Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

I NDIANA S A GING AND P OTENTIALLY H AZARDOUS P IPELINE S AFETY I NFRASTRUCTURE M EDIA C ONFERENCE C ALL P RESENTED B Y : T HE H OOSIER E NVIRONMENTAL.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
Steve Irwin Public Outreach Coordinator. What is the Board’s role? Before any company can build a major utility facility, OPSB assures that it benefits.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
IRWA 2013 Federal Agency Update Bureau of Land Management (BLM) U.S. Forest Service (USFS) Energy Corridors & Rapid Response Team.
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct of 2005 Effect on Review of LNG Facilities & Working with FERC CSO Annual meeting.
Implementation of Pinyon-Juniper Woodland Treatment Elements of the BLM’s Ely RMP/EIS: Opportunities for Public-Private Partnerships to Secure Environmental.
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Transmission Corridor Working Group Nov , 2011.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
North American Power Group Western Mine-Mouth Coal-Fired Power Two Elk.
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
The Natural Gas Act & NEPA: How will FERC review the proposed Dominion pipeline? Greg Buppert, Southern Environmental Law Center.
Texas Pipeline Association
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
Project Management Principles Understand the business environment Choose the “right” project Understand the energy value chains Identify risks – “hard”
Plains Justice Environmental Justice for the Great Plains Paul Blackburn, J.D. Staff Attorney, Plains Justice 100 East Main Street Vermillion, SD
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Regulation of Pipelines
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Imported Liquified Natural Gas and its Role in Energy Independence Samuel Brown.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
Regulations Governing Siting of Electric Facilities in California AEP Orange County Chapter June 30, 2009 Christine McLeod, Project Manager - Regulatory.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
By: Ed Flippen, Partner, McGuireWoods LLP, and Lecturer at the University of Virginia School of Law and Duke University School of Law US Electric Deregulation.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
Overland Pass Pipeline. About Overland Pass Pipeline Approximately a 750-mile transmission pipeline Originates in Opal, WY and ends at Conway, KS Traverses.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Electric Transmission Lines and Utility Corridors.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
What do we mean by “Energy?
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
Providing Services to the Energy Industry Presentation By EPCM Consultants Pty Ltd EPCM Consultants Pty Ltd Comdain Group.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
LNG Permitting: You Want it When? Lauren H. O’Donnell Deputy Director, DG2E Office of Energy Projects.
Federal Energy Regulatory Commission Participation In Interstate Legal Processes Federal vs. State Authority August 10, 2005 Brazilia, Brazil.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
California Energy Action Plan July 17, Energy Action Plan Natural Gas Actions Status Report David Maul California Energy Commission Staff And Richard.
Delaware County Cooperative Extension May 17, 2012 Constitution Pipeline Project C onstitution Pipeline Company, LLC.
Comprehensive Energy and Environmental Reform S Energy Policy Modernization Act of 2016 February 18, 2016 Produced by: Ben Booker Edited by: Katharine.
South Dakota State Historic Preservation Office and the Nebraska National Forests and Grasslands July 24, 2013 National Grasslands Visitor Center.
North East Gas Interconnector Project Community and Business Roadshow July 2015.
Guide to Permitting Electric Transmission Lines in Wyoming Wyoming Renewable Energy Coordination Committee Presented to Western Governors Association October,
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Atlantic Coast Pipeline NCEDA MidWinter Conference March 9, 2016.
Atlantic Coast Pipeline Fayetteville Regional Association of Realtors March 15, 2016.
Energy, Agriculture and Policy Development Power for Today’s Agriculture and Rural Communities Dale Arnold, Director, Energy Development Ohio Farm Bureau.
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
Department of Energy Energy Agency Reorganization Plan Little Hoover Commission Hearing on Governor Schwarzenegger’s Plan to Establish a Department of.
Matthewson (Matt) Epuna Program and Project Supervisor
LNG Transportation and Storage
Overhaul of Combustion Turbines Under NSR Regulations
Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England.
SunZia Project Description
Dominion Investments in Virginia
May 7, 2018 John Katz Federal Energy Regulatory Commission
Project Overview.
2007 Lessons Learned & Solutions
Joshua B. Epel, Esq. Duke Energy Field Services, LP August 25, 2005
Presentation transcript:

Challenges in Transmission

2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG  Electric Transmission  Construction, Operation & Maintenance  Existing Oil & Gas Pipeline  Construction Compliance  Facility Compliance  Air Quality Monitoring

3 A Few of Our Clients

4  Feasibility Studies and Routing  GIS & Data Management  Permitting & Field Surveys  Public Affairs  Construction and Operational Compliance Client Services

5 Federal Agency Work  Primarily 3rd Party NEPA Reviews  Federal Energy Regulatory Commission  US Forest Service  Bureau of Land Management  California State Lands Commission

6  Zephyr Transmission Line Project o (500kV HVDC – Duke Energy, American Transmission Co.)  Skiffes Creek Transmission Line Project o (500/230kV – Dominion Virginia Power)  Blue Grass Pipeline Project o (1,100-mile liquids pipeline - Williams and Boardwalk Pipeline Partners) Some Recent or Current Projects

7 Barriers for Projects Requiring Federal Authorizations  Identification of NEPA lead (if needed)  Application may be needed to begin consultation  Interagency coordination during consultation  Long and uncertain regulatory schedule  Lower predictability  Higher project risk for meeting commercial targets  Higher project cost Siting and Permitting Large Interstate Projects

8  Coordinates Pre-Application Activities – proponent and agencies, tribes, and non-federal entities  Requires federal agencies to participate in pre- application consultations  Focuses on project siting (study corridors, routing) and public outreach process  Forces proponent to do its project planning  Identifies the NEPA lead agency  Sets the stage for faster NEPA review and greater project predictability DOE Integrated Inter-Agency Pre-Application (IIP) Process

9  Committing the agencies to a defined NEPA review schedule  Initiating NEPA review earlier FERC’s typical major pipeline EIS schedule months  Includes FERC’s pre-application process  Proponent planning and pre-application process overlaps NEPA review What IIP Does Not Address