1. Metering philosophies adopted in SR a.Generally the HV side of ICTs b.Some places the line side c.Tertiary loading of transformers is done at POWERGRID.

Slides:



Advertisements
Similar presentations
GIS: Integrating, Analyzing and Automating It's Easier Than You Think.
Advertisements

Hydrological information systems Svein Taksdal Head of section, Section for Hydroinformatics Hydrology department Norwegian Water Resources and Energy.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Role of ICT in Business ICT in a business environment can be used for:
T-FLEX DOCs PLM, Document and Workflow Management.
The CEGIS Online Bibliography Holly K. Caro In late May of 2009, the Center of Excellence for Geospatial Information Science (CEGIS) decided to consolidate.
Portable Web-based Tracking System Group Members Jennifer Arnold Barabara Davis Luther Durkop Greg Feiner.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Integration of Applications MIS3502: Application Integration and Evaluation Paul Weinberg Adapted from material by Arnold Kurtz, David.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Full Guaranteed & Safe OST Converter Software
Systems Software Operating Systems.
System Implementation
At the North of England Institute of Mining and Mechanical Engineers Library, Newcastle upon Tyne.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Topics Covered: Data preparation Data preparation Data capturing Data capturing Data verification and validation Data verification and validation Data.
Josh Probert – Yankee A Prototype based on Sierra’s SRS.
1.Meter installation database and its up-dating on a regular interval. 2.Meter testing details and last testing done 3.Downloading of data and transmission.
Systems Analysis – Analyzing Requirements.  Analyzing requirement stage identifies user information needs and new systems requirements  IS dev team.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
MAHI Research Database Data Validation System Software Prototype Demonstration September 18, 2001
Lesson 14: Installing and Uninstalling Programs how to install a new program what to do if the new program doesn’t work how to uninstall a program © CCI.
ITEC224 Database Programming
1. WHAT IS METER ? A device which measures, indicates and records certain measurable quantity. 2. WHAT IS ENERGY METER ? A device which measures, indicates.
Metering & Data Processing
End HomeWelcome! The Software Development Process.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
FotoGazmic Software (From left to right: Chad Zbinden, Josey Baker, Rob Mills, Myra Bergman, Tinate Dejtiranukul)
ITGS Case Study Theatre Booking System Ayushi Pradhan.
SPECIAL ENERGY METER STORES STORES THE FOLLOWING DATA DURING THE 10 DAYS PERIOD (i)15 MIN. BLOCKWISE ACTIVE ENERGY FOR 10 DAYS (ii)15 MIN. BLOCKWISE AVERAGE.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Metering Regulations alka NPTI, PSTI Bangalore. 1. Short title and commencement. These regulations may be called the Central Electricity Authority (Installation.
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Silberschatz, Galvin and Gagne  Operating System Concepts Chapter 3: Operating-System Structures System Components Operating System Services.
DATA, SITE AND RESOURCE MANAGEMENT SOFTWARE. A Windows application software designed for use with Stylitis data loggers. EMMETRON consolidates resources,
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
Systems Life Cycle A2 Module Heathcote Ch.38.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Train & Assess IT Office XP and Office 2003 Web-based Training and Assessment in a Single Product! New and Improved Enhancements Direct from Market and.
Page 1 Printing & Terminal Services Lecture 8 Hassan Shuja 11/16/2004.
VIGNAN'S NIRULA INSTITUTE OF TECHNOLOGY & SCIENCE FOR WOMEN TOOLS LINKS PRESENTED BY 1.P.NAVEENA09NN1A A.SOUJANYA09NN1A R.PRASANNA09NN1A1251.
Topic 4 - Database Design Unit 1 – Database Analysis and Design Advanced Higher Information Systems St Kentigern’s Academy.
Learning Objectives Understand the concepts of Information systems.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
E0262 MIS - Multimedia Playback Systems Anandi Giridharan Electrical Communication Engineering, Indian Institute of Science, Bangalore – , India.
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Introduction to System Analysis and Design MADE BY: SIR NASEEM AHMED KHAN DOW VOCATIONAL & TECHNICAL TRAINING CENTRE.
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 testing and installation 1 for testing you need: test data and test cases test plans and.
The information systems lifecycle Far more boring than you ever dreamed possible!
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
 Software reliability is the probability that software will work properly in a specified environment and for a given amount of time. Using the following.
Full Review of Jihosoft Android Data Recovery
DFR Downloader Theo Laughner, PE Presented at GPA User Forum August 5, 2015.
PDF Recovery Tool Fix Portable Document File Format.
DXL to PST Converter presents
TRANSACTION PROCESSING SYSTEM (TPS)
The Development Process of Web Applications
Chapter 25: Advanced Data Types and New Applications
Systems Analysis and Design
MT Division BMAZ Bangalore
SDMX Reference Infrastructure Introduction
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Objective Understand web-based digital media production methods, software, and hardware. Course Weight : 10%
System Analysis and Design:
Chapter 2: Building a System
Presentation transcript:

1. Metering philosophies adopted in SR a.Generally the HV side of ICTs b.Some places the line side c.Tertiary loading of transformers is done at POWERGRID S/S to meet the load of S/S. The amount will be paid by POWERGRID to the respective constituent 2.Working out future requirements a.As per the progress Report of the SRPC. b.In consultation with the SRTS I & II c.Spares requirements ( 10 t0 15 % )

3.Problems in Meters/DCD a.There are at times problems in the connecting cables b. If time correction of more than one minute has to be carried out in L&T meters, the meters have to be sent to factory – alternate solution i.e. correcting the time at the site may be explored c. Transfer of the program in to the DCD

4.Automatic Data down loading from meters As per the earlier decision, SRLDC has tried the automatic data down loading from Somanahally S/S, Bangalore. The data downloading is successful. But the following observations are few Each meter data is made with a separate text file. Hence no. of meters = no. of text files. Merging of all the text files provision is not there.

4.Automatic Data down loading from meters Modification required in L&T make software for Special Energy Meter 1.Conversion of meter data from *.dat file to *.npc file should be made possible through one operation instead of Importing the *.dat file first and then converting it into *.npc file. Moreover, these two operation i.e. importing and conversion takes considerably high time. 2.During conversion, “DATE & TIME” feature provided by the present software complicates the conversion procedure. This feature is not needed for converting *.dat file to *.npc file. Rather because of this feature there are more chances of error as it requires manual intervention.

4.Automatic Data down loading from meters 3.It should be made possible to convert multiple *.dat files into *.npc file through one operation instead of taking one file at a time for conversion which is time consuming. 4.Import and Conversion time should be less complicated and less time consuming. 5. While dumping data from DCD to computer it does not ask for any file name instead the software automatically gives a file name. It is very difficult to recognise the location of the meter from the file name. It is suggested that there should be an option of giving file name while downloading wherein the earlier ddmmxxx convention should be used.

4.Automatic Data down loading from meters 6.If data is downloaded through RS-485, it is observed that a single file is created for every single meter and every file is to be converted to *.npc file separately. So if there are 500 meters in a region, 500 times the same operation is to be made only for converting the *.dat file to *.npc file which is time consuming and will lead the entire procedure to be delayed.

4.Automatic Data down loading from meters 5.Data Processing a.Methods b.Special tools employed in quick validation. c.Common problems encountered d.Special problem encountered… case studies if any 6.Data Storage/Retrieval and MIS a.Database for storage if any b.Means of retrieval, User interface c.Standard MIS…….daily/weekly/monthly/yearly As per NRLDC, a separate module is going to be made

7.Meter Calibration and testing a.Frequency of testing As per the IEGC, every year the calibration has to be done with the accu check or MTE. Every five years, the meter has to tested in the accredited laboratory.

8.Scheduling Issues: a. Software, ease of operation and functionalities b.Incorporation of Open Access Schedules c.Impact of new regulations on Hydro station scheduling….. Issues? d.Methods of loss estimation and usage in schedules e.Rounding of the schedules at each control area boundary/seam f.Co-ordination with other RLDC for Inter-regional schedule and actuals g.Treatment of losses on inter-regional lines (basically fixing of Inter-regional metering points)

9.Pool Operation a. Philosophy of accounting mismatches in payable and receivables b.Impact of losses c.Philosophy of capping thermal stations d.Payment Priorities

10.Metering Regulations, IEC standard on meters, CT, CVTs a.Discussions on salient points or special points 11.Intra-State ABT a.Progress in various states b.Methodologies adopted in states where it has been implemented or to be implemented…… frequency based unscheduled rate or different. c.Details in case of different philosophies.

B. Requirement of enhanced features in accounting/data handling software Requirement of enhanced capabilities in exiting software for the purpose of better data storage, validation, user friendly interfaces for retrieval and MIS. a.Compatible database with on-line/off line studies and reporting software b.Integration of Scheduling, Open Access and Metering modules for better MIS c.Preparation of requirement for the same d.Incorporation of these requirements in software