A QUARIUM H ILTON G ARDEN I NN. CRITICAL ISSUE RESEARCH For this I would like to take the BIM model Holder Construction Company has developed for the.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

Putting Houses on the Path to Lower Energy Consumption. Awareness and Long term planning helps to maximize energy opportunities.
BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING.
Lecture 2 Team Coordination 1 ICS 126 Team Coordination Team Formation and Organization Group Management Meeting Techniques Large software systems require.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
ASM & COAA Adding Value to Alberta Energy Sector projects.
Alistair Wells Glen Hutchinson
Skyscraper Construction
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
No Silver Bullet - Essence and Accident in Software Engineering By: R. Adam Mead.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
New Construction Technology. GPS Can do all earthwork using GPS attached to bulldozer blades, excavators, scrapers, etc – Cost: GPS equipment including.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
Capital One Lecture Hall Sean C. Ehlers – Construction Management Capital One Lecture Hall McLean, VA Sean C. Ehlers Construction Management Advisor: Dr.
Operational Continuity. The Concrete Joint Sustainability Initiative is a multi-association effort of the Concrete Industry supply chain to take unified.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Elastic Potential Energy: More Practice. Conservation of Mechanical Energy: Learning Goal The student will investigate a simple energy transformation,
Introduction to BIM BIM Curriculum 01.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Construction Project Management: Technology driven answers for schedule and budget savings.
Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Senior Thesis 2007 Construction Management Option.
Northside Residence Hall Texas A&M University College Station, Texas Project No Proposal For CMAR Services for.
REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER 1 When to Select a Subcontractor in the Design Build Process Moderator:Ted Laszlo,
Project Management From Planning to Action A matter of communication.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
AE Senior Thesis 2007 Bloomindales Department Store Chevy Chase, MD.
WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
DEREK BAUER CONSTRUCTION MANAGEMENT AE SENIOR THESIS 2008 PENN STATE UNIVERSITY AE SENIOR THESIS PRESENTATION APRIL 15, 2008 OFFICE/RETAIL BUILDING WASHINGTON,
Title Your Name University Name Date Instructor Name.
Earth Science Intro Unit
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
To reduce negative environmental impacts. To move towards more natural habitats. To reduce operating costs. To enhance building marketability. To improve.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Operational Continuity Joint Sustainability Initiative.
Proactive leak detection (using infra red techniques)
Overview of Building Information Modeling What does it mean for Civil Engineering?
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Second Nature ® Compact Chiller Leading the way in secondary coolant refrigeration systems. SNCC.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
ATHENS CHAMBER OF COMMERCE AND INDUSTRY Activities in the field of Environmental Protection.
Презентацию подготовила Хайруллина Ч.А. Муслюмовская гимназия Подготовка к части С ЕГЭ.
AutoCAD Unit Notes Understanding BIM, and Rapid Prototyping The purpose of Building Information Modeling (BIM) is to provide insight for creating and managing.
Design – BIM – Build – Operate
Conservation of Mechanical Energy: Learning Goal
BIM EXECUTION PLANNING PROCESS
Beck Technology Innovation in all Dimensions.
Relevant Costs and Benefits
Reduce Distribution System Pressure
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Light Gauge Steel Frame
BIM EXECUTION PLANNING PROCESS
Progress Report 11/10/11.
AMBRIDGE AREA HIGH SCHOOL
Wellington Condominiums Project
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Monte Carlo vs. PERT Tutorial
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Productivity 5/6/2019 Technology Industries of Finland.
Analyze Word of the Week.
PRECAST CONCRETE PRODUCTION FOR THE FUTURE
Presentation transcript:

A QUARIUM H ILTON G ARDEN I NN

CRITICAL ISSUE RESEARCH For this I would like to take the BIM model Holder Construction Company has developed for the Aquarium Hilton Garden Inn project and use to further communicate the benefits of BIM to the industry. With the model I would be able to show the different uses of the model and get real world. The main tasks I would like to do include: Showing a comparison of takeoffs between a BIM and traditional plans and the time associated with each. Show how it can be used by a Superintendent to communicate with the subcontractors in meetings. Save time in the construction process by using collision detection catching collisions early to keep delays from happening.

A QUARIUM H ILTON G ARDEN I NN ANALYSIS 1: Façade Investigation The goal of this analysis is to find the best way to manage the many different types of facades on the building to help avoid leaks at the joints. This may involve having less variations of façade types in the building or just fining alternate types to help the building seal better. The alternate systems found should perform as well or even better mechanically to help with heat loss in the building. By changing the façade system I hope to be able to add value to the building through value engineering, schedule reduction, constructability issues as well as make the building more energy friendly.

A QUARIUM H ILTON G ARDEN I NN ANALYSIS 2: Excavation/Foundation Investigation The goal of this analysis is to help get the building up out of the ground faster. I will do this by analyzing the excavation schedule/design, the excavation support system and the type of foundation used to support the building. I hope to find alternative means for these areas to help the building get out of the ground faster helping to expedite the construction schedule.

A QUARIUM H ILTON G ARDEN I NN ANALYSIS 3: Structural System Analysis The goal of this analysis is to speed up the schedule through the use of precast structural members as oppose to the all cast in place structure. Through the use of precast members the structure can be erected faster allowing construction to move on to the façade and interiors work faster. The cost added for these precast members would then be compared to the profit the owner earns by being able to open the hotel sooner.