District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality.

Slides:



Advertisements
Similar presentations
Project Background and Objectives
Advertisements

Capital Improvement Program City of Snoqualmie Public Works Department.
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
THE DISTRICT’S ANACOSTIA RIVER TRASH TMDL IMPLEMENTATION STRATEGY
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
1 Municipal Separate Storm Sewer System (MS4) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Management Storm Water Administration.
District of Columbia Stormwater Fees October 27, 2008 Apartment and Office Building Association of Metropolitan Washington Brendan Shane DDOE Office of.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Wekiwa Springs Septic Tank Retrofit – Project Update Utilities Department March 10,
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
Coastal Smart Growth s/index.htmhttp:// s/index.htm
NYC Green Infrastructure Program
Central Lutheran Church & Mississippi Watershed Management Organization Central Cares for Creation (C3) Ministry Team Fiscal and Property Committee Ron.
Green City, Clean Waters: Philadelphia Green Schoolyards
Presenter: Karen Fligger, EPA. Stormwater Generated by runoff from land and impervious surfaces such as paved streets, parking lots, and building rooftops.
District Department of the Environment st Street N.E Grants Day Presentation Tuesday April 21, 2015 Compton E. Douglas Grants Specialist
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Rainwater is Good: Designing Stormwater Management to Work for YOU A presentation by Jennifer Fais STC and the Upper Susquehanna Coalition April 8, 2004.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Discussion of Proposed MS4 Permit Design Standards Language.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
Updated Estimates of Impervious Area, Equivalent Residential Units, IA Rate, and Customer Bill Impacts AOBA October 27, 2008.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
Houston Land/Water Sustainability Forum David W. Peters, P.E., CFM, D.WRE February 6, 2008.
1 Water-Protective Land Use: Barriers, Benefits and Opportunities Cynthia Peterson April 7, 2009 Water-Protective Land Use: Barriers, Benefits and Opportunities.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
Local Plans, Regulations, or Policies Supporting Green Infrastructure City and County of Honolulu Department of Facility Maintenance – Storm Water Quality.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Fixing Our City’s Old Sewers How the state is helping In early 2015, New Jersey issued new permits to the 25 communities and sewage treatment plants that.
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Helping To Create An Active, World-class Public Waterfront For All People Citizens Advisory Committee February 17, 2016.
Comprehensive Thinking and Planning
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Storm Water Management at MSU Ruth Kline-Robach Michigan State University Institute of Water Research Dept. of CARRS.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Comprehensive Sewer Planning Update Meeting M. Chris Swartz, Village Manager Mustafa Emir, Village Engineer March 23, 2015.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
TMDL Implementation: Now What?
Update on PI Modeling and Nitrogen Removal at Blue Plains
Comprehensive Sewer Planning Update Meeting
Local Government Engagement and Communication Strategy
Find things on the map.
Total Maximum Daily Load Program
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
City of Forest Lake MS4 Program
Natural Environment: 0% Impervious Surface Built Environment:
11/21/2018.
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
Space Coast TPO State Road (S.R.) 528 Update
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

District of Columbia Water and Sewer Authority Fort Stanton (CSO 006) Separation Project - Status and Coordination Update - for the Environmental Quality and Operations Committee Meeting REVISED May 20, 2004

Presentation Overview Project Description Coordination / Planning Lead Service Replacements Separation CIP Costs Separation CIP Schedule Current Status

CSO-006 Separation Study Area N Source: NOT TO SCALE CSO-006 Separation Study Area (Approximate)

Anacostia CSO-006 Separation Separation of 13.5 acre CSO area on east side of Anacostia (CSO- 006) CSO outfall converted to storm water outfall New storm sewer planned (some new sanitary sewer needed) Reduction/control of stormwater would benefit water quality LID is possible technique Engineering study complete

Extent of Current Development in CSO-006 Area

Typical Combined Sewer Connection in CSO 006 Area

Separation Plan in CSO 006 Area (Est. Cost = $3,900/private property) New Storm Sewer Connection New Storm Sewer in Street Roof Leader Disconnected and Rain Barrel (LID) Used* *No Extension on Private Property Required (May Result in 10-50% savings). Disconnects Combined Sewer Converted to Sanitary Sewer

CSO LID Option Summary OptionsConsiderations Constructed wetland National Park Service acceptance Land availability Initial cost Responsibility for long term O & M Water Quality Catch Basins Cost Public Disruption Biofiltration and Porous Pavers Cost Public Disruption Long term O&M Considerations Rain Barrels at Downspouts Public interest Work required on private property Support of community Long term success

Constructed Wetland Specifically considered for Anacostia CSO-006 separation Treats and infiltrates stormwater Handles smaller flows Mix of treatment and infiltration Larger flows go to receiving water I-295 Anacostia River Constructed Wetland CSO converted to storm water outfall NPS Property NOT TO SCALE N

Bioretention/Filtration

Paired biofiltration unit and catch basin Allows retention and filtration Improves streetscape Street Low flows High Flows Catch Basin Biofiltration Unit Filterra TM unit courtesy of Americast Bioretention/Filtration

Water Quality Catch Basins Allows settling/treatment of storm water Typical Triple Water Quality Catch Basin Outlet Oil/Grease/ Floatables Solids/Grit Water Line

Rain Barrels at Downspouts Captures and holds rain for beneficial use Water conservation as well as storm water reduction benefit

Coordinated WASA Activities Lead Service Replacements and Other Improvements to the Water System Combined Sewer Overflow (CSO-006) Separation Project

Lead Services in/around CSO 006 Area

Approximate Number of Street Lead Services MLK Avenue, SE 9 U Street, SE 21 V Street, SE 20 Lead Service Replacements in CSO 006 Separation Area *Total Est. Cost: 50 Services x $10,000/service = $500,000 **Est. Cost does Not include Paving or Work on Private Property Total Estimated Cost* $500,000** Total Estimated Cost* $500,000**

Construction Planned to Start in Fall 2005 Construction Planned to Start in Fall 2005 Ongoing Lead Service Replacements Completed During This Time Ongoing Lead Service Replacements Completed During This Time Priority Lead Service Replacements Will Be Completed Earlier Priority Lead Service Replacements Will Be Completed Earlier Lead Service Replacements in CSO 006 Separation Area

Planning with Others Trans~forming Anacostia Partnership Working with Multiple Groups Anacostia / Fort Stanton Community & ANCs DC Office of Planning DC Dept of Health DC Dept of Transportation National Park Service Anacostia Watershed Society LID Center Community Groups and ANC’s Planning public meetings in Summer 2004

Current CIP Budget 1 Notes: 1. Current CIP Costs are for CSO 006 Separation Project Only (i.e., lead service replacement cost NOT included), and are partially funded with an EPA SAP Grant. Project Item Budgeted Cost ($ in millionss) Engineering Study / Outreach0.123 Design Services / Outreach0.270 Construction Management0.300 Construction Services2.807 Total Budgeted Cost$3.5 M

Item FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Engineering Study / Outreach Design Services / Outreach Construction Period 1 Beneficial Occupancy Current Schedule Notes: 1. May vary, dependent on coordination with other groups and DC Agencies (i.e., DDOT).

Alternatives Considered Alt. 1 – Use of 8 “Filterra” biofiltration tree boxes w/ CSO Separation Plan Alt. 2 - Use of 12 “Filterra” Biofiltration Tree Boxes and Inline Trash Netting along SW Outfall w/ CSO Separation Plan Alt. 3 – Use of 23 “Filterra” biofiltration tree boxes and 23 DDOH-approved Water Quality Catch Basins w/ CSO Separation Plan Alt. 4 - Use of 23 DDOH-approved Water Quality Catch Basins (WASA option if DDOT does not sign MOA for tree box O&M) w/ CSO Separation Plan

Alternatives - Cost Comparison

LID Grant Option LID grants would be provided to homeowners for disconnection of roof leaders for onsite infiltration Funding for onsite design of rain barrels, rain gardens, and porous pavers Plumbing permit required through DCRA, and program administered by Environmental Stakeholder (e.g., AWS)

Current Status Final CSO 006 Separation Study Submitted Recommended Alternative 3 - Use of 23 “Filterra” biofiltration tree boxes and 23 DDOH-approved Water Quality Catch Basins w/ CSO Separation Plan (Alt. 3 Layout – Last Slide) Grant Concept Approved for Implementation of LID Controls by Environmental Stakeholder Group Meetings Scheduled with Stakeholders and Coordinating with Public / ANCs

CSO-006 Separation Study – Alternative 3