Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.

Slides:



Advertisements
Similar presentations
The space shuttle Discovery hitches a ride on a modified Boeing 747 carrier aircraft from California to the Kennedy Space Center in Cape Canaveral,
Advertisements

Slide 1 Improving International Collaboration and Teamwork Within the ARISS Working Group Frank H. Bauer, KA3HDO ARISS Chairman ARISS Meeting at ESA ESTEC.
Research Proposal Requirements and Networking Workshop ESTEC, Noordwijk, 13 September 2004.
Georgia Tech Aerial Robotics Dr. Daniel P Schrage Jeong Hur Fidencio Tapia Suresh K Kannan SUCCEED Poster Session 6 March 1997.
The space shuttle Discovery hitches a ride on a modified Boeing 747 carrier aircraft from California to the Kennedy Space Center in Cape Canaveral,
The Vision for Space Exploration – Challenge & Opportunity ISS Panel Report Robert D. Cabana ISS Panel Chair March 30, 2005.
Amateur Radio on the International Space Station (ARISS)
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
ARISS meeting ESTEC 2014 HAM Video ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC Ground Segment Some considerations about alternative.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
VENUS (Vegetation and Environment New µ-Spacecraft) A demonstration space mission dedicated to land surface environment (Vegetation and Environment New.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
AMP – SAMS/MAMS/PIMS 1 GRC Project Manager: MSI/Kevin McPherson Chief Engineer: Alan Linne Safety Mission Assurance Lead: Bipin Patel NASA Customer: SOMD/Brad.
General Program Briefing Dr. Jeff Goldstein Center Director, National Center for Earth and Space Science Education (USA) Institute Director,
Press Briefing 2 August 2000 Frank H. Bauer,
Training Purposes Only JEM FACET JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and disclosed.
ARISS meeting ESTEC 2014 HAM Video Emanuele D’Andria - IØELE.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
ARISSat-1 from 2010 to 2011 Dayton AMSAT Forum 2011 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager.
27-Apr-2009K. Sembach 1 Servicing Mission 4 - Revisited Ken Sembach STScI Hubble Project Scientist April 27, 2009.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
EOP Standard Presentation
ARISS meeting ESTEC 2014 ARISS Europe - Space Agency Support for Educational Outreach Francesco De Paolis – IKØWGF.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
Space Station Will it be accessible for You and Me?
USNA-203 Space Communications International Educational Network … Classroom Experience Navy SERB: 28 Aug 2002 Lt Col Billy R. Smith, Jr., USAF USNA Small.
SuitSat-1 A Unique Satellite By Gould SmithWA4SXM By Gould Smith, WA4SXM.
Space Shuttle Challenger Lee Gray. Shuttle Program: First flight 1983 Began to use the Flight Numbers STS (Space Transport System) Challenger Began.
ARISS meeting ESTEC 2014 HAM Video ARISS International Delegates Meeting, April 3 - 5, 2014 – ESA ESTEC Ground Segment HAM TV standard The effects of the.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
Date: September 24, 2007 Allen Taylor/TBE/FD35 Page: 1 HPA Hand Posture Analyzer Hardware Setup KAYSER ITALIA SRL Piazza 185° R.A. Folgore, 2/ Livorno.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
Exploitation of ISS Scientific data EGI-Aparsen Workshop March Science Park– Amsterdam – The Netherlands Cooperative ISS Research data Conservation.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Avatar Explore PROPOSAL NUMBERS Not available SCIENCE TEAM Erick Dupuis, Canadian Space Agency RESEARCH OBJECTIVES Demonstrate an operational and technical.
Microgravity User Support Center (MUSC) Payload Overview POIWG, July Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013.
Belgian User Support & Operations Centre METERON SUPVIS-E Operations using Ku-Fwd POIWG#38 23 Jul 2015.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Erasmus User Support & Operations Center ESA Payload Operations Overview in Incr : EDR, KUBIK-ROALD2, ERB-2 & EPO CONVECTION POIWG#30, July.
FLEX - FIRE LTE TESTBEDS FOR OPEN EXPERIMENTATION PROJECT OVERVIEW Nikos Makris, University of Thessaly (UTH) Contract number: Starting date: 1/1/2014.
POIWG#30 E-USOC Operations in Increment José Miguel Ezquerro Navarro E-USOC/UPM July, POIWG #30, Hunstville, AL.
First Spaceflight of an Educator Astronaut Barbara R. Morgan - B.A. Human Biology, Stanford University - Teaching Credential, College of Notre Dame, Belmont,
This document is the property of EADS SPACE. It shall not be communicated to third parties without prior written agreement.Its content shall not be disclosed.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #32, July.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
LEYARD DIRECTLIGHT LED VIDEO WALL SYSTEM
Pulkkinen, A., M. Kuznetsova, Y. Zheng, L. Mays and A. Wold
Space: Cooperation in space
Exploitation of ISS Scientific data - sustainability
AGEOS CB ACTIVITIES AGEOS By Aboubakar Mambimba Ndjoungui
Fast and direct access to microgravity research
RADARSAT Constellation Mission Update
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC

Belgian User Support & Operations Centre Outline Few words about B.USOC Operations of Ham Video Commissioning –Set-up –Execution B.USOC involvement after Commissioning ARISS Workshop, 3-5 April 2014, ESTEC2

Belgian User Support & Operations Centre B.USOC in few words… ARISS Workshop, 3-5 April 2014, ESTEC3 Belgian User Support and Operations Centre is located in Brussels, Belgium. The B.USOC was created in 1997 by the Belgian Science Policy within the framework of the European Space Agency ISS Exploitation program. The centre supplies to scientists or end users a set of services and resources to prepare, perform, monitor and analyse experiments on board a facility on the ISS or other satellite platforms.

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC4

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC5 B.USOC recent missions

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC6 PCDF (Protein Crystallization Diagnostics Facility) March 2009 – July A (STS-119) 2J/A (STS-127) In-situ observation of nucleation and crystal growth behavior of protein crystallization in microgravity. To achieve experimental and operational flexibility, extensive preparation was needed. 24/7 console coverage.

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC7 SOLAR: February 2008 – today

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC8 METERON ( ) Teleoperation tests of a robot on the ground from the ISS using DTN to simulate aspects of exploration missions

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC9 Ham Video Commissioning: The Set-up

Belgian User Support & Operations Centre Ham Video front panel ARISS Workshop, 3-5 April 2014, ESTEC10 COL antenna (transmission) PPS (Power) Camera (image data) HAM Video Power ON/OFF 8 configurations Transmission Power ON/OFF

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC11 Configurations cue card

Belgian User Support & Operations Centre Ham Video and HW used for the commissioning: ARISS Workshop, 3-5 April 2014, ESTEC12 ESA Portable Pwr Supply (KUPS) (available in Columbus) ARISS 2 S/L-Band COL Antennas (mounted outside Columbus Module) Ham Video hardware (uploaded with HTV-4) Canon XF-305 with 1 flash card dedicated to Ham Video (provided by NASA via PIA agreement) Multiuse Bracket Assembly dedicated to Ham Video (provided by NASA via PIA agreement) Canon BP-955 fully charged batteries from ISS pool (provided by NASA: will be requested in via CEF, also mentioned in PIA)

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC13 The on-orbit accommodation in Columbus: HAM VIDEO on D1 rack, in front of ER#3 Canon XF-305 Camera on EDR left rack seat track (mounted with bogen arm and used on batteries only) Portable Pwr Supply (KuPS) on D2 rack for PPS activation: PDU 2 outlet 11

Belgian User Support & Operations Centre Flight and Ground Segment operations set-up: ARISS Workshop, 3-5 April 2014, ESTEC14

Belgian User Support & Operations Centre Crew Training & Simulations ARISS Workshop, 3-5 April 2014, ESTEC15

Belgian User Support & Operations Centre 16 Installation Pass 1: Config.Test Antenna #41 Blank Transmission Pass 2: Config.Test Antenna #43 Blank Transmission Pass 3: Config.Test #41 or #43 (reserve) Blank Transmission Legend: Blue box: Crew activity Green Box: Gnd activity Dark blue frame: time critical Commissioning status Performed March 6, 2014, by R. Mastracchio March 8, 2014 by M. Hopkins March by M. Hopkins Not used Pass 4: Functional Test

Belgian User Support & Operations Centre ARISS Workshop, 3-5 April 2014, ESTEC17 Installation Pass 1: Config.Test Antenna #41 Blank Transmission Pass 2: Config.Test Antenna #43 Blank Transmission Pass 3: Config.Test #41 or #43 (reserve) Blank Transmission Pass 4: Functional Test Legend: Blue box: Crew activity Green Box: Gnd activity Dark blue frame: time critical Commissioning status: NET 12 April by K. Wakata (TBD)

Belgian User Support & Operations Centre Pass 4 NET 12 April (TBD) No Ham Video activities during SpaceX-3 docked timeframe. Only trained crew is K. Wakata, coming back on 13 May. After Pass-4 Ham Video is switched off, the bogen arm and the camera will be stowed and the hardware ownership will be handed over to ARISS/NASA. ARISS Workshop, 3-5 April 2014, ESTEC18

Belgian User Support & Operations Centre After Commissioning… B.USOC will create a generic PODF to handle Ham Video (pwr on and configuration change) All ops products will be handed over to ARISS/NASA (POC?) Support required for the planning? ARISS Workshop, 3-5 April 2014, ESTEC19

Belgian User Support & Operations Centre ESA PODF’s ARISS Workshop, 3-5 April 2014, ESTEC20 PODF TITLEStatus Ham Video Installation All ready in IPV Ham Video Deinstallation Ham Video Commissioning Ham Video Yellow LED Contingency Operations Ham Video Green LED Contingency Operations Ham Video Cue Card

Belgian User Support & Operations Centre B.USOC Lessons Learned ARISS Workshop, 3-5 April 2014, ESTEC21 Technical assessments of transmitter interferences with systems from other International Partners and Flight Rule discussions have unfortunately delayed the commissioning significantly Several simulations organized together with ARISS and Col FCT highly contributed to smooth and efficient execution of the passes. Briefing with ARISS pre and post the pass.

Belgian User Support & Operations Centre Thank you! 22