© FREQUENTIS 2010 Datum: 01.06.2010Rev.1 Autor: ODOSeite: 1 FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer Frequentis California, Inc.

Slides:



Advertisements
Similar presentations
FPL2012 Message Conversion and Migration
Advertisements

ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Transition & Roll-Over Period Kim Breivik Chairman EUR 2012 Task Force Operational Requirements,
An Approach to Wrap Legacy Applications into Web Services Wesal Al Belushi, Youcef Baghdadi Department of Computer Science, Sultan Qaboos University, Sultanate.
International Civil Aviation Organization European and North Atlantic Office OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
MEPO Training MEPO Database Access Training Presentation Copyright 2011 Rodger B. Fluke, MPA.
SYSTEM ANALYSIS & DESIGN (DCT 2013)
© 2007 Pearson Education Inc., Upper Saddle River, NJ. All rights reserved.1 Computer Networks and Internets with Internet Applications, 4e By Douglas.
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
Kendall & KendallCopyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall 9 Kendall & Kendall Systems Analysis and Design, 9e Process Specifications.
1 of 7 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Chapter 19 Binding Protocol Addresses (ARP) Chapter 20 IP Datagrams and Datagram Forwarding.
TCP/IP Protocol Suite 1 Chapter 6 Upon completion you will be able to: Delivery, Forwarding, and Routing of IP Packets Understand the different types of.
Service Broker Lesson 11. Skills Matrix Service Broker Service Broker, provides a solution to common problems with message delivery and consistency that.
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
Systems Analysis Chapter 8 P 94 to P 101
Welcome to State of Michigan Time & Expense Processing Employee Expense - No Advance (Day Trip) Tutorial Brought to you by the Office of Financial Management.
A Brief Taxonomy of Firewalls
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 31 Slide 1 Service-centric Software Engineering 2.
Introduction to IT and Communications Technology Justin Champion Network Connections & Number Systems.
Sage CRM Developers Course
4-1 Coding Complete COBOL Programs: The PROCEDURE DIVISION Chapter 4.
4-1 COBOL for the 21 st Century Nancy Stern Hofstra University Robert A. Stern Nassau Community College James P. Ley University of Wisconsin-Stout (Emeritus)
1 Chapter 4. To familiarize you with methods used to 1. Access input and output files 2. Read data from an input file 3. Perform simple move operations.
Welcome to State of Michigan Time & Expense Processing Employee Expense Modification With Advance Tutorial Brought to you by the Office of Financial Management.
October 2003Bent Thomsen - FIT 3-21 IT – som værktøj Bent Thomsen Institut for Datalogi Aalborg Universitet.
PMS /134/182 HEX 0886B6 PMS /39/80 HEX 5E2750 PMS /168/180 HEX 00A8B4 PMS /190/40 HEX 66CC33 By Adrian Gardener Date 9 July 2012.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
1 Data List Spreadsheets or simple databases - a different use of Spreadsheets Bent Thomsen.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
Duty Log and Chat Setup SSG Frese, Jerome S. Sensor Manager Cell 12 MDD.
The Client/Server Database Environment Ployphan Sornsuwit KPRU Ref.
FPL2012 TF#7Brussels 10 October 2012 Kim Breivik Operational Requirements Network Management EUROCONTROL Deployment.
(Spring 2015) Instructor: Craig Duckett Lecture 10: Tuesday, May 12, 2015 Mere Mortals Chap. 7 Summary, Team Work Time 1.
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
Customizing ArcReader to support GPS Kelly Johnston Indiana Department of Environmental Management.
Enhancing Forms with OLE Fields, Hyperlinks, and Subforms – Project 5.
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Welcome to State of Michigan Time & Expense Processing Employee Expense Modification (No Advance) Tutorial Brought to you by the Office of Financial Management.
McGraw-Hill/Irwin The Interactive Computing Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Working with Data Lists.
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 4: Planning and Configuring Routing and Switching.
Slide 1 Service-centric Software Engineering. Slide 2 Objectives To explain the notion of a reusable service, based on web service standards, that provides.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Special Education Self Review (SESR) Activity Three: Corrective.
CIS 250 Advanced Computer Applications Database Management Systems.
Semester 1 v CCNA 1 Module 1:Introduction. Semester 1 v Connecting to the Internet.
 Simulation enables the study of complex system.  Simulation is a good approach when analytic study of a system is not possible or very complex.  Informational,
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Access Control Lists Accessing the WAN – Chapter 5.
Topic 4: Distributed Objects Dr. Ayman Srour Faculty of Applied Engineering and Urban Planning University of Palestine.
Training Guide for Residents
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 Issues with Certain Fields.
OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop
FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
FILING OF VFR FLIGHT PLANS
Oracle Subledger Accounting
FAA Implementation of Amendment 1
ARP and RARP Objectives Chapter 7 Upon completion you will be able to:
FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011
OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop
CIS 321 Data Communications & Networking
Introducing ACL Operation
Service-centric Software Engineering
What’s changed in the Shibboleth 1.2 Origin
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 4: Planning and Configuring Routing and Switching.
Travel Expenses Tool Instruction Manual
Bent Thomsen Institut for Datalogi Aalborg Universitet
Exceptions and networking
Presentation transcript:

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 1 FPL 2012 Kym Shenton Senior Technical Engineer/Safety Engineer Frequentis California, Inc. Monterey, California

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 2 Outstanding Questions for FPL 2012  ICAO changes to ATS messages for DEP 1.What is the purpose of a DEParture message in the future? (DEP-AIRID-FROM0200-DEST-DOF/111207) 2.How can a flight Depart in the Future?  No item 18 at all for ARR ATS messages. Why is this different from DEP messages? You cannot arrive or depart in the future!  Sorting of field 18, yes or no?  With all the changes, why wasn’t the EOBT required in all ATS messages? This would alleviate problems with matching ATS to flight plans and allow multiple instances in the same day of flights with the same AIRID, departure and destination.  Mutually exclusive fields in item 10b. No need to allow all possible combinations of values since only one of the values E,H,I,L,P,X,S would be valid at any one time.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 3 smartFPL2012 Converter Kym Shenton

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 4 Background  ICAO has introduced changes to the format for flight plan and associated ATS messages in Amendment 1 to the Procedures for Air Navigation Services — Air Traffic Management, Fifteenth Edition (PANS-ATM, Doc 4444).  The changes in this amendment will be effective on November 15,  Some ANSPs have ATM Systems (i.e. FDPS) that will not be upgraded on-time to meet the FPL 2012 format (NEW Format)  These ANSPs will need to implement an FPL2012 Converter

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 5 Frequentis Solution = smartFPL2012 Converter  Provides the ability to allow legacy systems to remain unchanged.  Provides bi-directional conversion between the PRESENT and 2012 (NEW) formats.  Provides the ability to hold messages for distribution 24 hours prior to the Estimated Of Block Time (EOBT) in the flight plan message.  Installed between an AFTN/AMHS System and ATM System (ie. FDPS)  Can be hosted on the same computer servers as the AFTN/AMHS system or on separate set of servers.  The interface between the converter and the ATM System can be based on the standard AFTN over asynchronous protocol as defined in ICAO Annex 10 or a TCP/IP based connection.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 6 smartFPL2012 Converter

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 7 Changes to FPL Format  Field 10: Equipment and Capacity –The equipment field is being changed to include a significant number of new equipment and capabilities, mostly dealing with new communications, navigation, and surveillance technologies  Field 13 –The EOBT has been added to field 13 for ATS messages arrival (ARR), change (CHG) and cancel (CNL).  Field 15 –The bearing and distance from a navaid can now be applied to any significant point, such as a waypoint. This has typically already been in use so no conversion is done for field 15.  Field 18 –Field 18 is required in all flight plans and ATS messages (except ARR) whose EOBT is more than 24 hours from the current time. In addition, a number of new items have been added to further describe equipment and capabilities.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 8 Functional Description

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 9 Message Reception From the AFTN/AMHS  Upon receipt of a message from the AFTN/AMHS System, the smartFPLConverter checks the type of the message and forwards messages that are not related to flight planning directly to the FDPS.  Flight Plans and ATS messages (CHG, DLA, CNL, DEP, ARR) that are in the NEW 2012 format are converted to the PRESENT format.  Messages converted to the PRESENT format are held on the converter until a 24 hours prior to the EOBT on the Date of Flight (DOF). At that time they are transmitted to the FDPS.  Messages received from the AFTN/AMHS System that are already in the PRESENT format are sent directly to the FDPS.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 10 Conversion from NEW to PRESENT Format  The NEW format allows messages to be distributed up to 120 hours prior to flight time. –Flight and other ATS messages with DOF data in Field 18 are held on the smartConverter until 24 hours prior to the EOBT.  A table-driven model is used for the conversion governed by a user configurable “Rules” database. This database allows for local variations in ATS Message and procedures to be supported as well as the support of future ICAO procedures and formats.  The Rules data base is 4 tables in one: -A table controlling conversions related to Field 10a -A table controlling conversions related to Field 10b -A table controlling conversions related to Field 18 -A table controlling the order of data items in Field18

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 11 Conversion from NEW to PRESENT Format (continued)  The Rules Database is bi-directional. Each entry defines the procedures for New-to-Present conversion and Present-to-New conversion  Each rule defines: -The conditions under which a rule shall be applied -The conversion to be taken  Rules can be combined to form complex condition/conversion rules  The goal of the conversion process is that an ATS Message (FPL, CHG etc.) can be converted from one format to another and, if the conversion is reversed, the result will be as close to the original message as possible.  In the course of New-to-Present conversion, advanced 2012 format data is retained in various Field 18 items including the Remarks item.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 12 Conversion from NEW to PRESENT Format (continued) Present Rules New Rules The above Rules example shows a portion of the Field 10a Conversion table. As an example, if a “J3” code appears in a New formatted FPL, it is converted to a “J” code in the Present format and, in addition, two Field 18 items are added to the message: “NAV/V” and “COM/J3”. Note that the J3 rule is composed of two rule lines as indicated by the “C” in the continuation column.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 13 Conversion from NEW to PRESENT Format (continued) Present Rules New Rules The above Rules example shows a portion of Field 10b and Field 18 rules. It shows, for example, that if a DLE item is received in a New FPL, it is converted to data in the RMK (Remarks) descriptor item since the DLE descriptor is not supported under the Present rules. The asterisk indicates that associated variable data is to be copied to the Present FPL.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 14 Conversion from NEW to PRESENT Format (continued)  Depending on the direction of conversion, one side of the rules table defines matching conditions (the “From Side”) and the other side of the table defines the conversions to be made (the “To Side”).  The conversion process is governed by the Rules table. The process starts at the top of the table and proceeds in order to the bottom. For each rule the system does the following: -Tests if the conditions in the rule (the “From Side” of the table) match the message to be converted -If all the conditions match, the data from the “To Side” is moved to the output message -All matching conditions on the From Side are deleted from the input message so they will not matched by subsequent rules.  When all conversions are completed on Fields 10 and 18, the converted message is rebuilt and all other fields are included mostly unchanged from the original.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 15  No indicators within item 18 will be repeated. Thus, there is only one occurrence of NAV/ or COM/ or RMK/ etc. within item 18: –This means that if item 18 already has a NAV/ field, the addition of a second NAV/ field will not add the NAV/ a second time, but will add the data after the NAV/ to the already existing NAV/ field. For instance, item 18 already contains NAV/XXXX. Item 18 contains PBN/B1. The converted item 18 field will have “NAV/XXXX RNAV5 B1” and not “NAV/XXXX NAV/RNAV5 B1”. –The order of the Field 18 items in the converted message is determined by the seq18 column of the rules database. –If the smartConvert2012 program cannot decode an incoming ATS message, the message is forwarded unchanged to the destination system (FDPS). Conversion from NEW to PRESENT Format (continued)

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 16 Message Reception From the FDPS  All flight plans and ATS messages are converted to the NEW 2012 format and forwarded directly to the AFTN/AMHS System.  As stated earlier, the Rules Database is bi-directional. Each entry defines the procedures for New-to-Present conversion and Present- to-New conversion  The smartConvert2012 system provides complete traceability of all messages handled and conversions made by the system.  All activity is logged.  Operations people can recall any message and see the before and after versions.

© FREQUENTIS 2010 Datum: Rev.1 Autor: ODOSeite: 17 Conclusion  Frequentis offers an alternative to ANSPs and CAAs allowing them to avoid expensive upgrades of their current ATM systems to support the new FPL 2012 Flight Plan format.  Interface with any AFTN/AMHS systems available in the market  Can be configured with Single or dual (redundant) computer servers deployment.  Supports fully automated conversion without need for operator intervention.  Comes with modern Graphical User Interface for system configuration.