TABLE OF CONTENTS: MISSISSAUGA PUBLIC LIBRARY PROJECT – RDH ARCHITECTS SLIDE #1 IMAGES OF EXISTING THREE LIBRARIES BEFORE RENOVATION; DRAWING AND TEXT.

Slides:



Advertisements
Similar presentations
2012 OLA Library Building Awards Public Libraries
Advertisements

TORONTO PUBLIC LIBRARY THORNCLIFFE BRANCH. PHOTOGRAPHS Interior view of library from entrance area……………………………………………………………………………………………… 3 Interior view.
OLA Library Building Award Architectural Design and Transformation Ottawa Public Library Sunnyside Branch submitted May 2012 BiblioOttawaLibrary.ca.
RICHVIEW LIBRARY- Ground Floor Interior Renovation TABLE OF CONTENTS Submission for OLA Library Building Award 2012 Richview Library – Ground Floor Interior.
CAMBRIDGE LIBRARIES & GALLERIES QUEEN SQUARE LIBRARY.
OLA Library Building Awards Centreton Branch Library 1 Original Community Centre & Library 2 Original Entrance 3 Original Community Centre & Library 4.
Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
Crescent Academy International
Moller House(1928) – ADOLF LOOS
Margie Knoedel Senior Librarian Hennepin County Library.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
FourFront Design, Inc. WDT Project Update August 3, 2012.
Current Project Update October 25th 2012 Good Evening!!!
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
INSTRUCTIONS The Southeast Region Architectural Exhibit submittal package will be placed on this template. All projects must have been completed and occupied.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Built in 1929, last remodel 1940 image at left shows current footprint (3 rd floor)
Please note that the architectural renderings that follow lack detail and accurate use of color. They are conceptual illustrations – not necessarily precise.
all images courtesy preston scott cohen preston-scott-cohen- tel-aviv-museum-of-art-complete.html.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
Please note that the architectural renderings that follow lack detail and accurate use of color. They are conceptual illustrations – not necessarily precise.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
Redwood City Port Commission February 22, 2006 Redwood City Library Foundation Redwood Shores Community Association.
Creating With Code.
Benignus Elementary Klein Independent School District Spencer Partnership Architects Exterior Material Review April 1, 2005.
Physical Sciences Complex at the University of Maryland 01Oct05 MAPP.
AF SHCR Smoky Lake, Alberta PROPOSED SITE PLAN Office Entrance Formal Entrance Primary Entrance Youth & Wheelchair Entrance.
Schematic design presentation School of Business South Hall Renovation.
OLA Library Building Award. Interior Views of Library Entrance Major Public Services Position Typical User Areas Public Spaces – Existing Light Only Major.
Project Name: Fill in Here. Project Location: Fill in Here. Architect(s): (names and addresses) Fill in Here. Masonry Contractor: Fill in Here. Owner of.
Schematic Design Jason Greer. Name: Villanova University: School of Law Location: Villanova, PA Owner: Villanova University Size: 170,000 SF Cost: $56,566,661.
U Building Area: (sf) 4100sf Anticipated date of completion: Spring 2010 Location of Project: Sarasota, FL Type of Project: Residential Construction.
Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
Plans to achieve our goals were approved unanimously by the Temple Board on June 11, 2008, and by the congregational meeting on June 22nd without a dissenting.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Dining.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
SP+a © Sameep Padora and Associates BASERA-E-TABASUM BASERA-E-TABASUM, BEERWAH KASHMIR.
Mental Health Care Center / psychiatric Hospital
Punch! Pro Platinum Home Design Draw Interior Walls to Create Rooms.
Slide 1 Insert your own content.. Slide 2 Insert your own content.
Images were sourced from the following web sites: Slide 2:commons.wikimedia.org/wiki/File:BorromeanRing...commons.wikimedia.org/wiki/File:BorromeanRing...
History of the Campus at Mile End QMUL Staff Induction 15 th June 2016 By Lorraine Screene, College Archivist Mile End.
THE AMERICAN INSTITUTE OF ARCHITECTS
Huntington Convention Center of Cleveland &
Regulations for title slide:
Project /Jury PowerPoint Submission Requirements
Program Summary: Program Description:
3d Architectural Visualization Company
Drawing & Building Names
THE AMERICAN INSTITUTE OF ARCHITECTS
Zoning We are about to build The Woodlands Community to the City of Mississauga development standards. ARCH – Architectural Studio 2.
Progress Report 11/10/11.
THE AMERICAN INSTITUTE OF ARCHITECTS
Slide 1 Insert your own content.. Slide 1 Insert your own content.
External Text Features
2007 Bond Issue Capital Improvement Program
Bacon St. Offices.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Slide 1 Insert your own content.. Slide 1 Insert your own content.
Regulations for title slide:
We cover your image needs in Office
DOVER ELEMENTARY Existing MPB (2/14/12).
regulations for title slide:
THE AMERICAN INSTITUTE OF ARCHITECTS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
THE AMERICAN INSTITUTE OF ARCHITECTS
Keystone Library Deliverables
250 Catalonia Building Remarks:
Presentation transcript:

TABLE OF CONTENTS: MISSISSAUGA PUBLIC LIBRARY PROJECT – RDH ARCHITECTS SLIDE #1 IMAGES OF EXISTING THREE LIBRARIES BEFORE RENOVATION; DRAWING AND TEXT ILLUSTRATING CONCEPTUAL VOCABULARY SLIDE #2 MPL1- LAKEVIEW LIBRARY : EXTERIOR VIEW OF LIBRARY IN PARK SETTING; INTERIOR VIEWS OF ENTRY AND CIRCULATION; QUIET STUDY ROOM; PUBLIC READING ATRIUM; DETAIL VIEW OF CANOPY SLIDE #3 MPL1 - LAKEVIEW LIBRARY : DETAIL IMAGE OF CANOPY LOUVRES; PLAN DRAWING; LAYERED VIEW THROUGH QUIET STUDY ROOM SLIDE #4 MPL1 - LAKEVIEW LIBRARY: IMAGE OF CHILDRENS AREA TO THE RIGHT AND STAFF OFFICE TO THE LEFT. SLIDE #5 :MPL2 - PORT CREDIT LIBRARY: IMAGE OF LIBRARY WITHIN PARK SETTING; SITE PLAN DRAWING SLIDE #6 MPL2 - PORT CREDIT LIBRARY: FLOOR PLAN DRAWING; IMAGE OF PUBLIC READING ATRIUM SLIDE #7 MPL2 - PORT CREDIT LIBRARY: EXTERIOR IMAGES OF SOUTH FAÇADE; INTERIOR VIEW OF GROUP STUDY ROOM SLIDE #8MPL3 – LORNE PARK LIBRARY: EXTERIOR VIEW OF BUILDING; PLAN DRAWING SLIDE #9MPL3- LORNE PARK LIBRARY: DETAIL VIEW OF CANOPY MEETING EXISTING BRICK; INTERIOR VIEW OF ENTRY AND INTERNAL STREET; VIEW OF PUBLIC READING ATRIUM