THE CRISIS OF ACCOUNTABILITY AND THE WEST AFRICA GASPIPELINE PROJECT (WAGP) By Noble Wadzah At the 7th Annual Bank Conference on Development Economics.

Slides:



Advertisements
Similar presentations
THE GHANA POVERTY REDUCTION STRATEGY Integration and Progress of Environmental Issues By Winfred Nelson NDPC November
Advertisements

1 The role of NEPAD in improving quality and effectiveness of aid for Agricultural development Amadou Allahoury Diallo Senior Water Specialist NEPAD.
Disaster Risk Reduction and Governance. Ron Cadribo.
Food crisis and the International Assessment of Agriculture knowledge, Science and Technology for Development (SSA) Dr Simplice Davo VODOUHE PAN International.
1 African ICT Roadmap to Achieve NEPAD Objectives Arusha, Tanzania, 1-3 April 2003 Roles of Government and ATU in the Implementation of NEPAD ICT objectives.
Bank Group Engagement in Extractive Industries (EI) Presentation by Tove STRAUSS Governance Division (OSGE.1) African Development Bank Tunis, TUNISIA.
DFID Work on Extractive Industry Reforms in Africa
Monitoring and Evaluation in the CSO Sector in Ghana
INTERNATIONAL UNION FOR CONSERVATION OF NATURE. 2 Implemented in 12 countries of Africa, Asia, Latin America and the Middle East, through IUCN regional.
“Promoting Good Governance in the Extractive Industry Sector in Asia Pacific: A Value Chain Approach” Chandra Kirana Asia Pacific Regional Coordinator.
Hydropower Development: Experience of Nepal
Lobbying for Food Security: FAO advocacy interventions
Africa's Accelerated Industrial Development Action Plan “AIDA” AFRICAN UNION COMMISSION Department of Trade and Industry By Hussein Hassan Hussein Head.
Draft African Space Policy AMCOMET: 2 nd Task Force Meeting 26 May 2014.
Commercial Frameworks for Energy Investment Regional Issues and Cooperation Mahama Kappiah ECOWAS Commission May 2008.
June, 2003 Poverty and Climate Change Reducing the Vulnerability of the Poor through Adaptation Poverty and Climate Change Reducing the Vulnerability of.
Adegbulugbe A.O. - Energy Week March 2006 Gas Development in Nigeria: Prospects and Direction Professor Anthony O. Adegbulugbe Special Adviser to the President.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
MINING AND SUSTAINABLE DEVELOPMENT IN GHANA
Intergovernmental Forum on Mining/Minerals/Metals and Sustainable Development Andre Bourassa Secretariat of the Forum.
1 Strategic Approaches to Infrastructure and Development Pilot SEA Program at the World Bank PEP Meeting, Washington, DC November 19, 2007.
Assessment of World Bank and IFC Policies on Transparency for Extractive Industries George Holliday Europe and Central Asia Program Bank Information Center.
Electricity Reforms in Bangladesh
WORKSHOP COMMERCIAL FRAMEWORK FOR ENERGY INVESTMENT Abuja, 1 st & 2 nd May 2008 THE WEST AFRICAN GAS PIPELINE AUTHORITY-WAGPA A REGIONAL REGULATORY BODY.
Exploring the Route of Policy Framework: “CONTINENTAL OPTIONS”
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
IS THE ACCOUNTANCY PROFESSION READY?
Euei1. 2 Facilitation Workshop and Policy Dialogue Maputo April 2005 Enrico Strampelli European Commission DG Development.
Sustainable Development Challenge Fund: How did my project achieve the goals set out by the Challenge Fund? Integrating Gender Equity in Extractive Industries.
The Draft SADC Annex on Trade in Services UNCTAD Secretariat Sub-regional Conference on Improving Industrial Performance and Promoting Employment in SADC.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
A new start for the Lisbon Strategy Knowledge and innovation for growth.
Control Risks Group w w w. c r g. c o m CR G Managing Risks in Africa to Maximise Opportunity Matthew Durdy Director, EMEA Control Risks Group
Luc Hendrickx Sofia 20 February 2006 Successful representation of SMEs at EU level - best practices - TAIEX Workshop on Competitive Power © ueapme2006.
C ONFLICT AND E XTRACTIVE I NDUSTRIES Cindy Kroon Governance for Extractive Industries Program & Parliamentary Strengthening Program World Bank Institute.
TENTH AFRICAN OIL & GAS TRADE AND FINANCE CONFERENCE El Aurassi Hotel, Algiers 2-5 April 2006 Regional Energy Integration in Africa – An Input from WEC.
PARTNERSHIPS IN SUPPORT OF CAADP Progress Report Brief Progress Report AUC Page 1 of 14.
African Centre for Statistics United Nations Economic Commission for Africa Data for managing development Identifying gaps and setting priorities African.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
“Financial reporting plays a critical role in establishing and maintaining the confidence of the investing public. The objective of financial reporting.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
1 10th African Oil & Gas Trade & Finance Conference Algiers, Algeria 2-5 April 2006 Theodore Ahlers Director, Maghreb Department World Bank Middle East.
TOWARDS BETTER REGULATION: THE ROLE OF IMPACT ASSESSMENT COLIN KIRKPATRICK IMPACT ASSESSMENT RESEARCH CENTRE UNIVERSITY OF MANCHESTER, UK UNECE Symposium.
Bridging the Gap: The Role of the Private Sector in Climate Change Adaptation Richard Welford Chairman, CSR Asia Adaptation Knowledge Platform Learning.
Livable Delaware Energy Task Force - the Key to Energy and Environmental Co-Benefits.
The International Financial Institutions and Nam Theun 2 International Stakeholder Workshops Bangkok, Tokyo, Paris, Washington, Vientiane 31 August-24.
EXTRACTIVE INDUSTRIES AND PARLIAMENTARY OVERSIGHT: MAKING THE LINK Dr. Rasheed Draman.
Update on work of IUCN Council Private Sector Task Force Diana Shand Regional Councillor and Chair of Private Sector Task Force The International Union.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
DEVELOPING THE WORK PLAN
31 October The African Policing Civilian Oversight Forum (APCOF) is a network of state and civil society African practitioners active in policing.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
“DEVELOPMENT OF A NATIONAL ICT POLICY ICT Policy in the ECTEL Member States Mr. Donnie Defreitas MSc, (Hav.), ECTEL Caribbean Internet Forum Bay Gardens.
IW:LEARN TDA/SAP Training Course Module 1: Introduction to the TDA/SAP Process.
PRESENTATION BY BUSINGYE NELLY PROGRAMME OFFICER, AFRICA INSTITUTE FOR ENERGY GOVERNANCE 6TH NOVEMBER 2009 HOTEL AFRICANA A critical analysis of the relevance.
Science & Technology for National Progress in African Region: Highlights of Regional Strategy and Action Professor Gabriel B. Ogunmola, FAS President,
THE ROLE OF GOOD GOVERNANCE IN SUSTAINABLE DEVELOPMENT REGIONAL CONFERENCE ON LEADERSHIP, GOVERNANCE AND INTRGRITY AT KIGALI RWANDA BY PETER KIMEMIA NEPAD.
Kristīne Kozlova DG TREN, European Commission 2 April 2009 The Renewable energy directive: final agreement and next steps EUROPEAN COMMISSION.
BENEFITS OF COMPETITION REFORMS FOR CONSUMERS AND PRODUCERS IN DEVELOPING COUNTRIES (CREW Project) 18 TH – 19 TH NOVEMBER, BANGKOK Reflections on.
Engr. Olufemi Dosumu FNSE August, 2016
Access to Information, Participation in Decision-Making and Justice in the OECS: some thoughts Peter A. Murray OECS Secretariat.
Presentation by Alexis Floris Nkurunziza
Poverty and conservation
Estherine Lisinge Fotabong, Rudo Makunike and Mandivamba Rukuni
IMPROVING JSR PRACTICES AT COUNTRY LEVEL: ACHIEVEMENTS AND GAPS
Overview of Initiative
Momade Saide, Ministery of Planning & Development Hanoi, February 2007
BY HANNAH OWUSU-KORANTENG ASSOCIATE EXECUTIVE DIRECTOR, WACAM, GHANA
Presentation transcript:

THE CRISIS OF ACCOUNTABILITY AND THE WEST AFRICA GASPIPELINE PROJECT (WAGP) By Noble Wadzah At the 7th Annual Bank Conference on Development Economics (ABCDE), Amsterdam, May 23-24, 2005.

Introduction What is accountability? Accountability refers to positive steps and processes towards achieving task performance in a given situation. It necessarily represents the interests and voices of the powerless and vulnerable. Accountability promotes coordination and mutual self-respect.

What is the West African Gas Pipeline? (WAGP) It is a proposed 690 km long pipeline energy infrastructure project. It will transport natural gas from Nigeria to special consumers (industrial) in Benin, Togo and Ghana. It is being driven by a Chevron-led five member consortium and is supported by the World Bank (WB). The WAGP Treaty was created at an ECOWAS Summit in January 2000 by the Presidents of the four participating countries (Nigeria, Benin, Togo and Ghana).

Some reasons for the need for accountability mechanism in WAGP development 1 Moral and ethical considerations. Critical for human-centered development. Socio-economic and environmental integrity. To promote equitable profit and benefit sharing. It also generates confidence and stimulates local interest in development.

Some reasons for the need for accountability mechanism in WAGP development 2 WB and IFI-backed development projects are often associated with negative impacts on local people and environments. Conclusions drawn from the WB’s own studies show a link between the extractive industries and high poverty levels. To achieve the desired result of the WB’s push to accelerate economic growth in Africa. To achieve results from the WB’s stress on the need for ‘improved governance’ and ‘strengthened capacity’. It will fulfill the recommendations of the WB’s extractive industries review.

WAGP and the dispute over accountability 1 Though the WB and the private sector claim WAGP to be of benefit to the participating countries, the Ghana’s Energy Commission suggests the project will not be economically viable for Ghana. The Commission is of the view that there is no transparency because the deal is totally in the hands of Chevron-Texaco. Statements by some Parliamentarians in Ghana show that Ghana has not yet had the opportunity to review the Chevron-led proposed terms.

WAGP and the dispute over accountability 2 WAGP promoters have sidestepped the findings of Ghana’s Energy Commission. The WB representative has described WAGP as ‘a train that has left the station’ suggesting it is now too late to reopen debate on the economic viability of WAGP. The WB and the private sector undermine democratic institutions and weaken institutional mandates and policies.

WAGP and the dispute over accountability 3 The WB’s Project Appraisal Document (PAD) has stated the WAGP is not a significant project, exempting it from the application of transparency requirements. Gas commodity purchase and sales agreements will not be in the public domain. The WB’s response to civil society’s call for an Environmental Impact Assessment of the Escravos-Lagos pipeline area is uncertain.

The myth of WAGP and regional integration Ghana and Nigeria have a long-standing relationship particularly through NEPAD implementation. WAGP will draw resources from a conflict region. Unless the WAGP is committed to dealing with the conflict, there is concern it may undermine the relationship between Ghana and Nigeria. In dealing with this problem, WAGP will be promoting grassroots regional integration which is desirable. Ordinary citizens are the best promoters of regional integration (peasant trading and agriculture etc) and this should be encouraged by regional projects like WAGP rather than jeopardized.

WAGP ownership, regulation and accountability The company driving WAGP is the West African Gas Pipeline Company (WAPCO). WAPCO is registered in Bermuda as an offshore company. This raises serious regulation concerns for the participating countries. In Ghana, WAGP should be considered as a regulatory utility similar to the electricity company and must be subject to the country’s utility regulations and principles. It is uncertain whether the citizens of the four participating countries will be able to hold WAPCO accountable for any damage. The WB and the private sector have said WAGP will not be responsible for indirect impacts. WAGP will provide cheap energy for mining companies who are themselves already guilty of a lack of environmental and social accountability.

Gas flare It is unclear the extent to which WAGP will contribute to reducing gas flaring (of associated gas which is found in association with oil drilling) in Nigeria’s Delta Region. For WAGP to be accountable to its gas flaring commitments, it should collect 100 percent associated gas until this source is exhausted.

Community Resettlement The Community Resettlement Action Plan (RAP) is a crucial component of the EIA mandatory public hearing. The RAP was clearly missing in the EIA public hearing in Ghana and yet it was made available to the WB, resulting in the WB’s endorsement of WAGP. The RAP clearly missed public scrutiny and this raises accountability concerns.

Recommendations The WB and the private sector must further increase the space for public debate and scrutiny over project agreements, contracts and other documents, as well as the project’s economic viability. The community RAP must be redone with full participation of the public, particularly affected communities and the civil society organizations that represent their views. WAGP must provide measurable and detailed gas flare reduction commitments, timetables and targets, and show clearly it will collect 100 percent associated gas. WAGP must identify potential indirect impacts that will be associated with the project and must address those in case of any liability. Thank you for your attention