THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.

Slides:



Advertisements
Similar presentations
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Advertisements

Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
Irish Gulf, Boston, NY  Vertical eroding banks  Urban  Pool-riffle-pool regime  Gravel-cobble bed stream  Small stream (average width 30 ft, 10 ft.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP}
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
GOODWIN MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
DESIGNING BENDWAY WEIRS
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
River Research & Design, Inc.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
MISSOURI RIVER INNOVATIVE BANK STABILIZATION & AQUATIC & RIPARIAN HABITAT LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD.
SOIL-CHOKED STONE KEYS WITH VEGETATION
RACKET ELK CITY LAKE NEAR INDEPENDENCE, KANSAS PROJECT CONSTRUCTED DECEMBER 7-9, 2008.
SKUNK RIVER PIPELINE PROTECTION PROJECT NEAR DENMARK, IOWA SUB MAR.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
West Fork Beaver River, West Point, OH. Constructed Sept Minimal height Bendway Weirs in a gravel-cobble-sand-silt bed stream for thalweg realignment.
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Headcut gets taller & ACM mat flips out of the upstream key trench of the downstream pipe crossing, which causes problems. Project.
ONONDAGA CREEK, NEAR SYRACUSE, NY
SINGLE STONE BENDWAY WEIRS
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
Anthony Keene Kristin LaForge CIVE 717 Spring 2018
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

THE ENGINEERED FLOODPLAIN BENCH

Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either one or both banks of the floodplain Or, construct bankfull floodplain benches on either one or both banks

Some designs are very complex, here is a three- stage channel Mini floodplain bench active channel Wet meadow Floodplain bench elevation at height of channel forming discharge

NARROW FLOODPLAIN BENCH ON THE OTTAWA RIVER, OTTAWA HILLS, OHIO

Mini floodplain bench

Looking DS on the Ottawa River, OH, (sand-gravel, less than 1% slope, urban, pool-riffle-pool) note slower water within the veg along left bank, Ottawa River, Ottawa Hills, OH River thalweg delineated by bubble trails

Looking DS, close-up shot Ottawa River, note drag from plants vectoring thalweg away from the bank (second black arrow) Dense plants on narrow floodplain bench effectively reducing near- bank flood velocities!!

Looking narrow Ottawa River floodplain low flow. Derrick-7/26/2007

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY PIKE COUNTY PUBLIC WORKS DEPT, LaDON ATKINSON, ROAD SUPERVISOR

HAW CREEK GENERAL INFORMATION  Bank erosion is threatening county road, threatening public safety  Stream wildly meandering in response to historic straightening  Decent riparian areas in places  Bed material: gravel-sand. Channel is incised  Pool-riffle-pool regime, slope less than 1%  Average width ft, 14 ft tall banks  Funding, equipment, and manpower provided by Pike County, MO

PRE-PROJECT PHOTOS by JAYNIE DOERR, REGULATORY, ST. LOUIS DISTRICT FEBRUARY 25, 2009

Looking the lower end of the project bend. The last two trees undercut & fell in water PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR

Looking the project bend. Road is 4 ft from 14 ft tall eroding bank. PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR

QUESTIONABLE STONE Stone used for keys & LPSTP was a sub-standard shot rock of questionable hardness. The amount of fine material was close to 20-30%. This was a self-filtering stone (too many fines), but not well-graded, & not self-adjusting.

Stone is not well-graded & too many fines. The stone is self- filtering, but not self-adjusting, but only $4.70/ton delivered. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

STONE COSTS However, the stone was extremely inexpensive. The 432 tons of rock used in the project, at $4.70 per ton (delivered) total cost of stone = $2032. Very cost effective for what was accomplished. Almost like we paid for hauling & they threw in the stone for free!!

HAW CREEK METHODS EMPLOYED  110 ft of Longitudinal Peaked Stone Toe Protection (LPSTP), crest built to 4 ft above the base flow water surface elevation  Locked Logs  A vegetated floodplain bench, planted on a grid  Live Siltation  Live Willow Pole Plantings  Living Dikes  Single-Stone & Short Bendway Weirs  Vegetated & curved upstream key, straight DS key  After the fact Joint Planting in DS riprap bank

We will construct from upstream (US) to downstream (DS)

LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)

Stream channel Top bank Eroding bank ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Road

Two fallen trees were angled downstream 30 degrees from the bank with the root wads upstream against the eroding bank ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Road

LONGITUDINAL PEAKED STONE TOE PROTECTION {LPSTP}  Description: A continuous stone dike placed longitudinally at, or slightly streamward of, the toe of the eroding bank. Cross-section is triangular. The LPSTP does not necessarily follow the toe exactly, but can be placed to form a "smoothed" alignment through the bend. Smoothed alignment might not be desirable from the environmental or energy dissipation points of view. Amount of stone used (2 tons/linear ft, 1 ton/ft, or less) depends on depth of scour at the toe, estimated stream forces (impinging flow) on the bank, and flood durations and stages.  Tie-backs are short dikes connecting the LPSTP to the bank at regular intervals. Tie-backs are usually the same height as the LPSTP or elevated slightly toward the bank end, and are keyed into the bank. If tie-backs are long they should be angled upstream to act as Bendway Weirs.

Longitudinal Peaked Stone Toe Protection (LPSTP) As-built After a high flow event stream has scoured at the toe & some LPSTP stone has self-adjusted (armored the scour hole)

Locked Logs are then “locked” under the Longitudinal Peaked Stone Toe Protection (LPSTP). ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Road

Looking US. LPSTP crest is 4 ft above base flow stage CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Tree or shrub poles (called Live Siltation) installed on top of LPSTP Willow, dogwood, river birch poles can then be laid on the stone and up against the bank. Basal ends should be in vadose zone (capillary zone). Willow only used on this project. Live poles laid against eroded bank Road

Looking US. Class laying willow poles against eroding bank. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) Backfill material from point bar forms a floodplain bench at the Q-2 flood elevation Road

Looking DS. Backfilling between LPSTP & bank to form floodplain the Q-2 elevation. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

Looking US. Installing Living Dikes perpendicular to high flow, Live Siltation & Live Poles are parallel with the stream. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP) At intervals, install willow Living Dikes (densely deep-planted adventitious poles aligned perpendicular to direction of high flow)

A Living Dike (perpendicular to high flow) on the floodplain bench. CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK

Floodplain bench planted on a grid pattern Flow AERIAL VIEW OF ENHANCED LPSTP WITH A FLOODPLAIN BENCH WITH VEGETATION PLANTED ON A GRID PATTERN. Living Dikes- plants perpendicular to flow Live Siltation Live Poles Single-Stone Bendway Weir

PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009

4 MONTHS AFTER PROJECT COMPLETION Looking US to DS Photos by LaDon Atkinson JULY 11, 2009

4 MONTHS LATER-Looking the project bend. 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking floodplain bench 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking the thalweg trace, LPSTP, Bendway Weirs & the floodplain bench. Great growth! 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

After 4 months, great growth from the 500 willows we planted! LaDon says the floodplain bench has about 6 inches of sediment deposition on it (eroding bank turned into a depositional feature).

4 MONTHS AFTER PROJECT COMPLETION Looking DS to US Photos by LaDon Atkinson JULY 11, 2009

4 MONTHS LATER-Looking SSBW, LPSTP & Live Siltation 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking project & road 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

4 MONTHS LATER-Looking a Living Dike on the floodplain bench 4 MONTHS LATER - HAW CREEK–From LaDon Atkinson

Haw Creek Project (5 inch rain 48 hours prior to photos) September 20, 2010 Two Growing Seasons After Completion Photos By Rob Gramke, Regulatory, St. Louis District, U.S. Army Corps of Engineers

Looking upstream from the downstream end of the project Sep 2010-notice how wide the shoulder appears now March 2009-bank 4 feet from road

Looking downstream March 2009 September 2010

Looking downstream from left descending bank. The vegetation has almost completely grown over the rock – Sept 2010

Rock toe & short Bendway Weirs

Locked log still in place

This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal , or Enjoy the information!!