives, Jiang, 2003

Solution Summary Fixed Abrasive Lapping – 50 nm polycrystalline spherical diamond particles embedded in tin-bismuth grooved plate – Plate charging time of 8 hours Slurry Composition – Ethylene glycol with 6% colloidal silica (30% SiO 2, 10 nm) – Benzotriazole corrosion inhibitor (2g/L) – Polyoxyethylene ether surfactant (5 vol%) – Organic pH regulators such as NH 4 OH to achieve a pH of 10 4

Phase 1: Research & Development 4 months of design and planning No physical testing at this stage Team financing: $104,000 5

Phase 2: Lab Testing 6 months of small-scale testing and quality control Seagate laboratory used for testing – no associated equipment costs Assumption: Seagate’s machines for the current lapping processes will fit our process 6

Phase 2 Costs Engineers$156,000 Slider bars$96,000 Slurry$2577 Diamond particles$1872 Laboratory usage$288,000 Miscellaneous$100,000 Total Cost$644,449 7

Phase 3: Implementation 6 months to reach full-scale production 50% failure rate on all heads Seagate produced 182 million hard drives in 2008 Average of 6 heads per drive Additional charging time on our process requires 1060 extra machines 8

Phase 3 Costs Engineering Salary$156,000 Labor$900,000 New Machines$106,000,000 Slurry$214,625,000 Diamond particles$70,090,000 Total Cost$391,770,000 9

10 Phase 4 Costs (Project Lifespan: 3 years) CategoryCost Per YearTotal Cost (million) Engineering Salary$312,000$0.94 M Labor$1,800,000$5.40 M Slurry$429,250,000$1, M Diamond particles$140,180,000$ M Total Cost$571,542,000$1, Million

Cost Summary Net Present Worth Adjusted (i = 10%) Phase 1 (4 months)$104,000 Phase 2 (6 months)$644,449$624,316 Phase 3 (6 months)$391,770,000$361,869,000 Phase 4 (3 years)$1,714,630,000 (over three years) Year 1: $503,352,000 Year 2: $457,593,000 Year 3: $416,993,000 Total$2.11 billion$1.74 billion 11

Gantt Chart 12

Cost Analysis 13

Cash Flow (Net Present Value- adjusted for 10% interest) 14 YearCost (Million)Additional Revenue (Million) Cash Flow (Million) 0$3630 1$ $ $

15

Summary Proposed design will increase storage density by 100%. Net present cost of project for 4 years and 4 months is $1.74 billion Net present revenue from project is projected to be $12.6 billion Break even point is 1 year and 5 months Net cash flow after 4 years is $10.9 billion 16