E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola 23-09-2014.

Slides:



Advertisements
Similar presentations
Susana Izquierdo Bermudez, on behalf of the winding team
Advertisements

Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
Raúl Morón Ballester TE-MSC-LMF
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
LARP Collaboration Meeting Racetrack Coil Fabrication
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
MQXFS1 Coils QC & DRs J. Schmalzle May 14, MQXFS1 Coils MQXFS1 Coils SQXF03 & SQXF05 – Reaction Temperature Data – Electrical Checks – DRs May 14,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
Long coil manufacturing plan and QC at CERN F. Lackner, P. Ferracin, H. Prin, M. Duret, F. Savary, L. Favier, S. Triquet, S. Luzieux, R. Principe, C. Scheuerlein,
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
Coil Design and Fabrication
Status of the manufacturing process of a Nb3Sn wiggler prototype
Model magnet test results at FNAL
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
To be presented at Nb3Al R&D Review,
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
QXF schedule and milestones
Presentation transcript:

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Outline 2 Coil NameDescriptionStatus SQXF-000First Practice (Cu)Splice/Instrumentation SQXF-101Second Practice (Nb3Sn – Low grade)Reaction SQXF-102First Coil (Nb3Sn)Winding (starting OL) 1.Status 2.Ceramic binder to improve cable mechanical stability during winding? 3.Pole gaps 4.Coil parts 5.Trace QA

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Coil 000 Nb 3 Sn – NbTi splice done Solder: Sn 96 Ag 4 Flux: MOB39 Copper stabilizer (Instead of an additional NbTi lead) 3

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Coil 101 Reaction We are using this coil to optimize the temperature cycle in the oven. Heat treatment completed 2 nd heat treatment done with short plateaus 3 rd heat treatment to be done only with first plateau 4

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Coil 102 IL wound using the tool, but without applying ceramic binder at the ends (winding in the favourable direction, no problems of mechanical instability) 5

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Coil 102 IL cured 6

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Ceramic binder during winding CTD-1202X From the technical specification: Curing 1 hour at 80°C + two hours at 150°C We notice that if we cure at T < 150°C, after 10 minutes the cable is still wet and the insulation is not rigid. 7

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Ceramic binder during winding PROCEDURE Paint binder on the cable Heat the cable on one side, and time 3 mins (after 3 mins, the cable temperature is ~150°C) Heat the other side 3 mins. The cable is still wet and the insulation is not rigid. We cut the insulation and the fibres are not glued (very similar behaviour in the region with and without). 8

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Ceramic binder during winding 9 We repeated the process, heating up to 250°C, but the cable is still wet and the insulation is not rigid.

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Pole gaps 10 Initial pole gap set for each coil Coil 000 Cu: 3 mm Coil 101 Nb 3 Sn lowgrade: 7.5 mm Coil 102 Nb 3 Sn: 5 mm

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Pole gaps 11 Check of pole gap during fabrication Initial GAP (set before winding) [mm] GAP just after curing and release tension [mm] GAP before heat treatment [mm] GAP after heat treatment [mm] Coil 000 (Cu) * Coil 101 (Nb 3 Sn low grade) 7.56 Coil 102 (Nb 3 Sn) 5 * gap after heat treatment evaluated by sight (no possibility to measure it): however the gap is almost closed.

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Pole gaps 12 Pole gap on Coil 000 (Cu) after heat treatment

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Coil Parts CERN Pole and end-shoe extension for coils missing, Miao, when do you thing you will be able to ship them? End parts Coil 3: Expected delivery calendar week Coil 4: Expected delivery calendar week 41 LARP End parts Coil 5: End parts shipped CERN  FNAL 21/09/2014 Coil 6: Company  CERN, Calendar week 40 Coil 7&8: Company  CERN Calendar week 42/43 13

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Coil Parts Company confirms that they use oil only for the machining of the treaded holes. They do not have the means to do ultrasonic cleaning by themselves. We will clean the parts at CERN using a standard procedure developed at CERN for cleaning Tungsten (porous material) LHC- VN-FP-0001 EDMS Degreasing by immersion in Topklean MC 20A with ultrasonic agitation at 40 °C; Degreasing by immersion in Promosolv 71IPA with ultrasonic agitation at 59 +/- 4°C; Degreasing in vapour phase in Promosolv 71IPA; Vacuum firing. 14 Oil trapped inside the parts (coming from the wire EDM and machining operations after the SLS)

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Trace QA Test set up 15

E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot X. Sarasola Trace QA Test results 16