CWP Gas Job Funnel. CWP Funnel  CWP recently completed a gas funnel program for entry level laborer positions  Candidates were prescreened prior to.

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Operator Qualification
 Examples of bid-splitting Acceptable – When a project involves different trades and is not interdependent on the other. - If you are upgrading a room.
OFFSHORE PIPELINE CONSTRUCTION PHASE
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
North Dakota Gas Pipeline Safety Program 2011 Summary.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Student Book © 2004 Propane Education & Research CouncilPage Installing Corrosion Protection Systems for Underground Tanks & Metal Distribution.
Introduction to SSPC CAS Program
Natural Gas Boot Camp Webinar October 22, Introductions  Ann Randazzo – Executive Director, CEWD  Dana Berkheimer – Education Consultant, CEWD.
Topics To Be Covered NACE International – Overview NACE Standards & Technical Reports NACE Education & Certification.
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
 Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD  Elastomeric roof material did not completely adhere.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
TransCanada Corporation (TSX/NYSE: TRP)
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Gas Transmission Pipelines
The art of Engineering
BRAKE PADS PURPOSE Provide reliable stopping power with high temperature friction materials to stop or slow the vehicle. Provide reliable stopping power.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
Pavement Restoration on Main Replacement Projects Pipe Splitting and Keyhole Technology At Southwest Gas Corporation Southwest Gas Corporation Kenny Pollock.
Pipeline Pigging Incident
Stress Corrosion Cracking Overview & Introduction David Johnson December 2, 2003.
OPERATOR, Tester & INSTALLER Licensing WWQRR, Chapter 17, Part L
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
Gerry Lee APGA Security and Integrity Foundation OQ Program Manager APGA Security and Integrity Foundation Interstate Municipal.
Electrochemistry-Corrosion Corrosion. Involves oxidation of metal; often returning them to their natural state (oxides or ores) Happens because the oxidation.
South Dakota Gas Pipeline Safety Program 2011 Summary.
Examining Tower Guy Wire Anchor Rods Matthew J. Parker Atmospheric Technologies Group William R. Hinz Non-Destructive Examinations Group Westinghouse Savannah.
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
Excavator Safety DIG TESS Texas Administrative Code Title 16 Chapter 18 Underground Pipeline Damage Prevention.
1 SAN DIEGO COUNTY WATER AUTHORITY PIPELINE RELINING PROGRAM Keeping the Water Flowing.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Student Book © 2004 Propane Education & Research CouncilPage Making Repairs or Replacements on Propane Tubing Persons who repair or replace.
RAILROAD COMMISSION OF TEXAS Steven Rios Corpus Christi Area Manager September 2015.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
KINDER MORGAN ENERGY PARTNERS, L.P. Experience with Stress Corrosion Cracking (SCC) Scott Davis – Director of Pipeline Integrity and Facilities Engineering.
Maintaining Subsurface Drainage Andrew Leonard TSM 352.
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
Damage Prevention – Are States as engaged as they need to be ? Pipeline Safety Trust Meeting November 20, 2008 New Orleans, LA Glynn Blanton, PHMSA State.
Aeronautical drafters prepare engineering drawings that detail plans and specifications used in the manufacture of aircraft, missiles, and related parts.
Roof Hook SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Electrical hazard Awareness. What does hazard mean? Hazard means: any potential or actual threat to the wellbeing of people, machinery or environment.
The City of Mesa EFV Program Anthony Cadorin Gas Planning Engineer City of Mesa Natural Gas Division Mesa, Arizona.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
IMCO’s excavations in the vicinity of Olympic’s pipeline.
NGA Direct Assessment Projects Debbie DiMeo, Director, Plans and Operations Northeast Gas Association OPS ECDA Public Meeting November 4, 2003
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
Contractor Utility Coordination WisDOT Projects February 18 th, 2016.
Underground Pipelines Module #8 Prepared by Dr. Randy R. Rapp July 2005.
Materials Selection and Coatings
Culverts - Basic Structural Considerations
Recent Plastic Fusion Orders
AGA Distribution Best Practices Program
Piping.
Quality Control Personnel Training
Culverts - Basic Structural Considerations
מצוינות ארגונית בקרת תהליך הצביעה
Excavation.
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Locating Gas Structures
Pike Creek Dam Conduit Repair
Presentation transcript:

CWP Gas Job Funnel

CWP Funnel  CWP recently completed a gas funnel program for entry level laborer positions  Candidates were prescreened prior to entry into the program  Twelve people started the program  Program consisted of two weeks of training in construction and OSHA 10  Three weeks of Operator Qualification (OQ) hands-on and written testing and certification  Nine people completed the program  85% passed all the OQ

OQ Certifications  OQ #6 – Inspecting for atmospheric corrosion  OQ # 8 – Visually inspecting for internal corrosion  OQ # 11 – Applying pipe coating in the field  OQ # 12 - Cleaning and coating for atmospheric corrosion  OQ # 17 – Repair coating on steel pipes  OQ # 23 – Inspecting the condition of exposed metal pipe or pipe coating  OQ # 24 – Inspect pipe for damage  OQ # 31 – Installation of pipe

OQ Certifications  OQ # 40 – Install/replace tracer wire  OQ # 70 – Abnormal operating conditions  OQ # 71 – Operator excavation and backfilling in the vicinity of a pipeline

Next Steps  Hiring for pipeline expansion starts in April when conditions allow for digging  Five week class planned for April to allow for additional hands-on and written training, testing and certification