Brief Report on the Status of the AGATA Project (June 2012) A. Gadea (IFIC, Valencia) the AGATA PM on behalf of the AMB AGATA Collaboration Council Orsay.

Slides:



Advertisements
Similar presentations
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics & Astronomy The University of Edinburgh presented by Tom Davinson.
Advertisements

Advanced GAmma Tracking Array
Begoña Quintana Arnés PTU Alvaro Hernández Prieto PhD Electronic Physicist María Doncel Monasterio PhD.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
EGAN FEE synergy Working Group PROMETEO Workshop on Front-End Electronics for gamma and complementary detector systems November 2011I IFIC – Valencia.
AGATA A. Gadea (IFIC, CSIC-Univ. Valencia) for the AGATA collaboration FEE Workshop November 17 th -18 th 2011 PROMETEO.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
WP1: Detector Assembly Liverpool Tasks:  Detector specification measurement Assembly of components in progress  Detector assembly for scanning Work in.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
AGATA: Advanced Gamma Tracking Array
Characterisation & PSA Team Meeting Presentations –Liverpool Status, Andy Boston/Matt Dimmock (Liverpool) –Crosstalk properties of AGATA detectors, Bart.
Workshop on Physics on Nuclei at Extremes, Tokyo Institute of Technology, Institute for Nuclear Research and Nuclear Energy Bulgarian Academy.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
The GammaWare package Olivier Stézowski (on behalf of the Data Analysis Team) Data Analysis Workshop, Legnaro, November (including ADF)
AGATA: Advanced Gamma Tracking Array
M. Labiche - INTAG workshop GSI May Se - D prototype for the focal plane of the PRISMA spectrometer (Task4) Digitisers for SAGE & LISA (task1)
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
AGATA Pre-processing team report AGATA Week, July 2008.
Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &
Status of the AGATA Project June 2013 on behalf of the AMB AGATA Collaboration Council meeting June 2013.
Detectors and Preamplifiers Detector deliveries Customer Acceptance Tests Available detectors AGATA triple detectors Scanning program P. Reiter IKP University.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Teams: Simulation of key experiments Gamma-ray tracking Data analysis Databases Simulation and Data Analysis Working Group Department of Radiation Sciences.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
AGATA: Status of the Implementation and Performance A. Gadea (IFIC, CSIC-Univ. Valencia) for the AGATA collaboration.
Simulations and Software CBM Collaboration Meeting, GSI, 17 October 2008 Volker Friese Simulations Software Computing.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Data Analysis Working Group AGATA Tasks of the WG Schedule Johan Nyberg, ADAWG meeting, June 12-13, 2003, NBI.
NEDA collaboration meeting Neutron and light charged particle detector-arrays as complementary detectors for the future European large gamma-arrays AGATA,
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
What has been done Campaigns of insertion: 2 in Legnaro, 1 in GSI but few are not yet in the DataBase =>300 objects referenced and assembled but few are.
AGATA Detector Meeting March 16th, 2006, Cologne Detector Acceptance Tests: delivered: three symmetric detectors S001 properties excellent S002 properties.
E.Clément Novembre 2011 AGATA : Organisation of the campaign and technical aspect GANIL SC- September 2013.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Daniel Bloor & The AGATA Collaboration IoP NPPD Conference, University of Glasgow, 05/04/11. Development of a simulation package for fragmentation reactions.
Advanced Gamma Tracking Array Andy Boston The Advanced Gamma Tracking Array
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
AGATA MANAGEMENT BOARD AND TEAMS
1st PSeGe Workshop, IPNO & CSNSM Orsay 3rd -4th October 2016
Pre-Processing electronics Maintenance Hardware - Firmware
LKr status R. Fantechi.
Detector characterization overview of the AGATA scanning tables
Detectors and Preamplifiers
Status of the AGATA installation at GANIL
Status of the AGATA installation at GANIL
Hall A Compton Electron detector overview
AGATA Construction Database
AGATA Today at GANIL 12 Triple Cluster and 1 Double Cluster (38 detectors) on site ATC1 core B oscillating after capsule change ATC9 core B : high Voltage.
Presentation transcript:

Brief Report on the Status of the AGATA Project (June 2012) A. Gadea (IFIC, Valencia) the AGATA PM on behalf of the AMB AGATA Collaboration Council Orsay 27 th June 2012 Detector Module and Characterization Front-End Electronics Data Flow Data analysis, tracking and PSA Infrastructure and Complementary Detectors Simulations, Experimental Commissioning and Performance

GANIL-SPIRAL2 Caen E.Clement AMB Chairman Project Manager A.Gadea AGATA TASKS Comp. Det. Elec. and DAQ Integration Mechanical Infrastructure J. Strachan Software: Flow, Services & GRID Xavier Grave Complementary Detectors J.J. Valiente Global Trigger & Synchronization Marco Bellato Detector array Infrastructure Bénédicte Million Pre-processing Ian Lazarus Hardware: Local Infr. & Network Henning Schaftner Infrastructure. Comp. Det. E.Farnea Front-end Electronics (P.M.) Detector Module P.Reiter Data Flow A.Korichi AGATA MANAGEMENT BOARD AND TEAMS Resource Manager (Deputy PM) G.Duchêne Slow Control & FEE Monitoring Eric Legay Pre-Amplifier Digitizer Alberto Pullia Detector Characterisation Bart Bruyneel Detector CAT &Testing Helen Boston R & D on gamma Detectors & Applications Detector & Cryostat Bart Bruyneel AGATA Physics & exp. Simulation Marc Labiche Performance and Simulation J.Nyberg Quality Control Compatibility EMC, Interfacing Specification control Documentation and Safety AGATA Commissioning C. Domingo-Pardo Technical Coordinator Engineering Advi. Data Analysis & TRACKING Olivier Stezowski A. Lopez-Martens Data Analysis A.Boston GRID Data managing and Analysis PSA Algorithm Development R. Gernhauser. Local Campaign Managers (LCM) INFN-LNL Legnaro E.Farnea AGATA Working Groups A. Gadea (Project Manager) GSI Darmstadt H.J.Wollersheim Thanks Pete! A.Boston, G.Duchêne, E. Farnea (LCM LNL), A. Korichi, P. Reiter and J.Nyberg. H.J.Wollersheim (LCM-GSI), E.Clement (LCM-GANIL)

AGATA Capsules & Cryostats Summary 32 purchased. No new orders since July new capsules + 1 new Triple cryostat financed in Detectors Delivered: A001, A002, A003, A004, A005, A006, A007, A008, A009 B001, B002, B003, B004, B005, B006, B007, B008, B009, B010, B011, B012 C001, C002, C003, C004, C005, C006, C007, C008, C009, C010 1 Detector to be delivered: B013 4 Detectors under warranty repair (now expected to be delivered within summer) A009, B006, B007, C007 5 Detectors to be sent for repair A005, B005, B009, C002, C004 1 Detector under CAT C009 Only 21 Detectors available presently (22 if the 2 CAT’s ok) Deliveries needed to complete the 25 capsule system. Moratoria: waiting for all deliveries before submitting new purchasing orders Maintenance performed for all Demonstrator Capsules 6 Triple and 5 Double Cryostats available. IKP-Köln, Uni. Liverpool, IRFU-SAclay, TU-Darmstadt, INFN-LNL, INFN-Padova, IPHC Strasburg, GSI-Darmstadt, LRI Salamanca Negotiations with Canberra ongoing on repairing costs

AGATA FEE Production CSNSM Orsay, INFN Padova,IPHC Strasbourg, STFC Daresbury, Uni. Liverpool SEGMENT MEZZANINE CORE MEZZANINE ATCA CARRIER GTS MEZZANINE DIGITIZERS: From 11 modules planned all ready tested and working. ATCA CARRIER: 24 cards to be produced. Production ongoing, 11 cards already delivered and tested. Other 11 with problems in Network or PS. CORE MEZZANINES: 25 tested and available. SEGMENT MEZZANINES: 76 in production. Delivery expected during AGATA week. TCLK CARDS: 10 new ones available GTS MEZZANINES: 37 new produced and tested, LINCO2 READOUT MODULES: 25 Produced and delivered, now under functional test GTS VME CARRIERS: 20 new VME GTS carriers produced and tested. INSTALLATION: at GSI is being performed in two phases, i.e. 15 Capsule and then upgrade to 25. AGATA DIGITIZER

Future Electronics R&D Group has been busy with the production of the Early Phase 1 Investigation of new ADCs with 8 channels from Linear technologies with considerably reduced power consumption. Pre-processing Mother board based on Exogam II 220 x 220 mm. Power consumption 30 to 40 W Price 15 keuros + 20% -0% per capsule. Requires new manpower available). INFN-Padova / INFN-Milano Proposal (Distributed Solution): CSNSM-Orsay Proposal (embedded Electronics concept): Partially compatible with the present Electronics Pre-processing and ADC Electronics already at prototyping stage (firmware partially implemented and tested for 38 channels) Cost < 25 k€/capsule ADC Card mounting Pre- Processing Card

Early Phase 1 AGATA Data Flow NARVAL at GSI IPN-Orsay, CSNSM-Orsay, INFN-LNL, GSI, GANIL, IFJ-PAN-Crakow, IPN-Lyon A substantial upgrade has to be done to the Data Flow Farm for Early Phase 1. Excellent compatibility of new Pizza Boxes with LINCO2. Narval version tested and working - Enables to set a depth for the IO buffers - It fixes a start/stop issues in actors - it uses screen title and sessions names The new data format has been discussed, new version of the ADF Library available. MBS with AGAVA - AGATA Data Flow working. New Event builder compiled and tested with the new NARVAL version (to be installed) A new filter called adf analyzer is available, it removes data from ADF frames, the generated output will be used by a pattern builder. Pattern builder and event collectors are already designed. MBS status : two shared libraries to get and send data to MBS are developed and tested. Network and GRID: network structure defined. The GSI site is connected to CC-IN2P3-Lyon through the HEPPI-network. Data can be transferred to the AGATA-Grid via this link.

Infrastructure: Mechanics and DSS IRFU-Saclay, GSI, STFC-Daresbury, IPN-Lyon, JYFL-Jyvaskyla, IPHC-Strasbourg, GANIL, INFN-LNL, INFN-Padova, INFN-Milano AXIS LVPS:14 AXIS LVPS already available. Patch boxes: test of the prototype patch box successful. Presently under production (few available). Autofill system: The AGATA autofill system has been modified in order to cope with the different cryogenic infrastructure at GSI. It has been delivered and is being commissioned. HV System R&D: IRFU-Saclay has no personnel available to continue with the development. Construction Database: Installed and ready at GSI Mechanical Infrastructures: The production was done timely. After the mounting test, in March the installation was completed. All working with only minor issues. Reaction chamber designed and produced at IKP-Cologne. 5 Clusters already mounted in the structure Installation at GSI: All the W.G. participating actively

Data Analysis, Pulse Shape Analysis & Tracking PSA &Tracking: The PSA team is focusing on the requirements for the GSI phase. Key issues: The implementation of multiple interaction basis PSA using the Particle Swarm Algorithm (M. Schlarb TUM). The update of the detector basis data sets and validation of ADL basis. To agree and understand the requirements for the commissioning experiments. The plan remains to have two PSA codes available for the start of the GSI Campaign: Data Analysis: O. Stezowski has made available an updated version of the analysis software. The EGAN School took place in Liverpool, last November, had 35 participants, with the vast majority looking to gain experience in the analysis of AGATA data. The majority of the material from the school is available for download from the school website Meeting to follow up the AGATA data analysis steps in Q Data analysis on GRID is under study at IPN-Orsay and IFIC-Valencia. CSNSM-Orsay, IPN-Lyon, INFN-Padova, IRFU-Saclay, TU-Munich, Uni. Liverpool

Commissioning: The commissioning is consisting of two parts, a technical one devoted to the integration of AGATA with all subsystems (FRS, LYCCA & HECTOR), and a performance one, devoted to the study of the AGATA performance under experimental conditions typical of GSI/FRS.. The AGATA performance commissioning (2nd part of the commissioning) will use a primary beam of (preferably) 80Kr in order to measure both Coulex and particle knockout. To be done in GSI beamtime Block 2 23 July - 9 September 2012 Simulations: produced simulated data for typical GSI experiments, a secondary fragmentation reaction and a Coulomb excitation reaction, with atomic backgrounds included. The output files were made available to the PSA working group to test the different algorithms. The Coulomb excitation simulation is based on a recent GSI experiment (S377 - Coulex of 33Ar). The input file for the AGATA code contains information on the outgoing nucleus from MOCADI, atomic background from the abkg code, and 33Ar transitions from the ToGeant.C script which is part of the Gammaware package Uni. Uppsala, INFN-Padova, STFC Daresbury, IFIC Valencia, GSI Simulations, Experimental Commissioning and Performance

GSI-FRS Commissioning HECTOR AGATA ATC ADC Before Doppler Correction Thanks to: M.Reese et al. and the AGATA and GSI collaborators 10keV 136 Xe (137 MeV/u) Au v/c ~ 50% hit pattern of AGATA detectors