HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.

Slides:



Advertisements
Similar presentations
D. Cheng Sept 23, 2013 Instrumentation Trace Material Selection.
Advertisements

Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.
1 QXF heater design: current status and the path forward M. Marchevsky (LBNL) 03/06/2014 D.W. Cheng, H. Felice, G. Sabbi (LBNL), G. Ambrosio (FNAL)
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
Dan Cheng 1/13/2015 LARP Copper Plated Trace Development Update.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Surface Coatings & Tests for LARP Coil Endparts Task Force D.W.Cheng LBNL February 24, 2012.
QXF instrumentation trace development
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
Dan Cheng 6/11/2015 QXF coil measurements plan at LBNL.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
Dan Cheng, Maxim Marchevsky 9/9/2014 Copper Plated Trace Development Update.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Heaters for the QXF magnets: designs and testing and QC M. Marchevsky (LBNL)
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
MQXFSM1 results Guram Chlachidze Stoyan Stoynev 10 June 2015LARP meeting.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
Dan Cheng QXF Structures Working Group November 7, 2014 Implications for the split-shell MQXFS concept.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
HQ Coil 19 Test Impregnation
High Order correctors coil manufacturing
MQXF Quench Protection and Meeting Goals
QXF Cable Winding Test and End Parts Design
11T Dipole – Single Aperture 2m Model
11 T dipole coil features and dimensions
Mechanical stability and QXF coil winding
MBHSP02 test STATUS and first results
Voltage tap layout and quench antenna options for the long QXF magnet
Guram Chlachidze Stoyan Stoynev
Long term behavior of MQXFS1
Hi-pot results summary
Fred Nobrega September 4, 2019
Coil Fabrication Status
Presentation transcript:

HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng

HQ Coil 23 Status HQ Coil 14 has been examined – Seemed to have similar epoxy fill issues between polyimide trace layers as Coil 23 did – Coil was sectioned earlier – Traces were peeled back to examine epoxy fill of coil Coil 23 “Spot” has been cut away and examined – Does not affect the integrity of the coil in any way Instrumentation & QA on hold still, depending on decision on coil Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status2

Coil 23, Post-impregnation Outer layer, REOuter layer, straight section Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status3

Coil 23, Post-impregnation Inner layer, REInner layer, LE Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status4

Outer Layer Comparisons Coil 14 OL, Lead endCoil 23 OL, Lead end Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status5

Coil 14 Deconstruction Coil 14 IL, RE, post-impreg.Coil 14 IL, RE, trace peeled off Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status6 Despite no fill between polyimide, coil shows complete fill Kapton layer separated from trace

Coil 14 Deconstruction Coil 14 OL, end of ramp area, post-impregnation, sectioned Coil 14 OL, end of ramp area, trace peeled off Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status7

Coil 23 Inner Layer Check Inner layer, Pole gap Inner layer, pole gap, Spot cut away Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status8 Trace polyimide, with VHB backing Kapton layer, conforming to epoxy in pocket

Coil 23 Summary of Findings Based on examination of Coils 14 & 23Coil 23 IL, Return end Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status9 White areas (shown, right) are likely surface conditions only – Is not an indicator of quality of fill in the coil Coil fill is likely solid underneath the trace – Even where polyimide separated from Kapton layer – Coil structures are likely fully supported by epoxy composite If this coil passes electrical checks, this coil could be considered a usable coil

HQ Coil 25 Status Impregnation preparations will incorporate – Purchasing new CTD 101K epoxy kit (2-3 wk lead) – Revising our trace preparation procedures to improve quality of fill between layers – Revising our lead splice procedures (based on input from 8/22 QXF Coil WG meeting) Impregnation preparations can start without waiting for the changes mentioned above to be completed – But will have to be planned around HQ Coil 26 winding, etc. operations Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status10

Extra slides Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status11

Coil 14 Trace Preparations Coil 14 IL trace laminate Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status12 Film of cleaner (alcohol or acetone?) between layers

CMM Data, At 26” (660mm) Location Sept 19, 2013 D. Cheng - HQ Coil 23, 25 Status13 Coil 23Coil 20, for reference +250 µm ~ 0.010”