Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
MTA Instrumentation M. Haney University of Illinois at Urbana-Champaign 25 February 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Instrumentation: ground and noise Temperature Measurement.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Goal of MICE:   out /  in of   Assuming a standard (or agreed to) definition of 6-D cooling.  We can also assume that the tracker can give.
LH2 Absorber Design Mary Anne Cummings MICE Safety Review LBL Dec 9, 2003.
Mucool LH2 Absorber Progress and Pauses Mary Anne Cummings FNAL August 12, 2002.
Feb Absorber/coil instrumentation and controls  Subsystems Absorbers RF Magnets  Monitoring/safety  Data acquisition: Information on system.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
The Interface Solution Experts Intrinsically Safe Design, TCM installs in: Class I, II, & III Div 1 and 2 (Zones 0/1 & 2) Up to 32 Channels.
3D Micromanufacturing Lab. School of Mechatronics Gwangju Institute of Science and Technology 3D Micromanufacturing Lab. School of Mechatronics Gwangju.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ENGINEERING APPLICATIONS Telecommunication Long Distance Communication Handle large number of channels Signalling purposes Computer Networks Connecting.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
SC Project Review of NCSX, April 8-10, 2008 NCSX Heater Control System P. L. Goranson Work package 1270.
Cooling Channel Instrumentation Update M. Haney University of Illinois at Urbana-Champaign 6 February 2004.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
PH4705 & ET4305: Digital Sensors
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Measurement Fundamentals Rajesh Vaidya DAQ Software Engineer Wed 10:15a, 12:45p, and 3:30p Colorado (6A) Rajesh Vaidya DAQ Software Engineer.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
15 March 2001Absorber Review Meeting at NIU1 DAQ for Pressure Test, and later... Michael J. Haney University of Illinois
© 2007 Ideal Industries 1 of 15 IDEAL Tracer Training Introduction on the IDEAL Industries, Model Series Tracers.
© 2007 Ideal Industries 1 of 15 IDEAL Tracer Training Introduction on the IDEAL Industries, Model Series Tracers.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Grounding.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Grounding.
ProtoDUNE SP – Slow control temperature readout setup test
Applications and Circuits
Vertex Detector Mechanical R&D Design Questions and Issues
THUM Adapter Impact on Hazardous Area Classification
Linac Test Area Instrumentation
SIDECAR ASIC Characterization Dan Pontillo
David Gunther Applied Optics 10 March 2005
Electrical Safety Standards
MuCool Test Facility Instrumentation Update
Linac Test Area Instrumentation
Setup for testing LHCb Inner Tracker Modules
University of Illinois (UIUC)
Single Detector Design
University of Illinois (UIUC)
Presentation transcript:

Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002

m. haney, et al.2 Instrumentation Need safe solution for instrumenting the LH 2 absorber in the LTA Prudent to accommodate MICE and European safety considerations –i.e. do it right the first time…

14 June 2002m. haney, et al.3 Primary Objective - Safety Intrinsic safety, if possible –Less than 1 watt (per channel?) –Good idea for Fermi; required for Europe Gas-purged enclosure, if necessary –19” rack, 40U tall

14 June 2002m. haney, et al.4 Signals inside (the cryostat) 12 (cryo) temperatures –readout via GPIB + LabView (PC) 25(ish) 4-wire bolometry strips Multiple fibers –FISO strain gages –Laser occlusion? –Simple spark detectors (light pipe to photodiode)

14 June 2002m. haney, et al.5 (more) Signals inside USB (4 wires, and shield) for CCD camera –via PC Piezo vibration sensor –via (16 chan/12 bit) ADC and LabView (PC) Local (64 chan/16 bit) IRM channels –via “LabView” (see last slide) MICE channels (?) –placeholder for the future…

14 June 2002m. haney, et al.6 Signals outside Many voltages, currents, temperatures, pressures –magnets, beam position monitors, etc. Most available from ACNET or local IRM –via “LabView” (see last slide) or Cyro-PLC –and Intellution

14 June 2002m. haney, et al.7 Two Possibilities (1) Intrinsically safe UPS PC w/32 chan ADC FISO Cryo(temp) IRM Barrier(s) network ACNET Sealed Conduit(s) Intrinsically safe signal conditioners and transmitters power Hazard Safe

14 June 2002m. haney, et al.8 Two Possibilities (2) Gas-purged box UPS PC w/32 chan ADC FISO Cryo(temp) IRM Barrier(s) network ACNET Sealed Conduit(s) power Hazard Safe

14 June 2002m. haney, et al.9 (basic) Barrier Power + Signal Return Ground “safe circuit” fuse

14 June 2002m. haney, et al.10 This Summer – Z. Conway LabView interface –GPIB –ADC –IRM

14 June 2002m. haney, et al.11 Open Issues Local signal condition vs Purged box –Common mode concerns (noise from magnets) Especially surge currents on start/stop –Long wires! 2-wire vs 4-wire solutions –Shielding and noise sensitivity in general –Cable plant size concern (already 200+ wires, not including shielding)

14 June 2002m. haney, et al.12 Open Issues (2) LabView vs C –to read ACNET data (mostly, IRMs outside of the experiment) Remote control of PC –Citrix ICA, PCAnyWhere, etc. –LabView web-remote instrumentation –KVM?