A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Giovanni Signorelli, INFN, Scuola Normale and Dipartimento di Fisica, Pisa PSI, February LXe (part B) Giovanni Signorelli Istituto Nazionale di.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
Xenon Detector Xenon Detector Group. 1 Contents Cryostat Construction Detector Preparation Schedule.
Yasuhiro NISHIMURA Hiroaki NATORI The University of Tokyo MEG collaboration Outline  → e  and MEG experiment Design of detector Calibration Performance.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Mar Toshiyuki Iwamoto (ICEPP) JPS 2010 Spring meeting, Okayama University1 MEG 実験による   e  探索 Run2009 東京大学素粒子物理国際研究センター 岩本敏幸 他 MEG コラボレーション.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
Peter-Raymond Kettle MEG Review February MEG Commissioning & Engineering Run 2007.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Analysis of PSI beam test R.Sawada 09/Feb/2004 MEG collaboration R.Sawada 09/Feb/2004 MEG collaboration
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
26 Jan, MEG Software Status Framework for MEG MC, Unification of LargePrototype/beam test, Schedule and DC reconstruction MEG Software Group.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
HD target.
MEG II 実験のための 陽電子タイミングカウンターの開発 PSI でのハイレートビーム試験 Development of Positron Timing Counter with SiPM for MEG-II Experiment Beam Test Result in the high rate.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
MEG 2009 現状と展望 東京大学素粒子物理国際研究センター 岩本敏幸 他 MEG コラボレーション 日本物理学会 2009 年秋季大会 甲南大学岡本キャンパス.
1 MEG 陽電子タイミングカウンタの ビーム中での性能評価と 解析方法の研究 * 内山雄祐 東大素粒子セ, INFN-Genova A, INFN-Pavia B 森俊則 F. Gatti. A,S.Dussoni A,G.Boca B,P.W.Cattaneo B, 他 MEG Collaboration.
MEG 実験用液体キセノン検出器の現状 東京大学素粒子物理国際研究センター 澤田龍 他 MEG カロリメータグループ 2007 年 9 月 24 日 日本物理学会 第 62 回年次大会 北海道大学.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator G. Signorelli Sezione di Pisa MEG Review meeting - 20 Feb On.
PSI - Jul. 18th, Status of the electronics and DAQ systems of the MEG experiment.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
MEG Run 2008 液体キセノンガンマ線検出器 東京大学 素粒子物理国際研究セン ター 西村 康宏、 他 MEG コラボレー ション 2008 年秋季物理学会@山形大学小白川キャンパス.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
Xenon Detector Installation schedule Satoshi MIHARA.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
R&D works on Liquid Xenon Photon Detector for μ  e γ experiment at PSI Satoshi Mihara ICEPP, Univ. of Tokyo Outline Introduction Prototype R&D works Summary.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
MEG 実験 2009 液体キセノン検出器の性能 II 西村康宏, 他 MEG コラボレーション 東京大学素粒子物理国際研究セン ター 第 65 回年次大会 岡山大学.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
Status of physics analysis Fabrizio Cei On Behalf of the Physics Analysis Group PSI BVR presentation, February 9, /02/2015Fabrizio Cei1.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
9 Feb, MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group.
g beam test of the Liquid Xe calorimeter for the MEG experiment
The interaction region for FIRST (status report)
The Beam Test at Fermilab:
Liquid Xenon Detector for the MEG Experiment
ScECAL+AHCAL+TCMT Combined Beam FNAL
Upgrade of LXe gamma-ray detector in MEG experiment
Upgrade of LXe gamma-ray detector in MEG experiment
MEG実験の液体Xe検出器について 東大 ICEPP  森研究室 M1 金子大輔.
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Trigger operation during 2007 run
New Results from the MEG Experiment
Presentation transcript:

A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter (F. Gatti) Electronics and DAQ (M. Grassi) Software (R. Sawada) Schedule

The shielding and grounding scheme was improved after the December run. There hasn’t been no unexpected shutdown since then. No shutdown for ~10 days with SC+NC+Bypass during shutdown period. No shutdown for ~10 days with SC + (BTS) after accelerator started to run. The problem by the external noise seems fixed. Quench Problem Status (W. Ootani) A new problem happened during CW accelerator testing. COBRA was unexpectedly shutdown after 40 hrs operation. Still under investigation, but it seems there was a problem with NC power supply according to the measured waveform.

Xenon detector (S. Mihara) Honeycomb panel test completed 3 rd panel delivered to Pisa at 16:30 on 20/Feb Mounted on the text box and tested on 22, 23/Feb –3 bar –Inspection by a Plyform expert –4 bar x4 times Hold for 3 minutes at 4 bar in the last test –Panel deformation (max) 0.3 mm at 1 bar 3.4 mm at 4 bar Holes for evacuation

Cryogenic Test at SIMIC -18/May –All nuts on the covers of the cold vessel were fastened tightly and the warm vessel was evacuated whole weekend. 21/May –He leak test. 1.8Bar He was filled and found that the leak rate was larger than mbarl/sec. Keep evacuation during the night. 22/May –cooling using cold gas from the LN2 tank. Cold gas in the cold vessel Most parts were cooled down to -5~-10 degree C. 23/May –liquid N2 through the cooling pipe. All parts cooled below -110 degreeC around 12:00. –Then N2 gas at 1.0Bar and He gas filled step by step with measuring leak rate. N2 1.0 bar He 0.2 bar  5x10 -7 mbarl/sec N2 1.0 bar He 0.4 bar  1.6x10 -6 mbarl/sec N2 1.0 bar He 0.6 bar  7.8x10 -6 mbarl/sec N2 1.0 bar He 0.8 bar  2.2x10 -5 mbarl/sec The leak was not fixed at SIMIC by any means. We decided to bring the cryostat to PSI and perform a leak test

Cryostat arrived at PSI Delivery at 7:00 am on 5/June Works to be done Cleaning Leak/pressure test Alignment –PMT installation –…

CW received on middle of may (G. Signorelli)

LED PMT Gain Higher V with light att. Can be repeated frequently alpha PMT QE & Att. L Cold GXe LXe Laser (rough) relative timing calib. < 2~3 nsec Nickel  Generator 9 MeV Nickel γ-line NaI Polyethylene 0.25 cm Nickel plate 3 cm 20 cm quelle on off Illuminate Xe from the back Source (Cf) transferred by comp air  on/off Proton Acc Li(p,  )Be LiF target at COBRA center 17.6MeV  ~daily calib. Can be used also for initial setup  K Bi Tl F Li(p,  0) at 17.6 MeV Li(p,  1) at 14.6 MeV  radiative decay  0    - + p   0 + n  0   (55MeV, 83MeV)  - + p   + n (129MeV) 10 days to scan all volume precisely (faster scan possible with less points) LH 2 target  e+e+ e-e- e e     Lower beam intensity < 10 7 Is necessary to reduce pile- ups Better  t, makes it possible to take data with higher beam intensity A few days ~ 1 week to get enough statistics Xenon Calibration

DC (J. Egger)

4 Levels of test 1.Pretest HV Air + tightness 2.Aquarium : functionality + tightness 3.Cosmics Lab : other preamps + correct signal assignment inside COBRA up to panel 4.Cosmics  E5, with and without COBRA

DC test with Cosmic ray (in Lab.)

cosmic ray counter for DC wire alignment 10 counters (10 plastic scintillators + 20 PMTs) are prepared DC wire alignment will be performed w/o COBRA field

TC: F. Gatti

TC: MC vs data: E loss in bars

6 years of operation !!

Positron efficiency Confirmed by a 3° calculation including PR, tracking and fitting from DC to TC

Trigger installation Positrons from “off-centre”  -decays and hitting DCH outer frame missing hits

Trigger installation Where do they come from? x (cm) y (cm) Front view (x-y) of  -decay vertices on the target  all events   2 >50 || N 1 <5 Source of inefficiency for the TC

Trigger installation Way(s) out? Reduction of beam spot size on the target? (  x,y  1.1 cm  0.5 cm) –is it achievable by shrinking the target (not this year) –Background ? Investigate... Increase of the magnetic field? –shrinking of the bending radius by  1 cm needed  increase of B by  7% (B 0 = 1.26 T  1.35 T) distortion of hit pattern on TC? might it affect COBRA behaviour?...

Trigger installation Multi-threading model VME Transfer Thread Calibration Thread Calibration Thread Calibration Thread Calibration Thread Collector Thread VME Round-Robin distribution Network Zero-copy ring buffers Electronics and DAQ: M. Grassi

Trigger installation DRS Readout rate Optimal readout rate of DRS full waveforms with 4 calibration threads: 30 events/s During Dec 06 run max readout at 7 events/s –Double event readout –Code optimization –Single calibration thread

Trigger installation DAQ rate vs. amount of data DAQ speed is not a limiting factor The total data size needs solution: –30 Hz is maximal VME speed for full waveforms → >270 MB/sec –Data transmission limit is 20 MB/sec (=250TB/year) → need online reduction 10x (M. Grassi’s and R. Sawada’s talk) –Storage limit is 30 TB/year → need offline reduction 8x (R. Sawada’s talk)

Trigger installation Conclusions Splitters: installed, operational, expected performances, test in Dec 06 Fiber preamp: problem with an IC fixed, test passed, mounted on the TC detector, installation in Aug 07 Hit registers: mezzanine boards produced, FPGA firmware ready (PSI GPVME board), installation in Aug 07 Trigger: installed, operational, built-in debugging and control tool, need tuning after detector turn on, test in Dec 06 DRS2: installed, operational, good for timing, temperature dependence, usable with DC DRS3: prototype test phase, final solution, not available in 2007 Aux digitizer: production problem solved, prototype test completed successfully, ready for 2007 run DAQ: installed, operational, good performances, test in Dec 06 run The electronics and the DAQ systems are expected to be ready for the 2007 run

A. Baldini PSI 18 July 2007 Software (R. Sawada)

A. Baldini PSI 18 July 2007

Pdf’s – 1) e+e+e+e+  Signal RD Accidental Signal RD Accidental All pdfs normalized to 1 and summed by relative weights of different types of events. Positron FWHM improved from 1.0  0.8 %; photon FWHM improved from 6.5  5 %. FWHM = 0.8 % FWHM = 5 %

A. Baldini PSI 18 July 2007 Pdf’s - 2) tttt  Signal + RD Accidental (assumed flat) Signal Accidental (assumed flat in cos  ) RD  t assumed flat for accidental and gaussian for signal/RD (MC results predict gaussian shape, but with worse resolution);  taken from MC (results close to the proposal FWHM). FWHM = 180 ps FWHM  1 o

A. Baldini PSI 18 July 2007 Sensitivity result Three different sets of windows: results do not depend on the cuts. Three different sets of windows: results do not depend on the cuts. The sensitivity limit is The sensitivity limit is 2.15 x x equivalent to the sensitivity that one obtains with a box equivalent to the sensitivity that one obtains with a box analysis assuming  0 bck. analysis assuming  0 bck. (not surprising). (not surprising). Important point: the spill-in Important point: the spill-in of bck events within the signal region is automatically of bck events within the signal region is automatically taken into account by the taken into account by the knowledge of the bck pdf. knowledge of the bck pdf x of “null” experiment N.B. Empty circles & crosses shifted by 0.05 on B.R. axis for clarity.

A. Baldini PSI 18 July 2007 Advantage: boundary effect Box analysis window Likelihood analysis window 0 events in box analysis Box analysis window Likelihood analysis window 1 event in box analysis Box analysis: quote a worse upper limit, with a “sudden jump”. Likelihood analysis: treated as a bck fluctuation, likelihood value only slightly changed  upper limit increases by a small amount and continuously.

MEG status report 32 PSI: February 14th 2007 Conclusions First result: very good agreement of rates predicted by MC  no significant unwanted backgrounds !!

A. Baldini PSI 18 July 2007 Schedule

A. Baldini PSI 18 July 2007