F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 JET-EP ITER-like ICRH Antenna - Technical Status Project Board 18 January 2005 11:00- 16:00 JET.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Progress of the BEPCII Injection System Kang Wen.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND A few very simple technical elements on the internal / external matching.
Industrial Studies of ILC Cavities & Component Production in the Americas IPAC 11 – Kyoto, Japan May 23, 2010 Science Projects Homeland Security Medical.
M Nightingale/A WaldenArc Detection Meeting - JET - 4 August 2005 ARC DETECTION FOR THE EP ANTENNA - THE OPERATOR’S PERSPECTIVE Mark Nightingale, Tony.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS1 Work program for Validation of External Matching for The ITER-ICRF System F. Durodié CCFW32, 25 July.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
TRACI V3 Status and material for discussion Feb 6 th 2014.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
39th Meeting of the Co-ordinating Committee on Fast Wave Heating and Current Drive Arc Detection Meeting - JET - 4th August 2005 Presented by M. Graham.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
F. Durodié4-Aug-2005JET-EP ITER-Like Antenna / CCFW39 / JET Review of the Status of the Arc Detection Issues and Proposals for the JET-EP ITER-like ICRH.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
1.3GHz Input Coupler for ILC
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
PASI OsC meeting 12th July 2012
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
Euratom TORE SUPRA  CEA comments on documents provided by the Project Leader Introduction I Performance issues II Operation Issues III. Manufacturing.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Garching,June 24 th, 2003F. Durodié LPP-ERM/KMS – CCFW Comments on the Report on Internal Matching for ITER Garching 24 June 2003.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
ITER ICRF R&D - ERM-KMS proposals P. Dumortier, F. Durodié, R. Koch, P. Lamalle, F. Louche, A. Messiaen, R. Weynants CCFW 37, Brussels, 22 November.
ELEC 401 MICROWAVE ELECTRONICS Microwave Networks - Parameters
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Ti/SS transitions A.Basti INFN-PISA*
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Complementary ISTC Projects #3888, 3889p
MICE Target Report Video Conference 29/11/07
LARP Phase II Secondary Collimator RC1
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Far Detector Activities Late 2017 – Early 2018
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-0 and RC-1
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Presentation transcript:

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 JET-EP ITER-like ICRH Antenna - Technical Status Project Board 18 January :00- 16:00 JET F. Durodié

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Capacitors Pressure Drop Measurements OK –Independent of capacitor position –Measurement l/min slightly below value assumed for the design of the cooling circuit (0.4bar)

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Capacitor (Art. 7 Contract) Final Capacitor modified from the CfT version –Changes due to choice of Actuator as well as Assembly issues –Impact on Art. 7 contract : below CfT capacitor resulting from R&D Thin the copper “rear part of the capacitor outer envelope” and reinforce with a stainless steel external cylinder Torsion lock mechanism for the rotation of the variable electrode to reduce stress in the internal bellows Stainless steel corona rings Re-enforced Ceramic to Cu-sleeves brazes Interface with inner-VTL : strong but off- axis pivot-points

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Final Capacitor Capacitor Design Evolution – Final Design –Relatively large impact on contract due to extra SS welding and associated QA. –Extra testing of bellows lifetime and OFHC Cu properties New interface with “Pivot-ring”-assembly allowing to rock on axis while strong enough to take the torque (tight tolerances) Strengthened Weld between capacitor body and water-chamber Extra bellows in order to obtain monitored vacuum interspace (containment tube and mechanical stop (grey) shown for information (not part of delivery)) Stainless Steel (blue) Water pipes with inconel (magenta) ends Modified water-chamber to allow welding of remaining pipe work during assembly using orbital welding tool Modified interface

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 RF Measurements of the (vacuum) 8x8 Antenna Scattering Matrix [10/06/2005] –Adaptors (x8) – Final drawings done –Contact rings (x16) – Final drawings done Calibration of RF Capacitor Voltage Probes [10/06/2005] –Adaptor (x1) – Final drawings done –Contact ring (x2) – Final drawings done –Support for inner conductor of adaptor (x1) – Final drawing to be processed –Dummy capacitor (x1) – procurement phase –Supports for dummy capacitor (2x1) – Final drawing to be processed High Voltage Test (each RDL powered in turn) –Short circuits (x3) – Final drawings done TCDI for these three topics will be submitted when all final drawings are ready “Loading” the antenna (RF characterization and Matching studies) [24/06/2005] –Salty water tank (x1) – detailed design in progress –Support structure for water tank (x1) – detailed design in progress RF Characterisation of the APTL and simultaneous matching of all RDLs [24/06/2005] –Low power service stubs (x4): inner and outer conductors, supports, flange –Impedance transition (x4) –T-junction/feeding (x4) Detailed design in progress RF Electronics [8 week delivery] –Tests of 75dB amplifiers ongoing : noisy -> 60dB -> need to operate at 5W (4 x 1W). Testbed Equipment - status

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Miscellaneous Items VCW –Test of Brazed Joint successful up to 150% of requested mechanical loads Seesaw and Pivot Ring –Comments back from TCD-I –Aim at launching CfT end of January Inner VTL –Capacitor Cooling Pipes Stress Analysis done by ENEA : No problems apparent Needs to be transferred to Mecagest after final config control –Lifting tools : (small) Modifications required HPP –Successful casting of straps –Operation to restart 2 nd half of February –(report by Rick Goulding) Ex-Vessel Support –Testing of Spring Dampers has started –Top Assembly Jack Issue Antenna In-vessel Components –Redesigned water chamber and Strap Cooling Pipe expansion boxes

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Actuators – Pressure Vessels Operating and Failure conditions were agreed with the Operator in order to perform a 3 rd party design validation Drawings were finalized and Call for Tenders launched for Actuators, Pressure Vessel Parts and Pipe Spools. –Actuator : minor technical comments returned : drawings are corrected –Pressure Vessel Parts : Front and back flanges with pipe penetrations require the use of inclusion tested material The present design favors extra material and machining above welding the pipes on the front/back flange It is feared that this may impact substantially on cost and delivery time Project team are assessing the consequences of welding the pipe penetrations on the flanges Tender is on hold until welding issues are clear and instruct tenderers accordingly The positions sensor is not available as a standard catalogue item from Penny & Giles any longer : –however all tooling to produce position sensors is still available –Penny & Giles have agreed to produce a batch of position sensors Drawings of Drive-Rods available for review

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Assembly Detailed preparation of the Assembly is on-going –ICM : Robert Warren –On Site Assembly/Welding of the Actuator is a New Requirement since last PB Quickest and Closest monitoring of QA aspects -> minimization of impact on cost and time Plan is not yet updated ! (8 weeks assumed) –Welder Qualifications / Training –PPS’s –Connection with APTL Piping / Swagelocks Final layout + 14° bend : starting this weeks –Several Jigs need to be designed in support of the Welding activities for Inner-VTL + Actuator Pressure Vessels Assembly –Planning of Break-in/Function tests for the Actuator are required.

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Conclusions The Design phase for the antenna components is completed and the components are well into their manufacturing phases –Exceptions : Actuator related packages, Capacitors, RF Probes, See Saw / Pivot Ring Manufacturing phase of various components still return questions from manufactures that need attention form the project team and in some case may require (minor) redesign : –AIC : Water-chamber, Strap Cooling Pipe expansion boxes –EXS : Top (Assembly) Jack, Lifting Frame –VTL : Lifting Tools, Assembly Jigs. The follow-up of the procurements as well as the preparation of the Assembly and Testbed phase of the antenna are presently becoming the main focus of the project team The full/detailed impact of the Assembly in the planning is still outstanding.

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Status Matching and Arc Detection Studies Simulation of a/the Matching Algorithm is mainly done using a Matlab- Simulink tool developed by ERM in which the outcome of a more theoretical analysis is tested/tried. –Matching of 8 independent capacitors of 4 cross-coupled RDLs proved to be a very difficult mathematical problem : Complicated topology of “matching” surfaces + the human brain is not well suited to think in an 8- dimensional space [ref Ringberg April 2004, SOFT September 2004]. Mathematical analysis of single RDL with cross-coupled straps revealed some insight in the “knobs” to be used : matching to a complex impedance at the conjugate-T junction. At present the Matching Algorithm is making use of the toroidal symmetry : 4 capacitors of one toroidal half are “slaved” to the 4 capacitors of the other half. –To be investigated / quantified : symmetry assumptions. –The antenna impedance matrix is obtained from MWS modelling of the antenna array in front of a “plasma-like” dielectric. Up to now only one matrix was used : H-mode and ELMs are simulated by scaling Real and Imaginary parts of the Impedance matrix “appropriately”. Outstanding : interpolation from different matrices for different positions of the “plasma-like” dielectric. –There are many settings possible (phases, Z ref, g ref ) : only a brief exploration is available, no real optimisation was tried yet.

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching Simulations No feedback during ELMs

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching Simulations

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching Simulation

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching Simulations Drift of capacitors during ELMs

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching Simulations - Overview

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching Simulations - Overview Below 35 MHz matching to a Zref with a small inductive part is not possible due to limitations in the 2 nd stage matching (phase-shifter).

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Arc Simulation Arcs are simulated by putting a small inductance (20 nH) in the circuit at the arc location Arc locations shown for RDL P. Similar locations for RDL Q.

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Arc Simulation Preliminary results ! –Example : TS type of Arc at conj-T on RDL P –! Very modest variations of the VSWRs ! The VSWR of the line with the arc is almost not changed ! (OK ?) –If confirmed : clever arc detection schemes are required based on symmetry Voltage and phase relationships for normal conditions … Next meeting foreseen on 27/1 (tbc)

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Matching and Arc Simulation Conclusions “Master-Slave” algorithm seems to work across the frequency band, however : – There may be no operation below 35 MHz at an appropriate complex matching impedance –Non-idealities have not been introduced/quantified yet. It may be possible to split the matching approach in two parts : “far away” from the match -> master-slave “closer” to the match -> 8 independent capacitor control –The feedback signals were derived from “perfect knowledge” of the RF quantities involved in the circuit analysis –More realistic impedance variations are still outstanding (MWS Modelling) Arc Detection : the analysis tool is just about ready –Only the “TS-like” arc has been reported so far and the results are not really understood –If confirmed it is likely that arc detection based on VSWR will not be sufficient Much more work and analysis needed –Algorithm : Optimization in the spaces of {Phases, Z ref (top, bottom), g ref } –Arcs : Catalog of reference Arcs and arcing conditions (matched, off match, elms …) –Algorithm (& Arc) : work from real signals including non-idealities

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1

F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 Testbed equipment - status “Loading the antenna” Scattering Matrix + Probe Calibration High Voltage Test Matching all RDLs Conceptual design Done Detailed designIn progressDone In progress Drawings statusConceptualFinal Conceptual Cost estimate (1) 22 kEUR14 kEUR4 kEUR + 15 kEUR (2) Planned delivery date 24/06/200510/06/ /06/2005 (1)Subject to changes after detailed design and special requests (safety, waste,…) Transport not included (2)If transmission line elements not “on loan”