Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
2011 North American Sales Meeting Garry Freiss Doing Business with the AUMA Service and Spare Parts.
Indian Plan for Contribution in Superconducting Cavity & Cryomodule Technology Prashant Khare Avinash Puntambekar RRCAT,India.
Phone List Estimates Quotes Jobs Time Sheets Sales Calls Administration Reports Purchase Orders M.E.E.M. Mgnt. Inc. 2006©
Mechanical Integrity Controlling Equipment, Materials & Supplies.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
First Article Inspection
1 ROLES, RESPONSIBILITIES, AND TIMELINES FOR CONTRACTING ADMINISTRATIVE GUIDELINE NUMBER 3 Harpers Ferry Center Office of Acquisition Management August.
RF Cavity / Coupling Coil Module
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
“LOGISTICS AND SHIPPING” WORKSHOP Presenter: Beverly Johnson June 26, 2015.
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
TECH 104 – Technical Graphics Communication
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
From Research Prototype to Production
Chapter 11 Subcontractor Work. Introduction Subcontractors perform 80% or more of the on-site work in residential construction. Often, the homebuilder.
Setting up an Internal Audit Program By
Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ch 3-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
Quotation Exercise Establishing your requirement Existing Contracts New requirementConsolidate supplier spend ↓ Compile EstimateObtain ApprovalIn-house/external.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
5/28/2016Focus Tech Solutions1 Introduction of. 5/28/2016Focus Tech Solutions2 About Focus  Focus Tech Solutions provides inspection services to manufacturers.
The Advanced Manufacturing System Advanced Dealer Training Version 3.0.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Proprietary + Confidential1 Tech Review Guideline Please arrive at your Tech Review ready to present and discuss all of the following information. The.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
BCS Software Developed by M.E.E.M. Mgnt. Inc. BCS: The User Friendly Management Tool Overview Review M.E.E.M. Mgnt. Inc. 2013
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
1 ISE Chapter 24: Determining Time/Job Uses for time/unit information  Cost allocation  Production and inventory control  Evaluation of alternatives.
What is Contracts? When two or more persons have common intention communicated to each other to create same topic & done the agreement that is called.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Component Sourcing - Overview AUGUST 2009 Citadel Industries - India.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Regional Coordinators Meeting
“P LAN FOR TMT A CTUATOR P RODUCTION AND Q UALITY C ONTROL ” (India) M1CS Actuator Preliminary Design Review TMT Project Office – Pasadena 14, 15 and 16.
PRODUCT DEVELOPMENT PROCESS By PERUMALSAMY M
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
MECHANICAL PARTS FROM INDIA: Low Cost & Safe Procurement
Design of the Injection Can
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
THIRTY METER TELESCOPE : SSA
FFAG Magnets and Girders Meeting
Modern Furniture Mexico Three Seater Sofa in Black Colour by Furnitech.
MANUFACTURING SERVICES PRESENTATION
Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh.
First Article Inspection
HART Technologies Process Overview
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

Actuator for the TMT Preliminary Design Review TMT Project Office – Pasadena 1 and 2 October 2013 P.K. Mahesh, P.S. Parihar, Surojit Kumar Roy, Prasanna G. Deshmukh TMT.CTR.PRE.aa.aaa.CCR011 India TMT Co-ordination Centre (ITCC)

Plan of talk –Supplier Qualification Status and Plans. 1. PII + activites at Avasarala Technolgies Limited (ATL) 2. Brief overview of actuator activity in India. 3. Comaprison of estimated production costs 4. Additional Suppliers 5. Any other business TMT.CTR.PRE.aa.aaa.CCR012 India TMT Co-ordination Centre (ITCC)

Supplier Qualification Status and Plans. TMT.CTR.PRE.aa.aaa.CCR013 India TMT Co-ordination Centre (ITCC)

1. PII + activites at ATL –Ten assembled actuators (PII +) and one set of manufactured parts made at Avasarala Techologies Ltd., Bangalore, India (ATL) –Functional tests conducted at works of ATL at Bangalore Actuator functional test.xls –Third party inspection of parts done by TMT at Pasadena-Results acceptable; Clearance to go ahead for the rest provided by TMT collection_of_AML_prototype_actuator_reports.xlsx TMT.CTR.PRE.aa.aaa.CCR014 India TMT Co-ordination Centre (ITCC)

2. Brief overview of actuator activity in India. –Summary of efforts at ATL. Learning from ATL. ATL noted that some hole dimensions were missing in the SAT Housing drawing. TMT noted and corrected the drawing ATL also noted some missing dimensions and wrong dimensions in other drawings like that of Connecting Link, Upper Connect Block etc. TMT noted and corrected the same. TMT.CTR.PRE.aa.aaa.CCR015 India TMT Co-ordination Centre (ITCC)

While assembling Connecting Links and Copper plate, ATL found centre to centre distance of holes i.e., 93mm of Copper Plate was not matching with the Connecting Links. TMT checked and changed the dimension of Copper plate. A fixture for assembling the magnets was designed and made by ATL which enables magnets to be assembled for an actuator by 2 personnel in 20 minutes. TMT.CTR.PRE.aa.aaa.CCR016 India TMT Co-ordination Centre (ITCC)

Schedule –Delay in schedule in first et of parts and 2 assembled actuators. –Delay due to non-availability of certified material in small quantities and also technical problems encounterd in casting. –Problem encountered in obtaining bought out items from McMaster –Schedule for second stage-manufacture and assembly of 8 actuators-ahead of planned period TMT.CTR.PRE.aa.aaa.CCR017 India TMT Co-ordination Centre (ITCC)

Quality TMT.CTR.PRE.aa.aaa.CCR018 India TMT Co-ordination Centre (ITCC)

Quality TMT.CTR.PRE.aa.aaa.CCR019 India TMT Co-ordination Centre (ITCC)

TMT to visit ATL to conduct quality audit. TMT.CTR.PRE.aa.aaa.CCR0110 India TMT Co-ordination Centre (ITCC)

3. Comaprison of estimated production costs –Comparison of prices of bought out parts. Brought out parts ITCC Vs ATL Vs TPG.xls –Comparison of Production Cost Actuator Bulk Qty Prices_Comparison.xls –Production cost estimate by ATL BY ATL Revised Quote xlsx TMT.CTR.PRE.aa.aaa.CCR0111 India TMT Co-ordination Centre (ITCC)

4. Additional Suppliers –Avalon Discussion for 5 sets of prototype conducted with Avalon. Quote was provided. Avalon_Copy of Offer sheet for TMT (12-Sep-13).xls Inputs required from TMT about materials substitution, list of bought out items, fasteners and assembly procedure. Avalon will provide the standards of AMS for alternate raw material Assembly, shipping and packing price will be supplied by Avalon. TMT.CTR.PRE.aa.aaa.CCR0112 India TMT Co-ordination Centre (ITCC)

Sand casting for protoypes. One mould required for 1600 numbers of casting. Pressure die casting for production Avalon will provide the details for Delrin and 18-8 SS material. Avalon will provide the standards of AMS for alternate raw material –Godrej and L&T to be contacted to provide quotation. TMT.CTR.PRE.aa.aaa.CCR0113 India TMT Co-ordination Centre (ITCC)

5. Any other business. TMT.CTR.PRE.aa.aaa.CCR0114 India TMT Co-ordination Centre (ITCC)