Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss,

Slides:



Advertisements
Similar presentations
1 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax :
Advertisements

Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
 Outline: ◦ 325 MHz Superconducting Spoke Resonators in the Project X Linac (HINS front end). ◦ SSR1 Single Spoke Resonator with β g =.21: Fabrication.
Tuning system requirements
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
ESS cavities interfaces
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
The design of elliptical cavities Gabriele Costanza.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Group 6 / A RF Test and Properties of a Superconducting Cavity Mattia Checchin, Fabien Eozénou, Teresa Martinez de Alvaro, Szabina Mikulás, Jens Steckert.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
56 MHz SRF Cavity and Helium vessel Design
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
RF-Dipole Cavity: Processing and RF Measurements Procedure
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
LASA status for medium-beta cavity Paolo Michelato.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
1 SLHiPP2013 meeting – Louvain la Neuve Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : +33.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
Spoke Cavities developments in Europe CNRS/IN2P3/ IPN– Paris-Sud University Sébastien Bousson On behalf of the IPNO team.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
WP5 Elliptical cavities
Status of developments at CEA-Saclay
Power Couplers, HOM Couplers and Tuners for the XFEL
Odu/slac rf-dipole prototype
SPS – RFD Experience and Evolution to LHC
VERTICAL TEST RESULTS OF SPOKE RESONATOR AT IPNO
Erice Lecture 2 Padamsee
Development of the SRF Cavity Design for the Cooler ERL
Review of the European XFEL Linac System
CEPC Main Ring Cavity Design with HOM Couplers
Cryomodules Challenges for PERLE
Challenges, Progress and Plans of SRF CH-Structures
HWR and Test Cryomodule for China ADS
Presentation transcript:

Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss, cell to cell coupling Multipactor, surface preparation Sensitivity to LHe pressure, to LFD, to microphonics

Extraits des présentations CARE/HIPPI (G. Devanz, J. Plouin, S. Chel)

Example : HIPPI cavity Frequency [MHz]704 geom  0.47 opt  0.52 r/Q [  ] G [  ] Epeak/Eacc3.36 Bpeak/Eacc5.59 RF parameters end-tubes :r = 65 mm Below 500 Hz:Only 1 mode is relevant for LFD (sym. Cav) Design principle #1 : symetric end-tubes

r 1 = 62.5 mm r 2 = 110 mm Stiffness2.25 kN/mm Tuning sensitivity308 kHz/mm tuning stress49 MPa/mm Tuning 300K assuming  y = 40 MPa +/- 250 kHz Response spectrum to a step excitation shows less peaks with reduced magnitude (2 rings) Mechanical Parameters Strengthen the cavity w.r.t external pressure Design principle #2 : two sets of rings

Regulations  the cavity must sustain twice the maximum pressure Max Pressure = 1.3 bar during test in vertical cryostat -> Preg = 2.6 bars Structural FEM calculations with fixed ends Sym + 1 set of rings : max stress on beam tube iris 90 MPa Sym + 1 set of rings + stiffeners on beam tube iris : max stress around ring /cell junction 70 Mpa and 50 equator weld And with second set of rings: max stiffener/outer cell junction 40 MPa equator 29 MPa

With fixed ends

Measurement of static LFD (1) temperature changes during experiment -> pressure changes-> need for a correction of the frequency measurements (black dots) Very good result KL = -3.8 Hz/MV/m

taking into account the fact that the thickness of the real cavity is not constant: extreme cases : 4 mm theoretical basis for the design 3.3 mm average value measured on the real cavity on the non stiffened part of the cells The real cavity is somewhere in between... effect of the external stiffness on K L Measurement of static LFD (2)

Other requirements: -Global Stiffness > 50 kN/mm (shape of Helium tank) -Appropriate cooling of the FPC (port inside the helium tank) -Provide enough space for PU port, tuning system, HOM ports -Ability to add stiffening rods for tests w/o tuning system

Fabrication of the Niobium cavity  Dimension controls and visual inspection (endoscope)  Degreasing in ultra-sonic bath  Vacuum test ; frequency+dispersion curve measurement  Preparation of the antenna for cold test in vert. cryostat  Chem. polishing on the inner face (FNP 1-1-2, 150 um)  Ultra-pure water rinsing  Field flatness ; frequency+dispersion curve measurement  Degreasing in ultra-sonic bath  Heat treatment at 650° for 24 hours (<10-6 mbar)  Field flatness ; frequency+dispersion curve measurement  Chem. polishing on the inner face (FNP 1-1-2, 20 um)  Ultra-pure water rinsing  HPR, drying, cavity assembly and vacuum test in CR  Cold test in vertical cryostat with a fast cool down  Cold test in vertical cryostat with a slow cool down  Slow admission of CR air in the cavity up to 1bar  Sealing up of the cavity in CR ; delivery to manufacturer AISI 316LN bellows after 650° heat treatment=ok

Set-up for adjustment of field flatness Plastic deformation DL [mm]2 Cavity axis & set-up axis parallelism [°]2 Total axial displacement [mm]5 Precision of axial displacement [mm]0.5 Specifications

TTF 9-cell cavity

 End of Helium tank fabrication without opening the cavity (sealed up with clean air)  Vacuum test of the Helium tank and mandatory controls  Delivery to CEA-Saclay Tuning system applicators RF Coupler port cooled by LHe RF Pick-up port Cryogenic ports Helium tank end-disk and bellow Nb Conical ring Helium tank cup and wings optimized to reach a stiffness>50kN/mm At the end of Phase 2, the cavity is ready for preparation, measurements and cold tests in horizontal cryostat

 = 0.47 cavity tested in vertical cryostat cavity equipped with the helium tank (left open for the tests) stiffening rods replaced by a compact stiffener to reduce the effect of k ext on the static Lorentz detuning coefficient K L test at 1.8 K after HPWR only (no new BCP since the first test) Rs = 6 nW Field emission onset 12 MV/m Quench at 15 MV/m

design based on Soleil, 3HC, CARE-SRF (aka Saclay-II) family of tuners symmetric slow tuning +/- 2.5 MHz planetary gear box for reliability single piezo frame with preload independent of cavity tuning does not increase cavity length Système d’Accord: Saclay IV

Assembly with

TTF 9-cell cavity

Magnetic shield Cryoperm® material theoretical shielding factor 33 (opera 3D simulations) Rs=6n  in vertical cryostat, low Eacc, 1.8 K Aiming at Rs < 8 n  in CryHoLab B<0.6 mT

TTF 9-cell cavity 700 MHz setup

TTF 9-cell cavity Cavité SPL_HE_v1 (704 MHz -  =1) betaEacc [MV/m]K L [Hz/(MV/m) 2 ]detuning statique [Hz] 0.47 (HIPPI) (mesure) (SPL)19-2 (calcul cavité similaire)720 1 (SPL) (calcul)313 1 (TTF) ( mesure)438

TTF 9-cell cavity Cavité SPL_HE_v2 (704 MHz -  =1)