Gilsland Village Hall Refurbishment Project. Built in 1893 as a reading room for the village Large function room upstairs and smaller hall, kitchen and.

Slides:



Advertisements
Similar presentations
The Elite Sports Facility PUTTING SHEFFIELD BACK ON THE MAP.
Advertisements

Low Energy Victorian House Refurbishment 11 April 2008 This project aims to show how Victorian dwellings can be refurbished to address both heritage and.
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
The SunAirCool Eco Power Station
 Community Organisation owned & managed by the local community  Aims: ◦ Tackle local issues (economic / environmental / social / cultural) & improve.
Welcome to a world of expertise Renewable Heating Solutions Jamie Boyd Sales Manager - Renewables & Installed Heating Glen Dimplex Northern Ireland.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Insert logo here Effective Energy Management – Energy Mapping Seminar on Improving Environmental Performance and Reducing Costs in Business Paula Gallagher.
Sustainable Hotel Design Group 5 Presentation 4 Demand/Supply Matching.
Introduction The Village Hall Committee are made up of 9 members eight are trustees. Each Committee member has a role or is representing an organisation.
Futureview Solar Solutions Elysburg, Pa. Call
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Part of the BRE Trust BRE: Investigation into Longtown Heating Systems David Butler 9 October 2014.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Too hot, too cold, just right Presented by: Russell Smith.
Public meeting – February 17 th  Why are we doing this?  What is Green Energy Nayland?  The opportunity for investors  Questions.
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
Post Occupancy Evaluation of Sustainable Development Projects in the Education Sector Leanne McMillan, Senior Consultant, BRE Scotland.
Evidence on Tackling Hard to Treat Properties Prof. Sue Roaf, Heriot-Watt University Dr. Keith Baker, SISTech Ltd Andrew Peacock, Heriot-Watt University.
Www. MtEverestBiogasProject.org May, ,000 Kg of waste left by climbers each year Waste is hiked down to pits near Gorak Shep.
Sustainable Home and Lifestyle
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
Air and Ground Source Heat Pumps A presentation by Alan Westlake – Programme Manager (RHA) and Jeremy Pallant – Director Greensave.
Anouchka Poloubinski-Blandin Anastasija Krivonosova Anthony Baptista Luis Fernandes Plains-Wanderer N° 9.
Green Building Residential Construction
Sustainable long-term energy supply. When you look at the present time, you will see that energy problems are not only encountered in your own country.
National Trust energy approaches. –
Energy Saving Trust Ruth Wharton Regional Microgeneration Coordinator A non-profit organisation here to help people to save.
Utilizing Science & Technology and Innovation for Development Enabling a Smart Campus using Distributed Smart-Solar Marriott Hotel- Amman, August 12th,
Community Energy What is a community scheme ? Various options How our generation will change The community opportunity The Gwent Energy way Some of our.
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
Concerto Ethelred tower blocks - low carbon refurbishment Challenges and successes Jon Lissimore Environment Manager.
Oliver Fisher 8.6. Passive solar uses eaves to block and let in natural heat from the Sun. In summer the sun has a higher orbit so the angle of the rays.
HECA Strategy for Greenwich Council. Greenwich Council Overview No of Dwellings: (March 2004) (Tenure ratio: Council 27% Private Sector 73%) Council.
Abijah Minton and Anthony Triplin. How solar energy works Active Solar Energy is used to provide hot water by using energy from sunlight. Solar collectors.
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Abijah Minton and Anthony Triplin
Kim Hockley 1 TOTAL SA – ENERGY EFFICIENT STATION TOTAL 14 TH AVENUE.
Sustainable passive solar housing in Himalayas
Renewable sources of energy
Energy Efficient Heating for Churches Cooltouch Heaters Ltd.
CP Energy Ltd Working for a sustainable lining earth Applied Thermography.
Chelmsford Cathedral case study Cathedrals and Climate Change 2 nd November 2009 Daniel Kenning CEng CEnv Principal Environmental Consultant Harrison Group.
Geothermal Energy. How Is The Energy Converted Into A Usable Form Of Energy? After the water and how steam have been used, they are reinjected back into.
Active Solar heating Used for space and or water heating
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
10 Ways to Save Energy in the Home. 1. Shut the Curtains at Dusk Make sure that they don’t hang in front of the radiators or the outside wall will benefit.
INDEX Sr noTopic 1.Introduction 2.Advantages 3.Product Types 4.Thermal Insulating Materials 5.Applicatiion.
Planning Advisory Service Seminar 11 th March 2015, Leeds Renewable Energy.
ENERGY, PERFORMANCE & VALUE Dr Neil Blake, Head of EMEA Research & Rebecca Pearce, EMEA Head of Sustainability 30 th June 2015.
Using Heat Part 2. Science Journal Entry 32 Explain the advantages and disadvantages of thermal expansion.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
Sustainable Communities Fund Merger of 3 current funds: Sustainable Development Fund Sustainable Solutions Transport Fund Energy Advice Audits Avoid confusion.
Low Carbon Chilterns Cooperative Ltd Samantha Free 2 December 2015 COMMUNITY BULDINGS & ENERGY EFFICIENCY.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
Thinking about Energy Efficiency
R.N.S. INTERNATIONAL Heat Pumps
Carbon Management Journey
THERMAL LOADING OF BUILDINGS
bre Innovation Park Visitor Centre:
To engage businesses and organisations in the opportunities offered by installing biomass, heat pumps and solar panels to generate green energy To show.
Spaghetti Westerns Sustainability in the Public Sector
Crescent City Harbor District Solar Project Proposal
Bell work Predict whether leaving the refrigerator door open on a hot summer day will help to cool the kitchen.
Rose Drive Friends Church Solar Project Proposal
Park Encinitas HOA Solar Project Proposal
Sawbridgeworth Memorial Hall Trust AGM September 2016
Presentation transcript:

Gilsland Village Hall Refurbishment Project

Built in 1893 as a reading room for the village Large function room upstairs and smaller hall, kitchen and toilets downstairs Used as a venue for some village events but not used to its full potential Very cold Very expensive to heat Not very welcoming Often people would sit through an event without taking their hats and coats off!!

Wall mounted electric heaters

Very well used electricity coin meter!

Upstairs Hall before its refurbishment

Old style wall heaters

No insulation in the roof

Loss of Village Post Office – outreach service in village hall 3 times a week Loss of Village Shop Village Hall became more important for facilities, services and social inclusion Some improvements had taken place, including double glazing, improvements to kitchen Becoming obvious that some major refurbishment was needed

Change of committee New committee realised importance of developing the hall and making it more welcoming Poor thermal efficiency and inadequate heating arrangements

Working with Community Action Northumberland Village Hall Health Check Village Hall Energy Audit – Identified poor insulation (none) – Identified increased cost of electricity – more than doubled between 2008 and 2009 and likely to get worse

Working with Northumberland National Park Authority Needed to look at the feasibility of a programme of improvements Funding from NNPA enabled us to commission a renewable energy options appraisal Appointed architect and structural engineer

Proposed Energy Efficiency Measures Recommended by project architect:- Sheep’s wool insulation in the roof void Window reveals in large upstairs hall and smaller downstairs hall to be lined internally with high performance insulated plasterboard External walls of both halls to be lined internally with high performance insulated plasterboard Sloping portion of roof to be insulated with rigid foam and high performance insulated plasterboard New entrance lobby to be formed

Would involve other building work – electrical, re-plastering, internal decoration, new heating distribution system Calculated heat loss reduction of 70%

Options for Renewable Energies

Solar photo voltaics – 3kw system over the rear load bearing wall should generate around 2,344 kWh per annum with a cost benefit of around £1,200 through Feed In Tariff Clean Energy Cash Back would be a significant new income stream for the hall Air Source Heat Pump and Distribution System - remove electric wall heaters (using 37Kw) replace with single heat pump using 5.2Kw and modern distribution system

How an Air Source Heat Pump works Air source heat pumps absorb heat from the outside air, in the same way that a fridge extracts heat from its inside. It can get heat from the air even when the temperature is as low as -15° C. Heat pumps have some impact on the environment as they need electricity to run, but the heat they extract from the air is constantly being renewed naturally. Heat from the air is absorbed at low temperature into a fluid. This fluid then passes through a compressor where its temperature is increased, and transfers its higher temperature heat to the heating circuits of the hall.

FUNDING !!! Business Plan – Background – SWOT analysis – Project Proposal – Environmental Benefits – Social and Economic Benefits – Funding Strategy – Cash Flow – Support from the Community

Two Phase approach – Thermal measures, building costs etc. total £39,000 Renewable Energies – Solar PV panels, Air Source Heat Pump, Distribution System total £31,000 Project Management by Natural Regeneration Consultancy included Enabled us to target different funders for different parts of the project

Phase One – Northumberland Uplands LEADER Programme – funding thermal measures - £18,500 Phase two – Community Sustainable Energy Programme (CSEP) – renewable energies - £12,500 Total cost of £69,000 at this stage Identified additional major structural work required to roof costing £14,000 Total funding required – approx. £83,000

Made applications to 27 organisations Many different application processes Business plan, presentations, second applications, additional information, visits Supported by 18 organisations to obtain funding for the complete project Supported with money and help in kind Local fundraising / help in kind

The work begins!

The roof comes down

with 120 years of dirt!

New Structural Work

Kingspan to create the walls

Sheep's Wool Insulation

All electrics to be moved

Worked around the Post Office

Post Office carried on as normal

Walls take shape

Helpers from Carillion

Our new main hall

Helpers from the village

Non-slip staircase

Team from Carillion came to tea

Solar PV Panels were installed

Air source heat pump was installed

A new sign!

Other improvements too

Official opening by the Duchess of Northumberland

Benefits for Gilsland Warm, friendly venue for any village event Economically viable Lowered our carbon footprint More groups using the hall, therefore more services and activities available locally More income for the hall without increasing charges Secured the venue as the hub of the village for the future

Increased use of hall Previous groups – craft, WI, Whist Drive, Dominoes, occasional sport activities, PO, Gardening Club New groups – Youth Club, church, village coffee mornings, Rusty painters, Foot Clinic, Clog Dancers, Beauty and Nail session, Jewellery Valuer, Girl Guide weekend, outside organisations for meetings and training (LEADER, Wildlife Trust, WNBC), Fibre and Spinning Group, Birthday parties, Tea Dances, Gilsland Station, Gilsland Show, Exhibitions and Events, Summer Teas, Craft Fairs and more enquires A real centre for activities in the village and surrounding area

No More Hats and Coats!!