I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Element Based Charging (EBC) used within both BT Basic and BT Transit Telephony Element Based Charging uses switch related elements for charging. This.
1 EBC Evolution Refresher 27 th May 2005 BT Wholesale 1, City Place, Gatwick.
Syndicate A - Issues Geographic nos: –DLERange changes re:parenting & DLE closures DTS, some DTM Solution: correct grid reference and Audit overrides Invoice.
Amendment 3/5 Workshop.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
SLA Basics Describes a set of non functional requirements of the service. Example : RTO time – Return to Operation Time if case of failure SLO – Service.
Electrical Engineering Fundamentals for Non-EEs; © B. Rauf
©Ofcom Voice – the need to take a long term view on sector evolution Chris Rowsell 18 October 2007.
Customer Presentation
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
Lec 26: Ch3.(T&LD): Traffic Analysis – Trip generation
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Standard Contract Forum 20 July Customer Suite, BT Centre, London.
How Much is Too Much? America’s Addiction to Gasoline and Its Impact on the Workforce June 10, 2008.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
From NTS review to unmetered calls: an Internet company’s perspective Simon Hampton European Public Affairs Director AOL Europe.
Airtime Offer from FBS Jan M.K. Jørgensen In the following all prices are: in USD end-user prices in accordance with FBS’ May 2010 price list.
TRANSPORTATION MANAGEMENT
Capital Allocation Survey. Purpose of Allocating Capital  Not a goal in itself  Used to make further calculations, like adequacy of business unit profits,
Chapter 24 Responsibility Accounting and Performance Evaluation
Operation of vDLE concept Revised C&W proposal. Background C&W continue to believe that in the “virtualised” situation CPs should pay connection & rental.
Issue 3.2 (1 st June 2012)Author: Zack Thompson1 NCC Carrier Price List (CPL) Guidance Slides CONVEYANCE TELEPHONY These slides are provided as a ‘rough.
Surftime Industry Forum 21/12/99. OFTEL Internet Forum BT SurfTime BT Announcement on 7 December Possibilities from new Network Approach NTS remains for.
MIGRATION PROPOSAL: CONSULTATION FRAMEWORK Dave D’Arcy This Presentation provides a generic view of feedback received from Communications Providers during.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
A Case Study: BuyPC.com Developed by Jim Morton; UPS Professional Services David Simchi-Levi; MIT Michael Watson; LogicTools, Inc. See also BuyPC.pdf.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 ART approves France Telecom's 2002 interconnection catalogue 30 November 2001.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
IMPLEMENTATION & MIGRATION WORKING GROUP PROVISIONING EXPERTS MEETING Wednesday 1st March 2006.
Interconnect Policy & Contract
1 EBC Workshop Introduction and Welcome.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
Modeling asset and Liability cashflows in a dynamic setting: Basic tools and risk measures 2000 CAS DFA Seminar Robert J. Walling Paratus consulting limited.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
COSTING PRINCIPLES FOR UNMETERED INTERCONNECTION PETER CULHAM CHIEF ECONOMIST OFTEL.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Implementation & Migration Working Group 18 th January 2006 Kevin Young Interconnect & Numbering Services The information in this presentation relates.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
The Regulation of Network Industries Simon Wilkie. Caltech Lecture for May 7, 2004.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
1 DLE to NGS Migration: Contracts Clinic 24 th February 2006 The information in this presentation relates to plans currently under development and subject.
Solar Profiling Interstate Renewable Energy Council presentation to the ERCOT Profiling Working Group Jan. 22, 2008.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
OFTEL’s Approach to Tariff Packages for Accessing the Internet Penny Hierons Economic Adviser.
1 EBC Conference Introduction and Welcome.
BT Wholesale Overflow and High Usage Options Current position - OverflowCurrent position - Overflow Principle for Route Dimensioning is that all Traffic.
Clive Feather 6 May 2005 Virtual IECs – playing the game © Copyright THUS Group plc All rights reserved.
12 September Billing Meeting Summary. Objectives Review of EBC concepts Establish how EBC will be calculated for the following BT terminating BT Originating.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
Economies of Scale.
Economies of Scale.
Economies of Scale.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Number portability Dr. ZOUAKIA Rochdi ANRT
Economies of Scale.
“Sizing the Direct Route”
Economies of Scale.
NCC Carrier Price List (CPL) Guidance Slides
Enabling Large Scale Utilisation of Class 3
Presentation transcript:

I&P: Contracts Clinic 24/02/06 1 Minutes Table Derivation & Application of Overflow The focus of the presentation is on principles: How it works how we operate the calculation These principles have been derived using feedback received during the Minutes Table Consultation

I&P: Contracts Clinic 24/02/06 2 Context Ofcom determination: NCC Technology Neutral Charging BT intends to move to 21CN: DLE Closure Maintaining LES Rate: BT solution is Virtual DLE interconnect

I&P: Contracts Clinic 24/02/06 3 VIC is Designed to: Enable LES rate via NGS Retain current competitive relativities Offer no material advantage / disadvantage Enable new access to LES rate subject to the same conditions as before Protect existing CP investments Ensure CPs pay same amount for circuits and distance to carry the same minutes Ensure CPs continue to pay for local-tandem conveyance when insufficient local capacity procured.

I&P: Contracts Clinic 24/02/06 4 VIC Challenges Technically impossible to route BT originating calls to separate physical circuits for each former DLE. So … “Both way” & Ingress traffic from different DLEs will be mixed on a single route. Individual DLE’s traffic can’t be constrained by peak minutes when its combined on a single route. So we need to control total minutes per DLE in order to approximate the economics of interconnect to individual DLEs

I&P: Contracts Clinic 24/02/06 5 Commercial Logic for VIC CP chooses DLEs for LES rate (as today) CP procures DLE capacity in E1 units (as today) BT rates all calls on VIC routes at LES Existing conveyance bill reconciliation processes apply using EBC files BT compares total LES minutes to the number of virtual E1’s procured for each VIC route. Excess charge applies to minutes in excess of the minutes capacity of the VIC route Minutes Capacity of VIC route set from minutes table (separate values for day / evening / weekend) Excess p.p.m. = ST – LES (for DLE VIC)

I&P: Contracts Clinic 24/02/06 6 Some people get more minutes than others from an E1 Currently minutes constrained by peak capacity with physical circuits Flat traffic gives high minutes per peak erlang Peaky traffic give low minutes per peak erlang

I&P: Contracts Clinic 24/02/06 7 Minutes Table Objective: Route size (E1 Capacity) scaled to TC4 reflects the relative efficiencies of larger routes Minutes per erlang per day reflects CP specific traffic profile Same Capacity + Same Traffic Profile = Same Minutes VIC uses each CPs individual traffic profile to identify minutes per peak hour erlang Ratio of minutes to peak hour erlangs is a characteristic of the traffic stream &

I&P: Contracts Clinic 24/02/06 8 Issue 81 When minutes table derived, CPs who overflow while still meeting obligation to fully provide will have:  A flatter traffic profile & therefore more minutes in the minutes table If overall traffic increases then more circuits will be required  Overflowing routes get more capacity and stop overflowing  Non overflow routes keep same capacity and start overflowing.  So CP not disadvantaged overall If overall traffic profiles change a review can be requested  CPs would request if profile flattened, BT would request if profile went peaky Blue scenario – traffic fits in TC4 15% growth gives purple LES + red at ST

I&P: Contracts Clinic 24/02/06 9 There are benefits of this approach: Monthly tables smooth daily and weekly variations Traffic spikes will generate less ST rate calls

I&P: Contracts Clinic 24/02/06 10 VIC calls are rated at LES rate Excess bill for overflow based on total minutes Excess minutes charged at difference between ST & LES rate ST – LES = LT (defined by NCC) Difference is constant See Carrier Price List Excess Charge

I&P: Contracts Clinic 24/02/06 11 Application of minutes table: VIC route defined by Target DLE, NGS, (and Route ID if segregated route option) May optionally apply to specific direction / traffic types (e.g. CPS, NTS) Separate calculations for day / evening / weekend Minutes Table applies to all minutes assigned to the VIC route  BT billed LES minutes as per standard conveyance bill  CP billed NTS minutes - where CP bills NTS rate minus LES  Minutes are based on routing plan not actual exit POC (for BT originated calls) Number of VIC E1s purchased taken from Circuit billing Minutes allowance looked up from mins table and pro-rated to number of weekdays / weekend days per month Incremental rate is constant so it doesn’t matter which minutes are considered as overflowing E.g for daytime: total minutes =120,000 Allowance=106,029 Excess =13,971 Rate = (from 1/4/2006) Excess charge = £14.96 (ex VAT)

I&P: Contracts Clinic 24/02/06 12 Application of Minutes Table (conceptual model subject to solution design)

I&P: Contracts Clinic 24/02/06 13 Overflow: CP Originated Calls CP NGS DLE Segregated Routing Option: Calls sent via DLE route segment (identified by Route ID) Rated at LES – subject to minutes table excess Calls sent via Tandem route segment (identified by Route ID) Rated at ST – excluded from minutes table excess Calls sent via alternative NGS Rated according to options at alternative NGS Consolidated Routing Option: Calls sent via consolidated route segment (identified by NGS NNI) Rated at LES – subject to minutes table excess Calls sent via alternative NGS Rated according to options at alternative NGS Overflow Minutes either ST rated or virtual excess but never both

I&P: Contracts Clinic 24/02/06 14 Overflow: BT Originated Calls CP NGS DLE Segregated Routing Option: Calls sent via DLE route segment (identified by Route ID in routing plan) Rated at LES – subject to minutes table excess Calls physically overflowing to Tandem route segment or alternate NGS Rated at LES in line with routing plan Included in VIC minutes table Consolidated Routing Option: Calls sent via consolidated route segment (identified NGS/Route ID in routing plan) Rated at LES – subject to minutes table excess Calls physically overflowing via alternative NGS Rated at LES in line with routing plan Included in VIC minutes table Routing Plan determines rate and the VIC so overflow never double charged

I&P: Contracts Clinic 24/02/06 15 Minutes Table Derivation Too complicated to have table by route Too complicated to have tables by DLE Must not discriminate unduly between CPs No material disadvantage or advantage compared with current position Analysis indicates cannot have single table for all CPs

I&P: Contracts Clinic 24/02/06 16 Objectives for CP minutes table Non discriminatory methodology Must accommodate route variability TEST 1:  Must show same circuits required for same minutes overall TEST 2:  Extra E1s required =< Number of contractions

I&P: Contracts Clinic 24/02/06 17 Common Methodology 1.Select sample routes 2.Calculate Common Calculation  Average profile for each CP Average not good enough  Need to allow for variability between routes (Standard Deviation)  Exclude low usage routes with unrepresentative profile 3.Calculate VICs required for each route 4.Apply Tests

I&P: Contracts Clinic 24/02/06 18 How Many Minutes Table(s)? There will potentially be 3 tables per CP: DLE table – generated from fully provided routes only High Usage Route Table – generated from qualifying routes:  Egress only  Up 6XE1 in size  In line with current SIA provisions Tandem Table  Applies to those CP’s taking consolidated traffic only  Recognises that this traffic may have a different profile  Generated from tandem route sample

I&P: Contracts Clinic 24/02/06 19 Representative Routes?

I&P: Contracts Clinic 24/02/06 20 Will we get it right in all cases first time? Probably not, and even if we do you may not have confidence in that Suggested way forward is: Review post “first tranche” transfer  Enshrined in the VIC schedule  CP specific review (based on common principles and methodology)