JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.

Slides:



Advertisements
Similar presentations
Office of Civil Rights Business Development Program Overview Metro State Aid Training 3/2/11.
Advertisements

JOB ORDER CONTRACTING Contract Management Department 8/28/121.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Contract CloseOut.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
A PROJECT MANAGEMENT OVERVIEW Maritime Place PMI EMERALD COAST FLORIDA CHAPTER JANUARY 21, 2014.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
SURETY BONDS Managing the Risk of Contractor Default.
Job Order Contracting Presented by the Center for Job Order Contracting Excellence.
Initiating Partnering Opportunities for Small Business.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Job Order Contracting ( JOC) Chicago Department of Aviation Capital Improvement Program Panel member: Joseph S. Dote, Sr. Vice President R.M. Chin & Associates,
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
General Services Administration Doing Business with GSA and the Mentor Protégé Program.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
1 GOAL STATEMENT Improve the contributions of certified minority, women, and socially and economically disadvantaged small businesses to the Washington.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Copyright © 2007 The Gordian Group, Inc., all rights reserved Page 1 Job Order Contracting A State of the Art Procurement Tool Charles Crane Mike Shiplet.
Doing Business with Department of Enterprise Services for General Contractors and Subcontractors June 19, 2013.
Have you silenced your cell phone? 1 2 Job Order Contract Informational Meeting Presented By: City of Bellevue and The Gordian Group April 15, 2010 City.
U.S. Small Business Administration
Job Order Contracting A Washington State Procurement Option
Construction Category Management Planning Version 1.1 (May 2015)
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
DLA-Energy Recurring Maintenance & Minor Repair Program 10 December 2010 US Army Corps Of Engineers Maintenance andDLA-E Repair Program.
June 20, 2012 Outsourcing Physical Plant Should I ???
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
Surety Bonds Managing the Risk of Contractor Default.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
AMP Business Advisory Board - Business to Business Mentoring Program 1 Affirmative Market Program & AMP Business Advisory Board Stakeholder Engagement:
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
Washington Suburban Sanitary Commission Small, Local and Minority Business Enterprise (SLMBE) Program.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
ITS Maintenance Experience in Michigan Gregory D. Krueger, P.E. Metro Region Traffic and Safety Engineer Michigan Department of Transportation.
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
Business Inclusion and Development Program Overview Business Development and Procurement Services Budget, Finance and Audit Committee Monday October 5,
Contractor Alternate Design Serving the Public’s Best Interest.
You passed the Bond or secured some funds What do we do now? 2014.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
WELCOME! SBE Boot Camp JOB ORDER CONTRACTING (JOC) CHRISTY GUZMAN JOC Program GAYANE STEPANYAN JOC Program September 30,
Efficient Renovation, Repair, & Minor New Construction Job Order Contracting Best Management Practices.
Job Order Contracting 2016 & Beyond! Best Management Practices Moderator: Peter Cholakis, CJE Board Member Presenters: Charlie Bowers, LEED AP - National.
Efficient Renovation, Repair, and Minor New Construction LEAN - Job Order Contracting Best Management Practices Moderator: Peter Cholakis, CJE Board Member.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
JOB ORDER CONTRACTING FUNDAMENTALS
2016 SAME Small Business Conference - Atlanta
Subtitle Statement of Capabilities.
NOME Leadership Summit Chief Procurement Officer
Delta Water Supply Project
VETS 2 Advantages for Federal Agencies
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
Presentation transcript:

JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project General Manager

2 Who is Centennial Experience Resources and Capabilities Focus on Serving as an Extension of Your Team JOC specialists with more than 30 years of experience nationally More than 15 years of JOC experience in Washington State Current Washington State Public JOC contracts held by Centennial: Sound Transit, King County DNRP, King County FMD, WSU, Spokane Public Schools, and City of Bellevue Ready to adapt to meet evolving needs and provide tailored solutions Office locations: Seattle, Fife, JBLM, and Spokane JOC processes and procedures customized to client’s needs Partnering to meet your needs and ease the burden on your staff

3 What is JOC? How is it different? IDIQ Contract Indefinite delivery indefinite quantity JOC is regulated by Washington State RCW $4,000,000/year for 2 years + 1 option year $350,000 max per delivery order Unit price book establishes price for projects (Examples: RSMeans, Gordian, etc.) Agreed line item proposal becomes a lump sum price Relationship Overall contract is performance based Open communication Transparency and trust Pricing

4 What is JOC? How is it different? JOC contractor must subcontract at least 90% of the direct construction work Subcontractors price work normally to JOC contractor Payment to subcontractors are expedited (prompt pay) Goals for small business = 20% of contract amount JOC contractor breaks down scope for subcontractors to bid their specialty Less red tape for subcontractors Mentoring of subcontractors Prevailing wage Subcontractor Participation

5 Role of the General Contractor Works with agency to identify the scope (Joint Scoping) Value Engineering / Constructability Reviews Identify Risks to mitigate for all parties involved Permitting requirements Safety planning Onsite representation Routine inspection Subcontractor management Schedule adherence Safety inspections daily Quality and Safety Scope Development

6 General Contractor Benefits Benefits of JOC Owner Benefits Subcontractor Benefits Subcontractor participation = Diversity Reduce staff requirements from agency = time saving Risk mitigation = less risk for small projects Time saving = project are started and completed much faster Subcontractor participation = Diversity Performance results in more projects Risk mitigation = less risk for small projects Time saving = project are started and completed much faster Prompt pay = ability to build relationships with vendor/suppliers Bonding is waived for most bid packages Best value selection = JOC contractor selects on best value not low bid Builds capacity for their business

7 How does a Subcontractor get involved? Signs up with the JOC contractor (prequalify) OMWBE, King County SCS, SBA certifications Once signed up with the JOC contractor actively Attend outreach events, groups, and forums bid projects and solicit feedback and most importantly be proactive!

8 Types of work typically included in JOC Aquarium Concrete Ramp Replacement, City of Seattle Justice Center Lighting Controls, City of Seattle North Precinct Fueling Station Rebuild, City of Seattle YSC Security Turnstiles, King County Beacon Hill Leak Repairs, Sound Transit Lakewood Station Sidewalk Repairs, Sound Transit

9 JOC = Results Sound Transit Facilities Maintenance and Operations JOC between 6/26/13 and 4/18/14 : Subcontractor Participation numbers: Current JOC Challenges: Subcontractor availability Different categories Different owner requirements $2.4 Million has been awarded to Centennial 35% Small Business 11% MBE 1% WBE

10 QUESTIONS AND RESPONSES