GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents Activities of the GCU Bureau Report of the GCU Trustee to the BEWAG GAM 24 January 2011 Namur
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents 3 2 GCU Bureau Organisation GCU Bureau Signatories Management Contract Management GCU Projects 1 1 “Trustee”
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU – Some data Status in January signatories (still without exclusion !!) = 390 K RUK RU registered wagons in the data base ( to compare to +/ initially declared) Still 170 K missing ( = +/ wagons) Still 55 RUK missing ( = +/ wagons) +/- 55 new entrants / year Still 95 signatories not having paid their 2009 contribution Still 140 signatories not having paid their 2010 contribution Annual contribution = fixed term (114€) + variable term (0,102€/w)
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU Signatories management OPTING IN SESSIONS October 1st & January 1 st OCTOBER 1st RU – DE – TRIANGULA Logistik GmbH / DE – Stauden-Verkehrs GmbH / DE – ELBA Logistik GmbH / DK – CFL Cargo Denmark ApS / FR – On Site Rail France SARL / NL – Rurtalbahn Benelux BV RUK – DE – DB Fehrndienste – 2w RUK – DE – ODIN Logistics AG – 35 w RUK – DE – Bocholter Eisenbahn GmbH K – DE – Hartung Bau – 15 w K – CH – railCare – 58 w K – AT – PROPANGAS AG – 60 w JANUARY 1 st RU – DE – IGB / NL- CRS / NL – HSL Logistik BV / TX Logistik AG filiale Italia RUK – SE – Rail Care Täg – 83w RUK – DE – Schwerbau – 27 w RUK – DE – Integro RUK – TR – Transtur K – DE – B&V Leipzig – 254 w K – DE – Dillinger Hütte – 12 w K – DE – Rogesa – 26 w K – DE – Thyssen Krupp – 24 w K – DE – ZAS – 70 w K – SE – Profit Exim (Express Slovakia) – 178 w
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU Signatories management PERMANENT ADMINISTRATIVE CONTACT WITH THE SIGNATORIES Continuous company data modifications (economic situation ??) Many changes of administrative data in relation with the 2010 call of contribution (lack of discipline to inform GCU Bureau) Permanent but variable loss of contact with +/- 40 signatories Active follow-up of un-payment 2009 and 2010 (see further) Low and stable level of signatories questions of interpretation Exclusion Problematic F(2009 contribution un-payment) F(2010 contribution un-payment) F(wagon data base obligation and interest)
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU Signatories management MAIN ACTIONS SINCE MID 2010 June 30 – Notification (mail + Web site) app. 8 (wagon db) amendment adoption July – With IT provider,wagon db test phase (see further) July – Active follow up of 2009 and 2010 payments July 20 – Follow up applications migration > Belgacom new Net Center July 29 – Amend. proposal (mail + Web site) app.10 (new annex 3 + …)EVIC August 5 – mail introducing the wagon db and test phase (see further) August 18 – Web site information on the ECM recommendation guide August – Active follow up of wagon db test phase and 2010 payments September – Active follow up 2009 and 2010 payments September 24 – 2 nd mailing announcing the wagon db “official” uploading phase October 1 – Mandatory date limit for the wagon db uploading – check up October – Fine and tight follow up of every signatory with their wagon fleet uploading (weekly report) November 1 > EVIC amendment adoption without unanimity Use of GCU for the structured information exchange (K, ECM, VKM, ….)
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU Signatories management SUMMARISED DATA IN 2010 01/ 01 – 630 signatories – wagons (declared) 01/ 04 – 643 signatories – wagons (declared) 24/ 06 – 618 signatories – wagons (declared) – Joint Committee 05/ 08 – 624 signatories – wagons (uploaded) – Start test period 24/ 09 – 634 signatories – wagons (uploaded) – End of test period 27/ 09 – 634 signatories – wagons (real time counting) – Start uploading 01/ 10 – 634 signatories – wagons (uploaded) – Mandatory date 01/ 11 – 646 signatories – wagons (uploaded) – One month later 09/ 11 – 646 signatories – wagons (uploaded) – Joint Committee 01/ 12 – 646 signatories – wagons (uploaded) – Two months later 01/ 01 – 660 signatories – wagons (uploaded) – Three months later 01/ 23 – 660 signatories
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU Signatories management DEVELOPMENT FOR THE SIGNATORIES IT tool for their detailed administrative data self-updating Invitation December 1 to fill the Web sheet in their CRM company screen The Web sheet has exactly the same content as the company downloadable pdf in the Web site list of signatories The pdf will be replaced by a HTML sheet as from February 1 Careful, the signatory has to fill his Web sheet !! Each data change by a signatory in his Web tag sheet will be automatically reflected in the new HTML sheet (replacing the static pdf) on the Web site list of signatories GCU Bureau and its IT provider will stay in support (helpdesk) Updating and improvement of the Web site Contract, home page updating List of signatories Exchange platform project To investigate and develop
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents GCU Contract management Appendix 8 amendment (wagon data base) June 30 – notification (mail + Web site) of appendix 8 amendment adoption October 1 – Entry into force of the wagon database Appendix 10 amendment (EVIC) July 29 – Amendment proposal (mail + Web site) of appendix 10 (new annex 3 + complement in part A corrective maintenance Remarks and comments from Slovak signatories November 1 non unanimous adoption > Entry into force on May 1
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents Projects of the GCU Bureau New Website CRM tool GCU Bureau Wagon database running Starting “Trustee” All 3 IT applications are designed in an ‘open source’ environment and linked via their hosting on a single ‘GCU server’ Our 4 applications (the 3 + the mail server) are since July 20 hosted in a BELGACOM (national IT provider) Net centre with improved and high level security standards
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents Wagon data base status Planning August, September – Test period September 27 – Starting uploading phase October 1 – Starting « official » use Test period Only 70 keepers (on 510!) imported wagons Uploading period (from September 27 to 30) Start operation (mandatory date October 1) With wagons from 115 keepers Continuous uploading 4 weeks later (October 29), wagons registered from 175 keepers Today, wagons from 305 keepers See joint notes (summary, user’s notes, lists & tables)
GCU Bureau Ir Pierre TONON Av Louise 500, B-1050 Brussels T.: F.: M: E.: W.: ENFRDE Contents Presentation of the GCU Bureau Any questions, comments ? Any questions, comments ? Q ?