ISO TC 184/SC4 1/12 Opening Plenary: QC Report Thomas L. Warren Technical Writing Program Ok.State U.

Slides:



Advertisements
Similar presentations
IOTAP Software Build Process Author: Aman Choudhary Draft Version – Work In Progress.
Advertisements

Usage Record: Response to Public Comments Presented by Laura McGinnis at GGF17 May 11, 2006 Tokyo, Japan.
C O P Y R I G H T E U R O S T E P G R O U P Changes to ISO Rob Bodington, Phil Spiby.
Writing as a Team Nicole Lindsay Bachelor of Commerce Quarter 2 January 2006.
International Standards for Software & Systems Documentation Ralph E. Robinson R 2 Innovations.
ISO TC 184/SC San Francisco Opening plenary1 ISO TC184/SC4-SC5 JWG8 N249 SAN FRANCISCO OPENPLENARY.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
DEX Publication Project OASIS PLCS TC Telecon 29 April 2008 Trine Hansen.
Doc.: IEEE /1091r4 Submission May 2015 TGaj Editor Report for CC20 Jiamin Chen, HuaweiSlide 1 Date: Author:
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
CDIO Initiative Project Meeting #15 Location: University of Pretoria, Engineering Tower Building, Pretoria, South Africa February 16-18, 2005.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
ISO TC 184/SC4 ISO TC184/SC4/WG12 N937 SC4 Opening Plenary WG12 Report San Francisco, CA, USA TC184/SC4/WG Meeting 2001/06/11 Greg A. Paul WG12 Convener.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
Project Status Report Presenter Name Presentation Date.
CTI STIX SC Monthly Meeting August 19, 2015.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
ISO edition 2 Publication plan R. Bodington Eurostep Limited ISO edition 2.
Doc.: IEEE /295r0 Submission July 2001 Allen D. Heberling, XtremeSpectrumSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
1Technical Editing BPS/TC 67/Washington June International Organization for Standardization.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
- Sponsored by UK MOD ISO edition 2 Rob Bodington, Phil Spiby.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Learning Objects Metadata IEEE P Learning Technology Standards Committee London, UK March 16, 2000 Chair: Wayne Hodgins.
Progress report for ISO/IEC DTR Metadata Mapping Procedure(MMP) October, 2012 Tae-Sul Seo and Sung-Joon Lim 1.
WG9 Report ISO/TC211 Plenary Meeting Montreal, Canada
GIAN – Migrations Workshop Madrid, September 2012.
SEDRIS Editor’s Report Dick Puk ISO/IEC SC24 SEDRIS Editor WG8 Meeting, October 1, 1999 ISO/IEC JTC1/SC24 N5.
Serving society Stimulating innovation Supporting legislation Update of Discovery MS MD Schemas and Tools – MIWP-8 Tim Duffy, James.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
File: /ram/wgchairs.sxi Date: 7 January, 2016 Slide 1 Process and Tools (PROTO) Team General Area Meeting IETF59, Seoul, Korea -- March 2004
Bluetooth™-IEEE Working Group and IEEE P Working Group for WPANs Liaison Meeting Ian Gifford P Vice Chairman December 8, 1999.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Doc.: IEEE /197R3 Submission July 2003 Terry Cole, AMDSlide WG Technical Editor’s Report Opening Session, July 2003 Plenary Meeting Terry.
CIMI Glossary Overview. Charter To define terms and abbreviations that are used in communication relating to CIMI and which may not be commonly understood,
Doc.: IEEE /1442r2 Submission December 2012 Marc Emmelmann, Fraunhofer FOKUSSlide 1 TGai Draft Review Overview Date: Authors:
BTT presentation to SG-6, Osaka, Japan, March Browse Task Team Progress to date, future plan 6th SG Meeting, Osaka Osamu Ochiai (NASDA) Browse Task.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
ISO TC 184/SC4 ISO TC184/SC4/WG3 San Francisco N T24 - Schedule (1/4) Monday Afternoon - Joint meeting with SC1/Wg7 and Manufacturing Task.
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
® Sponsored by Architecture DWG 98th OGC Technical Committee Washington, DC USA Carl Reed, Joan Maso 10 March 2016 Copyright © 2016 Open Geospatial Consortium.
MIWG-8 Update TG Metadata Michael Östling Status Rome.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
IAF TC Report to PAC TC Summary of progress (June 2017)
GCOS IP and Update on CEOS Response
ECMA-328 2nd edition Invitation for open review
IEEE SA IEEE LTSC.
WG Technical Editor’s Report
WG Technical Editor’s Report
Emergency Management Technical Committee
WG Technical Editor’s Report
Presented to the CEOS WGISS October 22, 2018
WG Technical Editor’s Report
Rob Bodington, Phil Spiby
WG Technical Editor’s Report
November 2008 Closing Report
FFIoT Status Report – IEEE 802 Nendica
FFIoT Status Report – IEEE 802 Nendica
Presentation transcript:

ISO TC 184/SC4 1/12 Opening Plenary: QC Report Thomas L. Warren Technical Writing Program Ok.State U.

ISO TC 184/SC4 2/12 Overview Pre-meeting activities Quality Review Developers and editors workshop Plans for week Progress since Funchal Workshop in Stillwater Status of QC documents and tasks

ISO TC 184/SC4 3/12 Major News Supplementary Directives are done Several comments received Be on SOLIS after this meeting (QC N200) 4-weeks from end of SF meeting for comments Revise document and publish Projects shall use new version immediately

ISO TC 184/SC4 4/12 Pre-Meeting Activities Quality Review Discussed SDs and decided on plan for making them available Discussed issue of Abstract Test Suites Guidelines and the problem with getting the 2 nd edition issues resolved and document published HTML Guidelines—further discussion Tuesday Need comments on Test Cases from conveners and all project leaders. Details Friday. Issues with materials available on SOLIS

ISO TC 184/SC4 5/12 Workshop Changes in ISO Directives and Supplementary Directives Drafting of standards—user analysis; effective writing and editing Slides available on conference computer (QC N202)

ISO TC 184/SC4 6/12 Meetings this Week MEETINGDAY/TIMETOPICS Opening PlenaryM/10.30-noonReview of documents/tasks Joint meeting with WG3Tu/ Using HTML/ XML for standards Mapping table guidelinesW/ Final review of Guidelines Closing plenaryTh/ Review week; SC4 resolutions; Future plans

ISO TC 184/SC4 7/12 Progress since Funchal Workshop in Stillwater—Reviewed and revised Supplementary Directives All checklists Comments forwarded Draft of Test Case Guidelines

ISO TC 184/SC4 8/12 Status of Documents and Tasks DOCUMENT/TASKSTATUS Supplementary Directives New version ready for use: QC N200 (After SF) Mapping Table Guidelines Final workshop Wednesday Test Case Guidelines Draft completed and reviewed. Being revised.

ISO TC 184/SC4 9/12 Status of Documents and Tasks, cont. DOCUMENT/TASKSTATUS ChecklistsReconciled with revisions to SDs: QC N193, 194, 195 Drafting a StandardNew document to aid teams in writing drafts. In draft stage.

ISO TC 184/SC4 10/12 Projects Stalled ATS Guidelines AP Guidelines AIC Guidelines AIM Guideline Tools Listing Summary of Research on Typography Training Program Description Any volunteers to take over any of these projects?

ISO TC 184/SC4 11/12 Projects that are “Dead” Interpretation Guidelines Integration Guidelines

ISO TC 184/SC4 12/12 Questions