3-4 Sept. 2008EFW INST+SOC PDR141 Electric Field and Waves (EFW) Spin Plane Boom (SPB) Gregory Dalton Space Sciences Laboratory University of California.

Slides:



Advertisements
Similar presentations
THEMIS Instrument PDRRob Duck 1 UCB, October 15-16, 2003 EFI Axial Booms (AXB) Preliminary Design Review Rob Duck Mechanical Engineering Department and.
Advertisements

SPP Fields Antenna TRL6 Review Pre-PDR Mechanical Design Jeremy McCauley SSL UCB 7/18/2013 Current Configuration: SPP Spacecraft FIELDS, SPP-ANT-MEC-000.
THEMIS Instrument CDR 1 UCB, March 24-25, 2004 EFI AXIAL BOOMS (“AXB”) Critical Design Review Rob Duck Mechanical Engineering Department Space Sciences.
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
Mechanisms Shilling, Tim Lowrey, Anthony McArthur, Grayson.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
CINEMA PDR- MEC 1 CINEMA Mechanical Subsystem PDR August 22, 2008 David Glaser/Paul Turin.
1 UCB, May 04, 2005 Magnetometer Booms Vibration Issues Berkeley Composites Laboratory Department of Mechanical Engineering University of California at.
SPP FIELDS V5 Antenna Mechanical Peer Review David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
EFW AXB Spacecraft +Z Jeremy McCauley Aerospace Engineer
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
LPW Preamp/Sensor Overview Greg Delory, LPW Co-I MAVEN PFP Pre-CDR Peer Review May 10, 2011.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
THEMIS Instrument CDR 1 UCB, April , 2004 EFI Axial Booms Thermal Christopher Smith Thermal Engineer
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
Magnetometer Booms Critical Design Review Dr. Hari Dharan
Glass Flotation Network and Data Storage Lead Acid Battery Acoustic Release Anchor 378 Meter Aperture 32 3-axis vector sensors 12.2 meter spacing 378 meter.
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
Sept. 2008EFW INST+SOC PDR EFW AXB Jeremy McCauley Aerospace Engineer Space Sciences Laboratory, UCB AXB Spacecraft +Z.
Main Electronics Package
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Magnetometer Booms Critical Design Review Dr. Hari Dharan Berkeley Composites Laboratory Department of Mechanical.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
THEMIS Instrument PDR Bill Donakowski/ EFI Radial Boom 1 UCB, October 15-16, 2003 EFI Radial Boom EFI Radial Boom Mechanical (SPB Spin Plane Boom) Bill.
THEMIS Instrument CDR Bill Donakowski/ EFI Radial Boom 1 UCB, April EFI Radial Boom (SPB Spin Plane Boom) Bill Donakowski
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
THEMIS Instrument PDRMag Booms- 1 UCB, October 15-16, 2003 Magnetometer Booms (MAGS) Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
1 PFP Peer iCDR 2011/5/11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review STATIC Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept 30 – Oct RBSP EFW ICDR1 Integration and Test Michael Ludlam (EFW Systems Engineer)
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
Planetary Lander PDR Team Name
Double Star: Experiment Activities
Telescope - Mechanical
Gayle K. Martin November 14, 2016
Bill Donakowski Mechanical Engineer UCB/SSL
Spacecraft Interface and I&T
(EFW Systems Engineer) University of California, Berkeley
Electric Field and Waves Instrument (EFW)
Boom Electronics Board (BEB)
Low Voltage Power Supply & Power Controller Board
University of California, Berkeley
Spacecraft Structures
Korea University of Technology and Education
GLAST Large Area Telescope
Final Readiness Review
Mars Rover CDR Team Name
Post Deployment Analysis
Presentation transcript:

3-4 Sept. 2008EFW INST+SOC PDR141 Electric Field and Waves (EFW) Spin Plane Boom (SPB) Gregory Dalton Space Sciences Laboratory University of California – Berkeley EFW Spin Plane Boom

3-4 Sept. 2008EFW INST+SOC PDR142 Overview Design Requirements/Drivers Design Overview Theory of Operation Flight Heritage Custom Design for RBSP Analysis and Testing Overview

3-4 Sept. 2008EFW INST+SOC PDR143 Design Requirements/Drivers Thermal Interface Survival: -45 to +60°C Deployment: -20 to +40°C Preamp survival: -160 to 80°C Preamp science range: -55 to +70°C Mass NTE 2.42 kg Currently kg with Mounting Feet Design Deploy Sensor to 80/100m Tip-to-Tip with 4.7cm resolution Test/Enable Plug accessible on S/C Mount at 10° angle to S/C Panel 7 Conductor Cable to Preamp Preamp Enclosure designed for ease of assembly Keyreel designed to unfurl Fine Wire at 10m & 15 RPM

3-4 Sept. 2008EFW INST+SOC PDR144 Design Overview – Overall Dims [cm] inch SPHERE PREAMPLIFIER ENCLOSURE COMPOSITE CABLE FINE WIRE

3-4 Sept. 2008EFW INST+SOC PDR145 Design Overview - External ENABLE PLUG/ TEST CONNECTION MOUNTING FOOT SPOOL CONNECTION S/C PANEL

3-4 Sept. 2008EFW INST+SOC PDR146 Design Overview - Internal SPHERE CONTACT DOOR OPEN SWITCH RELEASE PIN DOOR RELEASE RING PIN PULLER METERING WHEEL DEPLOY MOTOR SCIENCE/ENG CONNECTORS END OF WIRE SWITCH SPOOL BRAKE CABLE CONNECTOR COMPOSITE CABLE SLIPRING SPOOL SECTION MOTOR SECTION MAGNETIC/ EMI SHIELD BEVEL GEARS CAM METERING WHEEL

3-4 Sept. 2008EFW INST+SOC PDR147 Design Overview – Preamp Enclosure STRAIN RELIEF TANTALUM SHIELD SCREW FITTING PWB USHER FERRULE CABLE HOLDER GUARD PREAMPLIFIER SPRING CONTACT PWB ASSEMBLY

3-4 Sept. 2008EFW INST+SOC PDR148 Theory of Operation Integration and Launch Stowed and Unpowered Composite Cable on Spool, held by Brake Sphere and Preamp caged by Doors Doors held closed by Release Pins

3-4 Sept. 2008EFW INST+SOC PDR149 Theory of Operation Deployment Release Ring rotates when Pin Puller Actuated Release pins move clear of Doors Doors open, indicated Motor pulls cable off Spool at ~2cm/s and meters Cable every 4.7cm At 10m and 15RPM, Fine Wire Unfurls End of Travel switch disables motor power

3-4 Sept. 2008EFW INST+SOC PDR150 Flight Heritage 25+ years mature Radial Boom design at SSL Mature Design/Vendor Familiarity Previous mission reviews and test data Critical components from proven vendors Test fixtures and procedures Original Dr. Pankow SPB design

3-4 Sept. 2008EFW INST+SOC PDR151 Custom Use for RBSP Gore Cable 100m Tip to Tip (~49m per boom) No coax Kapton vs. PTFE insulation Simplified Release Mechanism Pin Puller Secures own Power Redundant Packaged for RBSP Completely enclosed Panel Mount Electronics Modified Harness Door Open Indication RBSP Composite Cable

3-4 Sept. 2008EFW INST+SOC PDR152 Analysis - Damping CableDamping (J/rad^2) CRRES RBSP ETU Energy Dissipated per cycle per boom: Cable Damping Test Simple Pendulum test Tip Mass Simulates Cable Load Future test to include accurate RBSP tip mass and vacuum environment

3-4 Sept. 2008EFW INST+SOC PDR153 Analysis - CTE Coefficient of Thermal Expansion Design for low CTE Test from 20 – 80°C 12ppm/°C from RBSP prototype

3-4 Sept. 2008EFW INST+SOC PDR154 Setpoints and Margins Fine Wire: 0.009”ø, 7x7 strands, stress relieved stainless steel Construction > 50N breaking strength, tested with end conditions > 10:1 pulley to cable diameter ratio, de-rate cable strength to 85% -> 42N Predicted load during deployment: 6N Composite Cable: 3200 Denier Kevlar 49 strength member, 600N breaking strength Spool pullout force: 13N EOT motor power cutout: 45N Shear Pin: 135N Predicted load during deployment: 8N Motor Assembly: Bevel gear DF: >50 Motor manufacturer DF: 4x Continuous torque: 2120mNm (x2 after Bevel gears) Max intermittent: 4240mNm (x2 after Bevel gears) Torque to break shear pin: 4050mNm SPB Structure First Mode – 300hz

3-4 Sept. 2008EFW INST+SOC PDR155 Testing Prior to Environments: Motor burn-in, startup and running current tests Pin Puller power profile Margin Checks –Torque: Door springs, motor torque –Force: Spool pullout, EOT switch, door release, fine wire and composite cable proof loads Fine Wire force/deflection characterization Electrical Isolation Mass Properties Functional deploy – Self Shock Length Calibration THEMIS: 18 Month Motor Accelerated Life Test

3-4 Sept. 2008EFW INST+SOC PDR156 Testing Vibration per APL Environmental Test Spec New Fixtures for RBSP S/C Mounting – Force Limiting Unpowered Testing ETU to Qualification Levels, Flight to Acceptance Levels

3-4 Sept. 2008EFW INST+SOC PDR157 Testing Thermal Vacuum Survival Temp: -30 to +60°C Full Deployment Test: -25 to +55°C Modified Test Fixtures for RBSP –Protect Sphere surfaces –Lower Keyreel spring force –Mounting scheme

3-4 Sept. 2008EFW INST+SOC PDR158 Backup Slides Long Lead Items: Gore Cable –Samples in the Mail –CTE/Damping/Strength Tests –November Delivery Globe Motors –Order Placed –20 wks TiNi Pin Pullers –PO being processed –12 wks Sliprings –12 wks Ongoing Developments: Verify Composite Cable Production Design Mounting Foot Analysis

3-4 Sept. 2008EFW INST+SOC PDR159 Backup Slides Standard UCB Construction Machined Parts –6061T6 Aluminum –544 Bronze –Stainless Steel –Titanium –Delrin, PEEK, Vespel –Vulcanized Elastomer –Tantalum Finshes –Alodine –Anodized –DAG-213 –Gold Plating Thermal Treatments No Special Manufacturing Techniques