Jarvis plc 2007 Half Year Results Presentation 27 November 2007.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Financial Statements Audited Performance in Q Better Than Expected Completion of Flexpol Disposal Warsaw, April 2004.
Earning Release 3Q, 2001 Samsung Electronics October 22, 2001.
Analysis of Financial Statements
Property Tax Relief and Reform: Plan Overview Joint Select Committee on Property Tax Relief and Reform June 11, 2007.
Review of the Accounting Process
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
STATEMENT OF CASH FLOWS
© 2007 The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin The Statement of Cash Flows Revisited 21.
Chapter 19 Financing and Valuation Principles of Corporate Finance
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Jarvis plc Financial Results July Strategic Highlights Richard Entwistle to retire at September AGM succeeded by Stuart Laird currently Chief.
Jarvis plc Interim Results 26 November Strategic Highlights Continued focus on Rail, Plant and Freight Difficult trading conditions in first half.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
Impact of financial and debt crisis on local and regional authorities. Frank Lierman, Chief Economist Belfius Bank ECOS, Committee of the Regions Brussels,
CALENDAR.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
NPV.
The fiscal budget proposal for 2005 October 1st 2004.
2002 Results 17 March © 2003 Management Consulting Group PLC All rights reserved 2002 Final Results.ppt 2 Agenda Introduction 2002 highlights Profit.
Break Time Remaining 10:00.
Presentation by John Comrie National Local Government Asset Management and Public Works Engineering Conference 13 May 2010.
PULSE SURVEY The Incentive Industry Trends 2011 June 2011.
CHAPTER 5 ESSENTIALS OF FINANCIAL STATEMENT ANALYSIS.
Introduction to Cost Behavior and Cost-Volume Relationships
Income Measurement and Profitablity Analysis
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
PP Test Review Sections 6-1 to 6-6
6 th International Venture Capital Forum Athens 14 th -15 th June 2005 Private Equity in Europe -Fund Raising and Trends.
February 16, 2011 Fourth Quarter Results. 2 02/16/2011 Forward Looking Statements This conference call may contain certain "forward-looking statements"
Does Debt Policy Matter?
Inventories: Additional Issues
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Capital Budgeting Cash Flow
Reporting and Interpreting Cost of Goods Sold and Inventory
VOORBLAD.
FI3300 Corporation Finance Spring Semester 2010 Dr. Isabel Tkatch Assistant Professor of Finance 1.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1 DELAYED LAST STATE AID - BORROWING PROCESS
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Chapter 7 Review Economics.
1..
Measuring Business Profit: The Adjusting Process Chapter 3 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 Impact Assessment. 2 Demographics 3 Sex and Age.
Planning for Profit and Cost Control
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
12 Financial Management 12-1 Financial Planning
Reporting and Analyzing Cash Flows
Essential Cell Biology
Copyright © 2007 Prentice-Hall. All rights reserved 1 Long-Term Liabilities Chapter 15.
Slide 15.1 Pauline Weetman, Financial and Management Accounting, 5 th edition © Pearson Education 2011 Chapter 15 Reporting cash flows.
PSSA Preparation.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, Inc. All rights reserved. 16 Partnerships: Liquidation.
Preliminary Results 26 May Ian Much Chief Executive.
Quarterly Performance Report For the period October – December 2014.
Full Year Presentation 8 August This presentation relates to the Freightways Limited NZX announcement and media release of 8 August As such.
Presentation transcript:

Jarvis plc 2007 Half Year Results Presentation 27 November 2007

2 Group Financial Highlights 2007 £m 2006 £m Revenue* (Loss)/Profit before tax* Loss for the period Net cash used in operating activities Net debt Loss per share * Continuing operations (0.6) 0.5 (2.5) (11.6) (19.1) (25.6) (41.4) (45.8) (1.2)p (7.5)p

3 First Half Financial Performance –Loss before tax in first half ahead of management budget expectations –Underperformance in Plant offset by additional volume and margin in Rail, and additional central costs and interest savings, compared to budget –Net debt at 30 September circa £5m higher than budget, mostly due to earlier than anticipated settlement of historic provisions

4 Group Segmental Analysis - Revenue 2007 £m 2006 £m Rail % Plant % Accommodation Services % Eliminations (14.2) (16.6) Total %

5 Revenue Analysis - Rail 2007 £m 2006 £m Track Renewals Enhancement Projects Electrical Projects Other/eliminations (4.3) (6.2) Total Increased enhancement project volumes in second quarter driven by Rugby Remodelling contract - Electrical project volumes down due to delay in awards of Category C signalling contracts

6 Revenue Analysis - Plant 2007 £m 2006 £m On Track Machines Specialist Plant Small Plant Transport Total Reduced volumes on heavy duty machines in OTM - Small plant reduced external sales matched by lower costs - Transport turnover reduced following expiry of back to back lease contracts with major client

7 Revenue Analysis – Accommodation Services 2007 £m 2006 £m Facilities Management Construction Total

8 Group Segmental Profit Analysis* 2007 £m 2006 £m Rail Plant Accommodation Services (1.4) 1.0 Central costs (5.9) (10.6) Operating profit Net finance costs (Loss)/Profit before tax (0.9) (0.6) (1.8) 0.5 * Before exceptional items

9 Shareholders equity 30 Sept 07 £m 2 April 07 £m Share capital 10.2 Share premium Special reserve3.7 - Capital redemption reserve7.2 Other reserve89.7 Accumulated losses (188.2) (702.8) Equity shareholders deficit (16.7) (14.3)

10 Net Debt 30 Sept 07 £m 2 April 07 £m Cash Borrowings due within one year (14.2) (18.3) Borrowings due after one year (32.1) (32.9) Total (41.4) (23.6)

11 Working Capital Facility –Asset backed facility secured on plant and receivables –Maximum loan originally £67m –Current maximum loan, after amortisation and repayments following disposals, is £63.9m –Further amortisation in equal instalments to June 2008 of £2.1m –Loan also subject to reduction on any future asset disposals –Facility expires July 2009 –Blended average interest rate approximately 11% –Rolling 12 month EBITDA financial covenant (absolute amount). No breaches anticipated

12 Movement in Net Debt + £m Net Debt 2 April 2007 (23.6) Underlying EBITDA (2.4) Working capital movements(7.4) Legacy provision settlements (4.2) Redundancy payments (1.8) Capital expenditure (1.1) Interest costs (2.8) Proceeds from business disposals 1.9 Net Debt at 30 September 2007(41.4) + Un-audited extract from group management accounts

13 Rail –Selected by Network Rail as one of their 4 preferred suppliers for track renewals –Workload has picked up during the second quarter as expected and volumes in the second half are secure –Reduced revenue in signalling business as the Category C workload has not come through as anticipated –Completed 200 yards of track in 8 hours at Heaton Sidings proving that we can achieve 7 Day Railway targets

14 Plant –Utilisation pattern for On Track Machines causing difficulty –Limited visibility and mix of plant demand on new rail work –Small plant revenues impacted by 6-4 competition, but costs reduced in line –Transport – reduced volumes following major contact expiry –Specialist plant has performed ahead of expectation –Continue to develop and invest in new products

15 Accommodation Services – Terminated 3 significant loss making contracts in October (plus 1 profitable contract for geographical reasons) – a very significant achievement – Business has stabilised, but one remaining poorly performing contract that we need to resolve – Remaining construction defects have been agreed with clients and provided for

16 Summary – Business is recovering not recovered – Success in the 6-4 competition – major achievement – Termination of the loss making facilities management contracts – a major step forward – Rail revenues look strong – Plant revenues visibility and mix an issue – Government/Network Rail forecasting substantial future enhancement programme – Overhead reduction progressing well