McGraw-Hill-Ryerson ©2011 The McGraw-Hill Companies, All Rights Reserved CHAPTER 10 Developing Information Systems Opening Case: Canadian Youth Design.

Slides:



Advertisements
Similar presentations
SYSTEMS DEVELOPMENT AND PROJECT MANAGEMENT Corporate Responsibility
Advertisements

Outsourcing in the 21st Century
Business Driven Technology Unit 5 Transforming Organizations Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
THE SYSTEMS DEVELOPMENT LIFE CYCLE (SDLC)
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved BUSINESS DRIVEN TECHNOLOGY Chapter Nineteen: Building Software to Support.
BUSINESS DRIVEN TECHNOLOGY
Transforming Organizations
COMPONENT-BASED DEVELOPMENT
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques
6-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 6 Systems Development.
PROJECT MANAGEMENT AND OUTSOURCING
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
DEVELOPING ENTERPRISE APPLICATIONS
Unit Five – Transforming Organizations
Fundamentals of Information Systems, Second Edition
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 12 PROJECT MANAGEMENT AND OUTSOURCING.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 11 SYSTEMS DEVELOPMENT.
Chapter 6 Systems Development: Phases, Tools, and Techniques
CHAPTER 9: LEARNING OUTCOMES
CHAPTER 17 Building Software to Support an Agile Organization
CHAPTER 11 SYSTEMS DEVELOPMENT.
CHAPTER 19 Building Software.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
CHAPTER 11 SYSTEMS DEVELOPMENT AND PROJECT MANAGEMENT Modified by Prof. V. Yen.
CHAPTER ELEVEN OVERVIEW
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
SYSTEMS DEVELOPMENT AND PROJECT MANAGEMENT: CORPORATE RESPONSIBILITY
1.1 © 2007 by Prentice Hall 11 Chapter Building Information Systems.
Transforming Organizations
CHAPTER OVERVIEW SECTION 9.1 – Developing Enterprise Applications
Business Driven Technology Unit 5 Transforming Organizations McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.
Appendix D McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 11 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
11.1 © 2007 by Prentice Hall 11 Chapter Building Information Systems.
BUSINESS PLUG-IN B15 Project Management.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
6-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 6 Systems Development.
Information Systems Development
Systems Development and
Business Driven Technology Unit 5 Transforming Organizations Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Business Driven Information Systems 2e CHAPTER 11 SYSTEMS DEVELOPMENT AND PROJECT.
Outsourcing. Outsourcing – an arrangement by which one organization provides a service or services for another organization that chooses not to perform.
Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER NINE SYSTEMS DEVELOPMENT AND PROJECT MANAGEMENT CHAPTER.
Business Driven Technology Unit 5 Transforming Organizations Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Outsourcing in the 21st Century CHAPTER 19 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Business Plug-In B15 Project Management.
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
11 ADM2372 Management Information Systems (MIS) Chapter 10 – Part I Systems Development Chapter 10 – Part I Systems Development.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Business Driven Information Systems 2e CHAPTER 11 SYSTEMS DEVELOPMENT AND PROJECT.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
CHAPTER 9: LEARNING OUTCOMES
Strategic Outsourcing (on OLC)
BUSINESS PLUG-IN B15 Project Management.
BUSINESS DRIVEN TECHNOLOGY
The Project Infrastructure
Building Information Systems
Fundamentals of Information Systems, Sixth Edition
CHAPTER OVERVIEW SECTION 9.1 – Developing Enterprise Applications
Systems Analysis and Design in a Changing World, 4th Edition
Transforming Organizations
Strategic Outsourcing
Methodologies For Systems Analysis.
SDLC The systems development life cycle is the foundation for many systems development methodologies such as RAD and agile Systems development life cycle.
Project Management Process Groups
Presentation transcript:

McGraw-Hill-Ryerson ©2011 The McGraw-Hill Companies, All Rights Reserved CHAPTER 10 Developing Information Systems Opening Case: Canadian Youth Design Their Own Youth Portal Opening Case: Canadian Youth Design Their Own Youth Portal

10-2 Copyright © 2011 McGraw-Hill Ryerson Limited Chapter Ten Overview SECTION 10.1 – SYSTEMS DEVELOPMENT –Information Systems Development –Global Information Systems Development –The Systems Development Lifecycle (SDLC) –Software Development Methodologies –Developing Successful Systems SECTION 10.2 – PROJECT MANAGEMENT –Managing Software Development Projects –Project Management Fundamentals –Understanding Project Planning –Managing Projects –Outsourcing Projects

10-3 Copyright © 2011 McGraw-Hill Ryerson Limited LEARNING OUTCOMES 1.Identify the business benefits associated with successful software development and how the issues and challenges developing domestic information systems amplify with global systems development. 2.Describe and understand the relationships between each of the seven phases of the systems development life cycle. 3.Summarize and compare different software development methodologies.

10-4 Copyright © 2011 McGraw-Hill Ryerson Limited LEARNING OUTCOMES 4.Realize the importance of good project management practice. 5.Describe the benefits and challenges of outsourcing systems development projects.

McGraw-Hill-Ryerson ©2011 The McGraw-Hill Companies, All Rights Reserved SECTION 10.1 SYSTEMS DEVELOPMENT

10-6 Copyright © 2011 McGraw-Hill Ryerson Limited DEVLOPING INFORMATION SYSTEMS Information systems that are built correctly can transform as the organization and its business transform Information systems that effectively meet employee needs will help an organization become more productive and enhance decision making Information systems that do not meet employee needs may have a damaging effect on productivity and can even cause a business to fail

10-7 Copyright © 2011 McGraw-Hill Ryerson Limited DEVELOPING SOFTWARE As organizations’ reliance on information systems grows, so do the business- related consequences of software successes and failures including: –Increase or decrease revenue –Repair or damage to brand reputation –Prevent or incur liabilities –Increase or decrease productivity

10-8 Copyright © 2011 McGraw-Hill Ryerson Limited SYSTEM DEVELOPMENT LIFE- CYCLE (SDLC) Systems development lifecycle – the overall process for developing information systems from planning and analysis through implementation and maintenance

10-9 Copyright © 2011 McGraw-Hill Ryerson Limited SYSTEM DEVELOPMENT LIFE- CYCLE (SDLC)

10-10 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 1: PLANNING Planning phase – involves establishing a high-level plan of the intended project and determining project goals

10-11 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 2: ANALYSIS Analysis phase – involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system

10-12 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 3: DESIGN Design phase – involves describing the desired features and operations of the system including screen layouts, business rules, process diagrams, pseudo code, and other documentation

10-13 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 4: DEVELOPMENT Development phase – involves taking all of the detailed design documents from the design phase and transforming them into the actual system

10-14 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 5: TESTING Testing phase – involves bringing all the project pieces together into a special testing environment to test for errors, bugs, and interoperability, in order to verify that the system meets all the business requirements defined in the analysis phase

10-15 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 6: IMPLEMENTATION Implementation phase – involves placing the system into production so users can begin to perform actual business operations with the system

10-16 Copyright © 2011 McGraw-Hill Ryerson Limited PHASE 7: MAINTENANCE Maintenance phase – involves performing changes, corrections, additions, and upgrades to ensure the system continues to meet the business goals

10-17 Copyright © 2011 McGraw-Hill Ryerson Limited SYSTEM DEVELOPMENT METHODOLOGIES A methodology is a set of policies, procedures, standards, processes, practices, tools, techniques and tasks that people apply to technical and management challenges.

10-18 Copyright © 2011 McGraw-Hill Ryerson Limited SYSTEM DEVELOPMENT METHODOLOGIES There are a number of different software development methodologies including: –Waterfall –Agile Rapid application development (RAD) Extreme programming methodology Rational unified process (RUP) methodology Scrum methodology –Participatory design methodology

10-19 Copyright © 2011 McGraw-Hill Ryerson Limited Waterfall Methodology Waterfall methodology – a sequential, activity- based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance

10-20 Copyright © 2011 McGraw-Hill Ryerson Limited Waterfall Methodology

10-21 Copyright © 2011 McGraw-Hill Ryerson Limited Agile Software Development Methodologies Iterative development – consists of a series of tiny projects

10-22 Copyright © 2011 McGraw-Hill Ryerson Limited Rapid Application Development Methodology (RAD) Rapid application development methodology (RAD) – emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process The prototype is an essential part of the analysis phase when using a RAD methodology –Prototype – a smaller-scale representation or working model of the users’ requirements or a proposed design for an information system

10-23 Copyright © 2011 McGraw-Hill Ryerson Limited Rapid Application Development Methodology (RAD)

10-24 Copyright © 2011 McGraw-Hill Ryerson Limited Participatory Design Participatory design (PD) methodology promotes the active involvement of users in the information systems development process The people destined to use the system play a critical role in designing it PD Basic Tenets: –The design process makes a difference for participants –Implementation of the results from the design process is likely –It is fun to participate

10-25 Copyright © 2011 McGraw-Hill Ryerson Limited Participatory Design Participatory Design recommendations: –Create opportunities for mutual learning –Utilize design tools familiar to users –Use language familiar to users –Start the design with current practice –Encourage users to envision future situations of working with the final system

10-26 Copyright © 2011 McGraw-Hill Ryerson Limited DEVELOPING SUCCESSFUL SOFTWARE Primary principles for successful agile software development include: –Slash the budget –If it doesn’t work, kill it –Keep requirements to a minimum –Test and deliver frequently –Assign non-IT executives to software projects

10-27 Copyright © 2011 McGraw-Hill Ryerson Limited OPENING CASE QUESTIONS Canadian Youth Design Their Own Youth Portal 1.What challenges did the Youth Portal avoid by being a nation-wide project as opposed to a global systems development one? 2.If the Youth Portal is any indication, which of the seven phases of the SDLC is most important to the Government of Canada? The least important? 3.In what ways did the development and design of Youth.gc.ca follow participatory design principles? 4.What challenges do you think an organization would face if it followed a PD approach to information systems design? 5.The Youth.gc.ca example illustrated the various steps and energy taken to ensure that a wide and representative set of end-users were involved in the design process. Should the same philosophy be followed by all organizations in general? Why or why not?

McGraw-Hill-Ryerson ©2011 The McGraw-Hill Companies, All Rights Reserved SECTION 10.2 PROJECT MANAGEMENT

10-29 Copyright © 2011 McGraw-Hill Ryerson Limited MANAGING SOFTWARE DEVELOPMENT PROJECTS Project management interdependent variables

10-30 Copyright © 2011 McGraw-Hill Ryerson Limited PROJECT MANAGEMENT Common reasons why IT projects fall behind schedule or fail

10-31 Copyright © 2011 McGraw-Hill Ryerson Limited PROJECT MANAGEMENT FUNDAMENTALS Project – a temporary endeavor undertaken to create a unique product or service Project management – the application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations

10-32 Copyright © 2011 McGraw-Hill Ryerson Limited PROJECT MANAGEMENT FUNDAMENTALS Project deliverable – any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project Project milestone – represents key dates when a certain group of activities must be performed Project manager – an individual who is an expert in project planning and management, defines and develops the project plan, and tracks the plan to ensure all key project milestones are completed on time

10-33 Copyright © 2011 McGraw-Hill Ryerson Limited PROJECT MANAGEMENT FUNDAMENTALS Project management role

10-34 Copyright © 2011 McGraw-Hill Ryerson Limited CHOOSING STRATEGIC PROJECTS Organizations must determine which projects to pursue Three common techniques for selecting projects 1.Focus on organizational goals 2.Categorize projects 3.Perform a financial analysis

10-35 Copyright © 2011 McGraw-Hill Ryerson Limited Project Charter Project charter – is a document issued by the project initiator or sponsor that formally authorizes the existence of a project and typically includes: –Project scope –Project objectives –Project constraints –Project assumptions

10-36 Copyright © 2011 McGraw-Hill Ryerson Limited Setting The Project Scope SMART criteria are useful reminders on how to ensure that the project has created understandable and measurable objectives Project scope – defines the work that must be completed to deliver a product with the specified features and functions, and typically includes:

10-37 Copyright © 2011 McGraw-Hill Ryerson Limited Project Plan Project plan – a formal, approved document that manages and controls project execution A well-defined project plan should be: –Easy to understand and read –Communicated to all key participants –Appropriate to the project’s size, complexity, and criticality –Prepared by the team, rather than by the individual project manager

10-38 Copyright © 2011 McGraw-Hill Ryerson Limited Project Plan Two primary diagrams used in project planning include PERT and Gantt charts –PERT (Program Evaluation and Review Technique) chart – is a graphical network model that depicts a project’s tasks and the relationships between those tasks (Dependencies and Critical paths are found in PERT charts) –Gantt chart – a simple bar chart that depicts project tasks against a calendar

10-39 Copyright © 2011 McGraw-Hill Ryerson Limited Project Plan PERT Chart EXPERT – PERT Chart Example

10-40 Copyright © 2011 McGraw-Hill Ryerson Limited Project Plan MS Project – Gantt Chart Example

10-41 Copyright © 2011 McGraw-Hill Ryerson Limited MANAGING PROJECTS A project manager must focus on managing three primary areas to ensure success: 1.People 2.Communications 3.Change

10-42 Copyright © 2011 McGraw-Hill Ryerson Limited OUTSOURCING Insourcing (in-house-development) – a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems Outsourcing - is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.

10-43 Copyright © 2011 McGraw-Hill Ryerson Limited OUTSOURCING

10-44 Copyright © 2011 McGraw-Hill Ryerson Limited OUTSOURCING Reasons companies outsource

10-45 Copyright © 2011 McGraw-Hill Ryerson Limited OUTSOURCING Factors driving outsourcing growth include: –Core competencies –Financial savings –Rapid growth –Industry changes –The Internet –Globalization

10-46 Copyright © 2011 McGraw-Hill Ryerson Limited OUTSOURCING Outsourcing opportunities:

10-47 Copyright © 2011 McGraw-Hill Ryerson Limited Outsourcing Benefits Outsourcing benefits include: –Increased quality and efficiency –Reduced operating expenses –Focusing on core profit-generating competencies –Reduced exposure to risk –Service providers economies of scale, expertise, and best practices –Access to advanced technologies –Increased flexibility –Avoid costly outlay of capital funds –Reduced headcount and associated overhead expense –Reduced frustrations and expense related to hiring/retaining employees –Reduced time to market for products or services

10-48 Copyright © 2011 McGraw-Hill Ryerson Limited OUTSOURCING OPTIONS Onshore outsourcing – engaging another company within the same country for services Nearshore outsourcing – contracting an outsourcing arrangement with a company in a nearby country Offshore outsourcing – using organizations from developing countries to write code and develop systems

10-49 Copyright © 2011 McGraw-Hill Ryerson Limited THE CHALLENGES OF OUTSOURCING Outsourcing challenges include –Contract length 1.Difficulties in getting out of a contract 2.Problems in foreseeing future needs 3.Problems in reforming an internal IS department after the contract is finished –Competitive edge –Confidentiality –Scope definition

10-50 Copyright © 2011 McGraw-Hill Ryerson Limited OPENING CASE QUESTIONS Canadian Youth Design Their Own Youth Portal 6.To what extent could PD design projects, like Youth.gc.ca, benefit from project management principles and techniques? To what extent could all software development methodologies benefit from project management principles and techniques? 7.Would project planning be necessary in a PD design project like Youth.gc.ca? why or why not? 8.To what extent would PD projects, like Youth.gc.ca benefit from a change management system? Would a change management system be more beneficial to a different type of systems design methodology? Explain. 9.To what extent would outsourcing be useful of appropriate in PD design projects like Youth.gc.ca? Would outsourcing be more suitable to another systems development methodology? If so, which one(s)?

10-51 Copyright © 2011 McGraw-Hill Ryerson Limited CLOSING CASE ONE HP’s Software Problems 1.Which one of the seven phases of the systems development life cycle is least important to HP? The most important? Why? 2.Which of the different software development methodologies should HP use to implement successful systems? Why? 3.Identify the primary reasons for systems project failure and explain which ones HP experienced on its ERP build. 4.Review the buy versus build decision and explain why HP chose to buy its ERP system. 5.Review the project charter and explain how HP could benefit by using one. 6.Review the three outsourcing options and identify the pros and cons HP should consider if it chooses to outsource its system development effort.

10-52 Copyright © 2011 McGraw-Hill Ryerson Limited CLOSING CASE TWO Reducing Ambiguity in Business Requirements 1.Why are ambiguous business requirements the leading cause of systems development failures? 2.Why do the words and and or tend to lead to ambiguous requirements? 3.Research the Web and determine other reasons for “bad” business requirements. 4.What is wrong with the following business requirement: “The system must support employee birthdays since every employee always has a birthday every year”?

10-53 Copyright © 2011 McGraw-Hill Ryerson Limited CLOSING CASE THREE Staying on Track – Toronto Transit 1.How is project management software being used by the TTC for better project management? 2.Describe Gantt charts and explain how the TTC could use one to communicate project status. 3.Describe PERT charts and explain how the TTC could use one to communicate project status. 4.Using this case study of the TTC as a guide, under what circumstances should organizations utilize project management software to help manage projects?