Student Launch Project Flight Readiness Review April 21, 2014
Team Structure
Presentation Overview Final Launch Vehicle Final Motor Selection Static Stability/ Mass Margin Recovery System Full Scale Test Flight Verifications Integrated Research Payload
Final Launch Vehicle Design and Dimensions
Key Design Features Launch Vehicle Sections Voltmeter/ CubeSat, Hazard Detection, Multi-Staging Fin Style Launch Vehicle Separations Booster Section, Drogue Bay/ Detachable Bulkhead
Forward Section - CubeSat Nose Cone Voltmeter CubeSat
Avionics/Payload Section - Hazard Detection Avionics/ Payload components Hazard Detection System Drogue bay disengagement
Booster/Sustainer Section - Multi-Staging Booster section disengagement Fin Style and attachment Positive Motor Retention
Motor Description MotorBrandEngine Code DiameterLengthBurn TimeTotal Impulse Maximum Thrust MainCesaroniK Vmax 98mm in1.53s2432Ns996 N SustainerCesaroniL985TT54mm19.33 in2.7s2678 Ns1589 N
Thrust Curve of Motors
Table of Motor Events EventTime (s)Altitude (ft)Velocity (ft/s) Motor Ignites000 Main Motor Burnout Main Motor Separation Sustainer Ignites if within critical angle off of the Z-axis Sustainer Burn Out Apogee247000<20
Static Stability Margin Stability Margin Center of GravityCenter of Pressure With Booster in98.0 in Without Booster in72.8 in
Thrust-to-Weight Ratio and Rail Exit Ascent Analysis With Booster SectionWithout Booster Section Rail exit velocity (ft/s)64- Max velocity (ft/s) Max Mach number Max acceleration (ft/s 2 ) Peak altitude (ft) Thrust-to-Weight Ratio7:16:1
Mass Statement and Mass Margin SubsystemMass (lbs)Mass Limit (lbs) Propulsion (Including: motor mounts and centering rings) Structure (Including: body tube, coupling tubes, bulkheads, nose cones, fin sets) Recovery (Including: main parachute, drogue parachute, detachable components parachutes) Payload (Including: avionics bays, electrical components) Miscellaneous (Including: Paint scheme, dressings/coatings) Total
Parachute Sizes and Descent Rates ParameterDrogueMainBooster Diameter (in) Deployment Altitude (ft) Velocity at Deployment (ft/s) >2054>20 Descent Rate (ft/s) Harness Length (ft) Shroud Line Length (in)
Kinetic Energies ParachuteParachute Size Vehicle Section Mass of Section Descent Rate Kinetic Energy Booster60 inchesBooster Section 6 lbs22.6 ft/s50 ft-lbs Mini Avionics Bay 3 lbs22.6 ft/s24 ft-lbs Drogue85 inchesDrogue & Main Bay 29.5 lbs54 ft/s-- Drogue Bay 11 lbs17.5 ft/s52.6 ft-lbs Main120 inchesAvionics Bay 8 lbs15 ft/s28 ft-lbs Main Section 8.5 lbs15 ft/s30 ft-lbs
Predicted Drift from Launch Pad 0 mph5 mph10 mph15 mph20 mph 0 ft.1050ft.2284ft.3654ft.4515 ft. Predicted Altitude 0 mph5 mph10 mph15 mph20 mph 7089ft.7078ft.7043ft.6981ft.6888ft.
Test Plans and Procedures Test PurposeTest Status Full-Scale Test Flight To ensure safe stage separation and sustainer motor ignition during flight In Progress Smart Ignition Device To ensure that the sustainer ignition charge will be inhibited if the rocket off of the vertical. Completed Booster Section Separation Ground Test To ensure booster section can separate from main bay with attachment scheme Complete Airstart TestTo ensure Raven3 has appropriate output current to airstart sustainer Complete
Full Scale Flight – 1 st Test
Full Scale Flight Test Data
Recovery System Testing Test PurposeTest Status To ensure design of parachute can withstand forces Completed – Successful To determine velocity that the parachute will fly, and impact force of different rocket sections Completed – Successful To test static ejection charges of full scale parachutes Completed – Successful To demonstrate durability of bulkhead attachment scheme within the rocket. Completed – Successful
Electrical Component Testing ComponentTest PurposeTest Status Microcontrollers including the Raspberry pi and Arduinos To test functionality and programming logic Completed RockeTiltometer and Raven 3 altimeters To test functionality and accuracy Completed VoltmeterTo test functionality and accuracy Completed XBee Pro 900To test functionality and communication between systems Completed GPS units for separable sections To test functionality and accuracy Completed
Summary of Requirements Verification Launch Vehicle RequirementStatus Rocket must not fly higher than 20,000 ft. AGLComplete Rocket must carry a scientific payloadComplete Rocket must have dual altimetersComplete Rocket must have dual deploy recovery systemComplete Rocket must be reusable on the day of recoveryComplete Rocket must land within 5000 ft. of the launch pad assuming 20 mph wind Complete Students must do all critical design and fabricationComplete Team must use a launch and safety checklistComplete Rocket must use a commercially available, certified motor Complete Rocket must be capable of being prepped for launch in less than 2 h Complete Rocket must be able to remain in a launch-ready configuration for at least 1 h Complete Rocket must attain an altitude between ft.Complete Drogue parachute successfully deploys at apogee and main at 1200 ft. Complete Rocket must be compatible with a 1.5’’ launch railComplete
Key Design Features of the Payload Hazard Detection System Lateral Vibrations In line System (LVIS) Tesseract
Payload Design and Dimensions Hazard Detection/Avionics Bay
Payload Design and Dimensions LVIS MotorBrandEngine Code DiameterLengthBurn TimeTotal Impulse Maximum Thrust MainCesaroniK Vmax 98mm in1.53s2432Ns996 N SustainerCesaroniL985TT54mm19.33 in2.7s2678 Ns1589 N
Payload Design and Dimensions Designed to measure the magnitude of accumulated triboelectric charge on the surface of the nose cone at carious altitudes Time stamp all altitudes and charge measurements to assist in post flight analysis Tesseract
Tesseract Payload Overview The system can be broken down into three separate subsystems: Voltmeter CubeSat Ground Station The nose cone will be coated with MGM Chemicals 838 Total Ground Carbon Conductive Coating
Payload Integration Hazard Detection/Avionics Bay
Payload Integration LVIS Locations of Raven3 Avionics Bay Above the Sustainer Mini-Avionics Bay Raven3 diagram from manufacturer’s website Raven3 on payload sled
Payload Integration LVIS Electrical schematic of RockeTiltometer2 with Raven3 Image of RockeTiltometer2 with connections
Payload Integration Tesseract
Interfaces with Ground Systems Internal Interfaces Nose cone and payload sections All-threads Bulkhead-like centering rings Nut locks Drogue bay, avionics bay, main bay, sustainer section, booster section and mini parachute bay. #2-56 nylon shear pins (x2 for each section) External Interfaces 1515 rail buttons
Summary of Requirements Verification Payload PayloadRequirementStatus Hazard DetectionBulkhead covering camera must be detachableComplete Hazard DetectionPayload must be capable of detecting landing hazardsComplete Hazard DetectionData must be transmitted to the ground in real timeIncomplete LVISMotor staging must perform properlyComplete LVISPayload must record lateral vibrations in the airframeComplete LVISData must be recoverableComplete TesseractPayload must be able to record a potential differenceComplete TesseractPayload must record altitudeComplete TesseractData must be stored and recoverableComplete
Questions?