Results and Implications of the First Forward Capacity Market Auction National Town Meeting on Demand Response June 3, 2008 Henry Yoshimura Director, Demand.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
National Grids Involvement in New Englands Forward Capacity Market Helping to Bring Demand Resources into the Supply Mix Tim Roughan Director, Distributed.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
ISO New England Demand Resource Measurement & Verification Standards Manual Overview April 11, 2007 NAESB Development of DSM/EE Business Practices Washington,
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Setting a New Course for Electricity in Ontario Presented to the WNA Annual Symposium by Milton Caplan 2004 September 8.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Update on Demand Resource Participation in New Englands Forward Capacity Market Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Highlights of the 2003 New York ISO State of the Market Report David B. Patton, Ph.D. Potomac Economics Independent Market Advisor April 14, 2004.
APRIL 9-10, 2013 MARKETS COMMITTEE Christopher Parent MARKET DEVELOPMENT | Creating a tiered Reserve.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.
Better Align Capacity Markets with Policy/Planning Objectives James Daly, VP Energy Supply Restructuring Roundtable Sept 21, 2012.
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
Wholesale Markets and How Efficiency Has Financial Value Dan Griffiths KEEA Energy Efficiency Conference September 21, 2010.
NOVEMBER 18, 2013 | WESTBOROUGH, MA Administrative Pricing Rules for Forward Capacity Auction #8.
AUGUST 7-9, 2013 | LENOX, MA Andrew Gillespie MARKET DEVELOPMENT (413) Review of Market Rule 1: Section.
Enhancing Capacity Markets to Improve Resource Performance and Investment Pay For Performance: New England’s Capacity Market OPSI 10 TH ANNUAL MEETING.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Resource Adequacy in PJM
The Benefits of Dynamic Pricing of Default Electricity Service Bernie Neenan UtiliPoint International Prepared for Assessing the Potential for Demand Response.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Plug-In Electric Vehicles… What has to happen on the other side of the outlet? MARC Conf. Session 4 – Electric Cars: Can we charge our way to a carbon-free.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Demand Resources: Challenges and New Initiatives for ISO New England Henry Yoshimura, ISO New England NEW DEMAND RESPONSE PRODUCTS IN ELECTRICITY MARKETS.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Distributed Generation/Demand Resources in ISO New England’s Wholesale Markets 2nd Annual Distributed Energy Conference - Building Resilient Communities.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Market Response to Winter Dupont Group Energy Summit New England Power Generators Association Carol J. Holahan, Esq. October 5, 2015.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
S PIEGEL & M C D IARMID New England’s Forward Capacity Market: How Did We Get Here and Where Are We Going? Scott H. Strauss APPA Legal Seminar Cambridge,
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Prepared by California Department of Water Resources May 31, 2001
Flexible Forward Contracts for Renewable Energy Generators
The Future of Demand Response in New England
Draft 2013 Energy-Efficiency Forecast
Benefits of New England’s Proposed Capacity Market
Marginal Cost Pricing: Why Is It Important? Have We Achieved It?
Market Design in New England
The First FCA: Observations & Thoughts
LICAP Settlement: Demand Resources
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Results and Implications of the First Forward Capacity Market Auction National Town Meeting on Demand Response June 3, 2008 Henry Yoshimura Director, Demand Resource Strategy ISO New England Inc.

2 Forward Capacity Market Procure enough capacity to meet New Englands forecasted Installed Capacity Requirement (ICR) three years in the future. Promote new investment by providing a long-term (up to 5 year) commitment to New Supply and Demand Resources. Allow new capacity projects to compete in the market and set the price: –Select a portfolio of Supply and Demand Resources through a competitive Forward Capacity Auction (FCA) process: Proposed resources must be pre-qualified to participate in the auction. Proposed resources must participate and clear in the auction to be paid for capacity. © 2008 ISO New England Inc.

3 Summary of FCA #1 The first FCA was held February 4-6, 2008 as scheduled: –39,155 MW of qualified new and existing demand- and supply- side resources competed. –Procurement met regional ICR (i.e., 32,305 MW) for Commitment Period. Capacity market clearing price –FCA starting price was $15.00/kW-mo. –FCA ending price was $4.50/kW-mo. Floor price negotiated as part of Settlement Agreement. Over 1,800 MW of new resources cleared the auction, including both Supply and Demand Resources. © 2008 ISO New England Inc.

4 New Resources Cleared in FCA-1: Markets Have Shown Demand Resources to be a Cost- Effective Resource Values represent MW and percent © 2008 ISO New England Inc.

5 Notes: RTDR = Real-Time Demand Response RTEG = Real-Time Emergency Generation. All RTEG is treated as existing resources in the auction. Use of RTEG resources to meet the Installed Capacity Requirement is limited to 600 MW – the 600 MW cap has not been applied on this table. 2,279 MW counting towards ICR = 2,554 MW less 275 MW of excess RTEG that cleared in FCA#1. FCA#1 Demand Resource Cleared MW by Measure Type and Load Zone – TOTAL (Existing and New) LOAD ZONE Distributed Generation Fossil Fuel Distributed Generation Renewable Energy Efficiency RTDR & Load ManagementRTEGTotal Cleared MW CT ME North East MA (NEMA) NH RI South East MA (SEMA) VT West/Central MA (WCMA) Grand Total © 2008 ISO New England Inc.

6 Observations FCM worked as designed. –Attracted significant investment in new resources while maintaining needed existing resources. –Allowed Demand Resources to compete with generation resources. Demand Resources are a significant and growing proportion of New Englands total capacity. –Almost twice as many New Demand Resources cleared (1,188 MW) compared to New Supply Resources (626 MW) in FCA #1. –Including Existing Demand Resources, a substantial amount of Demand Resource capacity cleared in FCA #1: 2,554 MW. –Interest in participating in FCA #2 among New Demand Resource projects continues to be substantial: 1,781 MW. FCA #2 to be held in Dec 08. © 2008 ISO New England Inc.

Challenges for the Future Demand Resources are now replacing a significant amount of Supply Resources. –Indicates that FCM was successful. More Demand Resources sooner than expected: The total of Demand Resources in FCA #1 and those showing interest in FCA#2 is over 4,200 MW –This would represent approximately 12% of ICR in the 2011/12 commitment period. –Active DR would represent approximately 9% of the ICR in the 2011/12 commitment period. The large amount of Active DR – i.e., Real-Time Demand Response – clearing in FCA #1 and expressing interest in FCA #2 raises operations and planning questions. 7 © 2008 ISO New England Inc.

Operable Capacity Analysis – Observation #1 As the quantity of Active DR increases, the dispatch frequency increases. 8 © 2008 ISO New England Inc.

Operable Capacity Analysis – Observation #2 Active DR Will Be needed during Off Peak months. –Increasing amounts of DR displace generation. –DR needed when generators are unavailable. © 2008 ISO New England Inc. 9

Operable Capacity Analysis – Observation #3 There Are Few Hours When 100% Of Active DR Is Needed. 10 © 2008 ISO New England Inc.

Operable Capacity Analysis – Observation #4 In Extreme Load Conditions, More Active DR Will Be Called Upon For More Hours. 11 Comparison of 50/50 and 90/10 Forecasts August 2011 (Intermediate Case) 50/50 Forecast90/10 Forecast # of Hours Load & Operating Reserve exceeds Available Generation 3986 Corresponding # of Days in August 89 Maximum # of Consecutive Days in August 55 Average MW that Load and Operating Reserve exceeds Available Generation 8352,843 Maximum MW that Load and Operating Reserve exceeds Available Generation 2,3844,504 © 2008 ISO New England Inc.

Next Steps As Active DR grows, the frequency of dispatch increases. –If the performance of Active DR diminishes in response to a higher frequency of dispatch, system reliability will diminish. –Active DR resources have not been tested under the FCM performance requirements and the frequency of dispatch expected in 2011/12. A strategy is needed to balance the goal of allowing Active DR to freely participate in the FCM with the risk that higher participation of Active DR in the FCM may impact system reliability. Continue stakeholder process to these issues. 12 © 2008 ISO New England Inc.