Page 1© Crown copyright 2005 Voluntary Cooperation Work Richard Smout, John Nash, Jeremy Gillham, Mark Smees and Steve Palmer.

Slides:



Advertisements
Similar presentations
© Crown copyright Met Office E-AMDAR evaluation. Mark Smees & Tim Oakley, Met Office, May 2008.
Advertisements

Status of GSN-GUAN Improvement Activities Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva, Switzerland.
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva.
Kenya AIDS Vaccine Initiative
Alford Academy Business Education and Computing1 Advanced Higher Computing Based on Heriot-Watt University Scholar Materials Implementation and Testing.
TRANSFORMING CAPABILITY SUPPORT MATERIALS HUMAN RESOURCE MANAGEMENT FOR INNOVATION The Photonics Experience Case Study Introduction The Photonics case.
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva.
00/XXXX1 Upper Air Network UK National Report. Tim Oakley & John Nash Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva.
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
System Development Life Cycle (SDLC)
The Evolution and Development of the United States NOAA National Weather Service Universal Radiosonde Replacement System TECO 2005 World Meteorological.
1 00/XXXX © Crown copyright UK Radiosonde testing 2002/2003 and improvements to the Camborne test facility Richard Smout, John Nash CIMO ET on Upper Air.
Abstract has 6 upper air stations for GPS S SR2K2 Modemwith Radiosonde M2K2_DC, 6 Upper Air stations of RDF Radiotidolite RT20A ( Vaisala ) and three Upper.
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
Hazard Identification
GLOBAL CLIMATE OBSERVING SYSTEM- REQUIREMENTS AND REALITIES OF PROVIDING OVERLAPPING RADIOSONDE FLIGHT SERIES DATA FOR LONG TERM CLIMATE CONTINUITY Carl.
© Crown copyright Met Office John Nash 1, Tim Oakley 1, Mark Smees 1, S.Kurnosenko 2 and Li Wei 3 1 Met Office, Fitzroy Road, Exeter, EX1 3PB, UK 2
Chapter 8: Systems analysis and design
Reference U/A for GCOS Seattle 2006 Richard K. Thigpen GCOS Secretariat Geneva.
Visit us at E mail: Tele: www.globalmanagergroup.com.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
Copyright 2010, The World Bank Group. All Rights Reserved. International Statistics Part 1 Crime, Justice & Security Statistics Produced in Collaboration.
Alicante 24-26/4/2013 Organization for QA 1 2 nd DoQuP Training Seminar University of Alicante, April 2013 Aim of the Seminar Alfredo Squarzoni University.
End HomeWelcome! The Software Development Process.
Kenya Meteorological Department
Page 1© Crown copyright 2004 Upper air networks: GCOS requirements Peter Thorne February 2005.
GCOS Implementation Project Manager’s Report Richard K. Thigpen GCOS Secretariat Geneva, Switzerland.
Introduction to orientation MOVES FOLIO Course. Introduction- Orientation A key role for supervisors is to provide orientation (also known as induction)
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
ESARSWG Seismological Networks Blessing Shumba Cairo, Egypt.
GCSE ICT Systems Analysis. Systems analysis Systems analysis is the application of analytical processes to the planning, design and implementation of.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
1 Chapter 13 (Week 13) SYSTEMS MAINTENANCE AND EVALUATION Chapter 13: SYSTEMS MAINTENANCE AND EVALUATION Throughout its life, a system should operate effectively.
GCOS Implementation Project Manager’s Report Richard K. Thigpen GCOS Secretariat Geneva, Switzerland.
IAEA International Atomic Energy Agency Arusha, Tanzania EGYPT Mohamed Reda Ezz El-Din 2 – 5 December 2013 RAF9038 Final Coordination Meeting.
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
Page 1© Crown copyright 2004 Initial results from Tropospheric Airborne Meteorological Data Reporting (TAMDAR) evaluation Dr J. Nash and M. Smees.
2 (14) Universal Upper Air Sounding System
Page 1© Crown copyright 2004 Results of the RS92 Acceptance Test performed by the Met Office (UK) Richard Smout, John Nash, Mark Smees, Darren Lyth, May.
Starter To complement our notes and learning from last lesson (Topic 10 Introducing Large ICT Systems: Features of Large ICT Systems), fold your piece.
IAEA International Atomic Energy Agency Arusha, Tanzania (NIGERIA) Dr Yau IDRIS 2 – 5 December 2013 RAF9038 Final Coordination Meeting.
Engineering Environment Awareness
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
Business Management - Intermediate 2Business Decision Areas © Copyright free to Business Education Network members 2007/2008B111/078 – BDA 1.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
RAF9038 Final Coordination Meeting
Process towards adoption of RAIS in Kenya: process and effects
Figure 9.8 User Evaluation Form
Testing the System.
IAEA E-learning Program
Safety in Construction and Upgrade Phases
System Development Life Cycle (SDLC)
Flooding Walkdown Guidance
System Development Life Cycle (SDLC)
Mark Smees, Catherine Gaffard, John Nash, (Met Office).
Premises Assurance Model
Mark Smees, Catherine Gaffard, John Nash, (Met Office).
System Development Life Cycle (SDLC)
Status of GSN-GUAN Improvement Activities
Workshops, Assignments and Work place visits
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
UNDP Asia Pacific Regional Centre August 2010
Presentation transcript:

Page 1© Crown copyright 2005 Voluntary Cooperation Work Richard Smout, John Nash, Jeremy Gillham, Mark Smees and Steve Palmer

Page 2© Crown copyright 2005 GOS / GUAN Support  Radiosonde ground station upgrades, new installations, evaluations and training:-  Pristina, Kosovo October 2003  Gan, Maldives September 2004  Dar Es Salaam, Tanzania October 2004  Yerevan, Armenia March 2005  Seychelles, June 2005  Nairobi, Kenya July 2006  Addis Ababa, Ethiopia August 2006

Page 3© Crown copyright 2005 GOS / GUAN Support  At all sites manual point selection was introduced, replacing the automatic version.  Automatic selection has a tendency to introduce biases!  Manual point selection was further verified by introducing a basic Tephigram plotting software.  A hydrogen safety brief was also given and potential hazards were explained.

Page 4© Crown copyright 2005 Pristina Kosovo  Any issues regarding observations applying corrections and taking readings were resolved.  Two Vaisala DigiCORA III GPS ground stations installed.  Observers and forecasters were trained on the operation of the system.

Page 5© Crown copyright 2005 Pristina Kosovo

Page 6© Crown copyright 2005 Gan Maldives  Vaisala DigiCORA III GPS ground station installed.  Observers and supervisors were trained on the operation of the system.  Two PCs were installed which allowed two people to train at the same time by running ‘simulation ascents’.

Page 7© Crown copyright 2005 Gan Maldives

Page 8© Crown copyright 2005 Gan Maldives

Page 9© Crown copyright 2005 Dar Es Salaam  Richard Thigpen (GCOS Implementation Project Manager) approached the Met Office to assess the suitability of the Intermet IMS1500 radio-theodolite installed at Dar Es Salaam international airport.  Initially there were problems with the ground station hardware. Whilst the engineers from America and South Africa resolved the issues the local staff were given practical training on radiosonde preparation and data analysis, using a portable Vaisala system supplied by the UK Met Office.

Page 10© Crown copyright 2005 Dar Es Salaam  Once the radio-theodolite was operating the local staff started an intensive training schedule allowing them to become very proficient in the use of the new ground station.  A number of operational problems were overcome, acquiring the radiosonde below the theodolite and temp message coding.  The result was that the IMS1500 radio- theodolite was fit for purpose.

Page 11© Crown copyright 2005

Page 12© Crown copyright 2005 Yerevan, Armenia  Customs problems delayed the installation of a Vaisala DigiCORA III GPS ground station from January to March  Fortunately for the UK team this meant that the temperature was more conducive to working outside.  The Vaisala MW11 donated parts to the SPS220 sounding sub-processor.

Page 13© Crown copyright 2005 Yerevan, Armenia

Page 14© Crown copyright 2005 Seychelles  The Seychelles already possessed a Vaisala MW15 sounding sub-processor.  The main processing unit was upgraded with software and the ‘mother board’ was modified to fly the RS92 GPS radiosonde.  Training followed the now familiar well established method.  Operating instructions were modified at each location to allow for minor variations in local operating practices and procedures.

Page 15© Crown copyright 2005

Page 16© Crown copyright 2005 Nairobi and Addis Ababa  Customs problems delayed the upgrades by two months.  Both stations had Vaisala MW12 ground stations which were upgraded to MW15s. The upgrade required the GPS and main processing unit (MPU13) cards from the old systems.  The MPU13 was upgraded to the latest version by replacing 3 on board program chips.  Technical staff were shown the upgrade process and care and maintenance procedures were also explained.

Page 17© Crown copyright 2005 Recommendations – Addis Ababa

Page 18© Crown copyright 2005 Recommendations – Addis Ababa

Page 19© Crown copyright 2005 Joined up thinking!  The workshop held in Argentina in May 2005 prepared the UK team responsible for upgrading Nairobi and Addis Ababa extremely well.  Questions such as how does the humidity sensor work are comprehensively explained in one of the documents presented at the work shop?  Copies of these documents are now carried as standard and made available on CDs along with all manuals used and prepared during an upgrade.  These documents are now reaching those who can benefit most, observers and radiosonde operators!

Page 20© Crown copyright 2005 Training  Training is a particular issue to the developing countries!  The workshops have proved to be a very effective means of delivering training!  Of course such instructions and guides are an essential part of any Quality Management System.

Page 21© Crown copyright 2005 Conclusions  The site visits showed common problems with training of the operations staff. In particular, there is a need to organise training and instructions for the observers in a systematic way. Often the main training route was on-the- job verbally from one observer to another; inevitably important issues are overlooked or bad practices institutionalised.

Page 22© Crown copyright 2005 Conclusions  There is a need for practical instruction manuals which cover the whole process of preparing the equipment, making the sounding, coding and sending the observations.  A set of guides was prepared as part of the training workshops, but there is a need for these to be amplified, and especially for them to be adapted with local information at every station, to be made easily available to the observers at their place of work, and to be kept up to date.

Page 23© Crown copyright 2005 And finally! Any questions?