1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross.

Slides:



Advertisements
Similar presentations
Beam Test of a High-Pressure GH 2 -Filled RF Cavity (for efficient muon beam cooling for a MC or NF, since the low-Z ionization energy-loss absorber and.
Advertisements

The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
The Muon Accelerator Program “High”- Gradient Normal Conducting RF R&D Alan BrossUS HG Workshop February 9-10, Meeting the RF in Magnetic Field Challenge.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
LiH Absorber for MICE Alan Bross May 31, LiH Absorber in Cooling Channel  LiH absorbers are now the “baseline” for the initial 4D cooling u Replaced.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
PEALD/CVD for Superconducting RF cavities
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
Mahzad - 8/9/2007 AAC Presentation 1 High Pressure RF Studies Mahzad BastaniNejad Muons, Inc., Old Dominion University Muons, Inc.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
The Neutrino Factory and Muon Collider Collaboration R&D Program and Participation in the IDS.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
A. Bross MUTAC Meeting BNL April MuCool Overview Muon Cooling R&D Alan Bross.
MCTF Neutrino Factory and Muon Collider Collaboration R&D Alan Bross Accelerator Physics Center Fermilab AAC Meeting May 6, 2008.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MCTF C. Johnstone MUTAC Meeting 8-10 April Debut of the MTA beamline Description, status and commissioning plans.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Topical workshop on The Neutrino Factory and Muon Collider Oct 2007 RF Systems for a Neutrino Factory Rebecca Seviour Cockcroft Institute Lancaster University.
MCTF Andreas Jansson MUTAC Meeting 8-10 April MCTF EXPERIMENTAL ACTIVITES - towards demonstrating 6D cooling.
RF studies at Fermilab MuCool Test Area Fermilab MuCool Test Area MuCool Test Area (MTA) at Fermilab is a dedicated facility at the end of the LINAC built.
Recent progress of RF cavity study at Mucool Test Area Katsuya Yonehara APC, Fermilab 1.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
NFMCC Meeting 3/12/06 A. Bross MuCool Overview Muon Cooling R&D NFMCC Meeting March 12, 2006 A. Bross.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
DOE Program Review 5/17/06 A. Bross Muon Accelerator R&D DOE Program Review May 17, 2006 A. Bross.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
RF Breakdown Study Arash Zarrebini MuCool RF Workshop 15 th October 2008 U.K Cavity Development Consortium.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
MUTAC 04 - April A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC 04 A. Bross.
Progress of high pressure hydrogen gas filled RF cavity K. Yonehara APC, Fermilab 11/02/111 Joint MAP & High Gradient RF Workshop, K. Yonehara.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
US Construction Project: SSs, PRY, Cavities and test program 1.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
RF R&D (Issues) for Muon Ionization Cooling Channels
Completion of the MICE-US construction project
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Requirements for Efficient CW SRF Cryomodules
Injector Performance Requirements Conventional Facilities Update
Presentation transcript:

1 Alan Bross MUTAC April 9, 2008 MuCool Program Overview Muon Cooling R&D Alan Bross

2 Alan Bross MUTAC April 9, 2008 Outline  MuCool OverviewAB u Collaboration u MuCool Test Area u Program Synopsis u MuCool Phase II  201 MHz RF ProgramD. Li  805 MHz RF ProgramD. Huang  LiH Absorber ProgramAB  Coupling CoilM. Green  MTA Beam Line (MCTF)C. Johnstone

3 Alan Bross MUTAC April 9, 2008 MuCool  Consists of 10 institutions from the US, UK and Japan RF Development ANL Cockcroft Institute Fermilab IIT JLAB LBNL Mississippi Absorber R&D Fermilab IIT KEK NIU Mississippi Osaka Solenoids LBNL Mississippi  Mission u Design, prototype and test all cooling channel components u 201 MHz RF Cavities, LH 2 absorbers, SC solenoids u Support MICE (cooling demonstration experiment) u Perform high beam-power engineering test of cooling section components

4 Alan Bross MUTAC April 9, 2008 MuCool Test Area  Facility to test all components of cooling channel (not a test of ionization cooling) u At high proton beam power s Designed to accommodate full Linac Proton Beam Power s 1.6 X Hz – 2.4 X p/s –  600 W into 35 cm LH MeV u RF power from Linac (201 and 805 MHz test stands) s Waveguides pipe power to MTA

5 Alan Bross MUTAC April 9, 2008 MTA Hall

6 Alan Bross MUTAC April 9, 2008 RF Cavity R and D ANL/FNAL/IIT/LBNL/UMiss

7 Alan Bross MUTAC April 9, 2008 Fundamental Focus Of RF R&D  Study the limits on Accelerating Gradient in NCRF cavities in magnetic field  It has been proposed that the behavior of RF systems in general can be accurately described (predicted) by universal curves u Electric Tensile Stresses are important in RF Breakdown events  This applies to all accelerating structures

8 Alan Bross MUTAC April 9, 2008 Detailed Modeling Code Now Available Must define experiments to vet this code

9 Alan Bross MUTAC April 9, 2008 NCRF Model Extended to SCRF  We have extended this model to SCRF and high frequency problems.  We are working with the Argonne Materials Science Division to develop: u A materials science program to understand chemical, morphology and electronic properties of rf SCRF and NC materials u Cavity tests to determine optimum procedures and performance.  This program is underway and, using Argonne internal funding, and has produced important results: u We have developed a model of High Field Q-Slope based on magnetic oxides, that seems to explain SCRF cavity data. u We have developed a new procedure to produce niobium surfaces without complex oxides. u We are beginning a program of cavity testing with JLab.  Using Atomic Layer Deposition and other newly developed materials science techniques we can synthesize and analyze surfaces with unprecedented precision. s Limits maximum gradient

10 Alan Bross MUTAC April 9, 2008 Extension To SCRF  We are extending our experimental program to explore the ultimate gradient limits of “perfect” surfaces, which have the properties that (ATOMIC LAYER DEPOSITION): u They are smooth at the nanometer level, so local fields (~1/r) cannot be high enough to produce field emission or breakdown events u They are layered, with thin superconducting layers that are expected to be resistant to B field quenches. u They are homogeneous, so local “hot spots” should not exist. u They can be applied “in-situ” so they are not subject to assembly defects. u They allow almost complete freedom to choose substrate for conductivity, rigidity, etc. to avoid thermal, Lorentz and microphonics effects.  We expect we should be able to address known failure modes and produce structures that reach significantly higher gradients in both normal and superconducting systems.

11 Alan Bross MUTAC April 9, 2008 The Basic Problem – B Field Effect 805 MHz Studies  Data seem to follow universal curve u Max stable gradient degrades quickly with B field  Remeasured u Same results Gradient in MV/m Peak Magnetic Field in T at the Window >2X required field

12 Alan Bross MUTAC April 9, MHz Imaging

13 Alan Bross MUTAC April 9, 2008 Next 805 MHz study - Buttons  Button test u Evaluate various materials and coatings u Quick Change over

14 Alan Bross MUTAC April 9, 2008 RF R&D – 201 MHz Cavity Design  The 201 MHz Cavity – 19 MV/m Gradient Achieved (Design – 16MV/m) u In low (few hundred G) B field. Still no breakdown. Limited by available power

15 Alan Bross MUTAC April 9, MHz Cavity Operation in B Field  Initial 201 MHz operation in B Field u Limited to few hundred Gauss s Using Fringe Field of 4T magnet (in blue) 5T – Solenoid Mode

16 Alan Bross MUTAC April 9, in Position  We have now moved 201 as close as possible to 5T solenoid  Can obtain  1.5T on near window of 201

17 Alan Bross MUTAC April 9, 2008 LiH Absorber R&D

18 Alan Bross MUTAC April 9, 2008 Production of LiH Disks  Only 1 vendor was found that would cast LiH u After some reflection (and some input from Chemists from Argonne Lab), the vendor decided casting LiH was too dangerous (production of H 2 gas)  Working with Y12 (Oakridge) u Found the engineer in charge of their LiH work and he suggested that they press (Hot 150C, Isostatic (30,000 psi) a “loaf” and machine parts to our specification from the loaf s They have achieved 98% theoretical density using this technique s They are doing R&D on casting LiH for their internal programs, but do not recommend it for our application. –It is very tricky due to the high temperature (700C +) and the large (30%) shrinkage on cooling  We are in the process of setting up a contract with them to make a disk for temperature studies and 1 or 2 disks for MICE u Note: The Li in their LiH is 6 Li s For the mass we will receive, our parts will be considered Nuclear Material –This will require additional proceedures/paperwork for shipment, but Y12 personnel see no inherent problem

19 Alan Bross MUTAC April 9, 2008 MuCool Phase II Cryo-Infrastructure Installation/Commission Beam Line Installation/Commission

20 Alan Bross MUTAC April 9, 2008  MTA Reconfiguration u Commission Cryo-Plant (June 2008) u Install Transfer Line system u Raise Equipment to beam height u New shield wall  Working on Project Plan   3 month effort with adequate technician resources s Need 5 technicians full time (estimate is about 2000 hours) s Plus 5 weeks of a welder s Plus $50k in M&S (Does not include rerouting of RF power)  Need to complete before the 2009 (March) Accelerator Shutdown MTA Cryo-Infrastructure

21 Alan Bross MUTAC April 9, 2008 Existing Dewar-Fed Cryogen System  All of this is removed  New (simpler) shield wall u Will allow for easier pit access to hall u More shielding needed for beam operations in MTA Hall

22 Alan Bross MUTAC April 9, 2008 MTA – Refrigerator Room

23 Alan Bross MUTAC April 9, 2008 Transfer Line System

24 Alan Bross MUTAC April 9, 2008 Valve Box Piping Transfer Line System

25 Alan Bross MUTAC April 9, 2008 Completed Valve Box

26 Alan Bross MUTAC April 9, 2008 MTA Beam Line as Installed Cooling ring dipoles “Green” quads Shielding blocks MW’s

27 Alan Bross MUTAC April 9, 2008 MTA Beam Line Group

28 Alan Bross MUTAC April 9, 2008 First Beam Experiments  Currently 5T magnet and 201 cavity on floor (below beam ht.)  We will raise equipment to beam height u Also flip orientation of 201 MHz cavity and magnet  Goal u First Beam Experiment (Muon’s Inc HP RF Test Cell) by end of 2008

29 Alan Bross MUTAC April 9, 2008 MTA Beam Commissioning  Beam Line commissioning to first beam stop (Linac side of shield wall) may start as early as June  Still doing radiation shielding assessments u Rerouting RF Power required s Final configuration for this still being developed  Will start at low intensity u Need Shielding upgrade (over-burden) for high-intensity

30 Alan Bross MUTAC April 9, 2008 Phase II - Configuration

31 Alan Bross MUTAC April 9, 2008 MuCool Plans for the Coming Year  805 MHz RF studies – Buttons (with and without B field) s Materials tests s Surface treatment (HP Wash + EP (from UK), ALD (Argonne) s E X B study  201 MHz RF u Continue B field studies u Working with Linac Group to improve operational efficiency  Begin thermal and mechanical tests on HIP LiH absorber prototypes  Complete MTA cryo infrastructure installation and commission system  Commission Beam Line  First tests with Beam Complete by January 09 (MCTF) u Test of Muons Inc. HP H 2 RF test cell with beam