Hydrology Rainfall - Runoff Modeling (II) Synthetic unit hydrographs

Slides:



Advertisements
Similar presentations
Hydrology Rainfall Analysis (1)
Advertisements

Hydrology Rainfall - Runoff Modeling (I)
Applied Hydrology Design Storm Hyetographs
Hydrologic Modeling with HEC-HMS
Flood Routing & Detention Basin Design
Unit Hydrographs Ch-7 (Streamflow Estimation)
Storm Water Runoff. Where Does Storm Water Go? Site Development Watershed Characteristics Storm Water Management The Rational Method Storm Characteristics.
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Unit Hydrograph Reading: Applied Hydrology Sections , 7.5, 7.7,
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Flood Routing  .
R AINFALL -R UNOFF M ODELING O F W ADI Z IMAR. Prepared by Ahmad Tallal Abu-Hamed Mohamed Nemir Mohsen Osama Omar Nazzal Under the direction of Dr. Sameer.
Rainfall-Runoff Modeling
Unit Hydrograph The Unit Hydrograph Unit Hydrograph Derivation
Watershed Management Runoff models
Applied Hydrology RSLAB-NTU Lab for Remote Sensing Hydrology and Spatial Modeling 1 Rainfall-Runoff Modeling (2) Professor Ke-Sheng Cheng Dept. of Bioenvironmental.
Hyetographs & Hydrographs
Unit Hydrograph Reading: Sections , 7.5, 7.7,
Hydrologic Simulation Models
Unit Hydrograph Theory
Transforming the Runoff
Ch  Know how to determine peak flow using the rational method 2.
Reading: Applied Hydrology, Sec 15-1 to 15-5
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
Development of a Hydrologic Model and Estimation of its Parameters Francisco Olivera, Ph.D., P.E. Department of Civil Engineering Texas A&M University.
Synthetic Unit Hydrographs
CE 3372 – Lecture 10. Outline  Hydrology Review  Rational Method  Regression Equations  Hydrographs.
Hydrology & Water Resources Engineering
Hydrologic Routing Reading: Applied Hydrology Sections 8.1, 8.2, 8.4.
Estimating Qmax Using the Rational Method
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
Simulating the Hydrologic Response
Evaluation for the Effects of Flood Control
Runoff Hydrograph and Flow Routing
HEC-HMS Runoff Computation.
ERT 246 Hydrology & Water Resources Engineering Siti Kamariah Md Sa’at School of Bioprocess Engineering, UniMAP.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Hydrologic Analysis Dr. Phil Bedient Rice University.
STORMWATER MANAGEMENT
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Synthetic UH Definition: Synthetic Hydrograph is a plot of flow versus time and generated based on a minimal use of streamflow data. Example: A pending.
Basic Hydrology: Rainfall-Runoff – I
Flood Routing Applied Hydrology
1 TR-55 Urban Hydrology for Small Watersheds. 2 Simplified methods for estimating runoff and peak discharge for small urban/urbanizing watersheds Ch 1.
LibHydro.
Hydrologic Calibration: October 2010 U PDATE OF E FFECTIVE H YDROLOGY FOR M ARYS C REEK.
HYDROGRAPH is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. It.
Glenn E. Moglen Department of Civil & Environmental Engineering Virginia Tech Introduction to NRCS/SCS Methods (continued) CEE 5734 – Urban Hydrology and.
Sanitary Engineering Lecture 4
HYDROLOGY Lecture 10 Unit Hydrograph
Rainfall-Runoff modeling
Routing surface runoff to a basin outlet
Rainfall-Runoff Modeling (2)
Hydrologic Analysis (Bedient chapter 2)
Using a unit hydrograph to determine storm streamflow
Hydrologic Simulation Models
Hydrologic Analysis PART 1
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
Hydrograph Computation
Dr. Phil Bedient Rice University
Water Resources Engineering Hydrological Analysis and Simulation Model HEC-HMS Prof. Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering.
Flood Routing & Detention Basin Design
Applied Hydrology Hydrological Analysis and Simulation Model HEC-HMS
Hyetographs & Hydrographs
Floods and Flood Routing
Find: Qp [cfs] shed area tc C 1,050 1,200 1,300 1,450 A B C Q [acre]
Preciptation.
Preciptation.
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Example Determine the 1- hr unit hydrograph for a watershed using the precipitation pattern and runoff hydrograph below. The abstractions have a constant.
Presentation transcript:

Hydrology Rainfall - Runoff Modeling (II) Synthetic unit hydrographs Prof. Ke-Sheng Cheng Department of Bioenvironmental Systems Engineering National Taiwan University

Synthetic unit hydrographs For areas where rainfall and runoff data are not available, unit hydrograph can be developed based on physical basin characteristics. SCS unit hydrograph Clark’s IUH (time-area method) Linear reservoir model (Nash model)

SCS unit hydrograph

Misuse of SCS UH – an example

Clark’s IUH (time-area method) The concept of isochrones Isochrones are lines of equal travel time. Any point on a given isochrone takes the same time to reach the basin outlet. Therefore, for the follwoing basin isochrone map and assuming constant and uniform effective rainfall, discharge at the basin outlet can be decomposed into individual contributing areas and rainfalls.

Contributing area and contributing rainfall

Using the basin isochrone map, the cumulative contributing area curve can be developed. The derivatives or differences of this curve constitute the instantaneous unit hydrograph IUH(t).

If the effect of watershed storage is to be considered, the unit hydrograph described above is routed through a hypothetical linear reservoir with a storage coefficient k located at the watershed outlet. For a linear reservoir with storage coefficient k, we have

Consider the continuity of the hypothetical reservoir during a time interval t.

Example. A watershed of 1000-acre drainage area has the following 15-minute time-area curve. The storage coefficient k of the watershed is 30 minutes. Determine the 15-minute unit hydrograph UH(15,t).

Area between isochrones t = 0 and t = 0. 25 hr is 100 acres Area between isochrones t = 0 and t = 0.25 hr is 100 acres. Since we are interested in the unit hydrograph UH(15-min, t), the rainfall intensity in the time period (0.25 hr) should be 4 inch/hr. Therefore, the ordinate of UH(15-min, t) at time t = 0.25 hr is: 4 inch/hr  (1/12 ft/inch)  (1/3600 hr/sec)  100 acres  (43560 ft2/acre) = 403.33 cfs

坡地開發滯留池之水文設計 Hydrological Analysis for Detention Pond Design in Hillslope Development

坡地開發水文設計相關規範

現行設計規範之檢討

逕流量分析 (水土保持技術規範第 十七條 ) 洪峰流量之估算,有實測資料時,得採用單位歷線分析;面積在一千公頃以內者,無實測資料時,得採用合理化公式(Rational Formula)計算。合理化公式如下:

滯洪設施規劃設計原則 (水土保持技術規範第 九十五 條 ) 滯洪設施規劃設計原則 (水土保持技術規範第 九十五 條 )

滯洪量之估算 (水土保持技術規範第 九十六 條 )