LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.

Slides:



Advertisements
Similar presentations
FP7-Fission LUCOEX Large Underground Concept EXperiments Project Progress Meeting 14th May 2014 WP5 Quality Control of Buffer Installation.
Advertisements

KBS-3H Initial State Lucoex Workshop: Installation, closure and initial state May 13-14, 2014 Antti Öhberg.
EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
FP7-Fission LUCOEX Large Underground Concept EXperiments Project Progress Meeting 14th May 2014 WP5 Problem handling tools for buffer installation.
Leadership in Action 13 Sept Organizing an Event or Activity “Task Procedure”  Ref; Gold Star Manual Task Procedure is the whole process.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
Engineering Manufacturing Facilities
Course Overview Course Requirements Knowledge and Skills Student Expectations.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
From Research Prototype to Production
How is a manufacturing facility planned?
LUCOEX PPM 5 W1/W6 – Progress and plans Äspö HRL
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Parallel resources. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
By Cody Lee Thomas Lopez Chris Sedillo. 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill.
Telescope Integration and Tests Tuesday Afternoon.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Quarterly reports Why? What? When? How? Jorge Ocaña Task Manager (POPs) UNEP DGEF.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Lesson objective – to understand what is meant by one-off, batch and mass production Textiles – Production Processes.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Microsoft ® Official Course Module 6 Managing Software Distribution and Deployment by Using Packages and Programs.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Ad-hoc Transportation test of «CLIC module»
DOM & DU tendering and assembly
Constraints Space Load Capacity Costs Operating hours.
Workshop on Tau-Charm at High Luminosity
Meeting at CERN March 2011.
Mini-drawers, FE-ASIC , Integrator
Tango status at Elettra
United Kingdom arrangements for national registers of radioactive sources Ian Streatfield IAEA International Workshop on National Registers of Radiation.
Ad-hoc Transportation test of «CLIC module»
X-ray Pump-Probe Instrument
Northeast High-Level Radioactive Waste Transportation Task Force
NSS integrated installation plan workshop Introduction
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
UPPSALA UNIVERSITY_GERSEMI PROJECT
CHALLENGES IN MEETING 2020 HCFC PHASE OUT TARGETS
FASER LS2 work coordination meeting
Presentation transcript:

LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting 13st May 2014 Keijo Haapala

WP5 SITUATION The content of WP5 LOT1: Development of bentonite buffer and pellet installation. LOT2: Quality of installation LOT3: Problem handling tools 13th May 20142Haapala Keijo

WP5 SITUATION 33 Two machines has developed Installation machine (BIM) for buffer block emplacement Buffer transfer device (BTD) for transferring of buffer blocks from service tunnel for BIM. 13th May 2014Haapala Keijo

BIM AND TRANSPORTATION CONTAINER 4423th September 2013

BIM 5523th September 2013

BTD 23th September 20136

BUFFER INSTALLATION SEQUENCE 4. Block and pellet installation 1. Positioning 2. Block taken from container 3. Crane over dep. hole 6. Empty gripper to the shelf 7. Shelf forwards and crane over container 5. Transfer device positioning 8. Block taken from container 13th May 20147Haapala Keijo

LOT1, Installation of bentonite buffer and pellets BIM was ready for shipment from the manufacturer in October last autum. Test plan of Demonstration Phase 1 has prepared. Writing of Operating and Service Manual for machines. Test hall in Onkalo area was ready in the end of March. Final programming and preparations of the machine for the test started in Aprill. 13th May 20148Haapala Keijo

LOT1, Installation of bentonite buffer and pellet Things to note: Laser tracker changed, Leica -> API Control -> some extra work. Automation and electric has caused extra work Co-operation between different components Wiring faults -> broken components. 13th May 20149Haapala Keijo

LOT1, Installation of bentonite buffer and pellet Things to note: Work safety is a bit harder than expected Limited access to test hall, only persons who have a task in the project. 13th May Haapala Keijo

LOT2: Quality of installation Work has done at the same time with LOT1, mainly programming Main part of the work will take place when the buffer installation demonstrations start. 13th May Haapala Keijo

LOT3: Problem handling tools. What is needed if the bentonite block falls to the deposition hole during installation? Demonstrations after LOT 1 and 2. Work has divided in two situations: Before canister installation. After canister installation. 13th May Haapala Keijo

DEMONSTRATIONS Demo Phase 1: Testing in test hall in Onkalo site. Demo Phase 2: Testing in Onkalo demonstration tunnel with concrete blocks. Demo Phase 3: Testing in Onkalo demonstration tunnel with bentonite blocks. 13th May Haapala Keijo

DEMO PHASE 1 IN TEST HALL Purpose to finalize the installation machine. Detailed test for different functions Adjusting the speed of functions in the machine Perform the installation test with full size concrete blocks To find out what is critical 13th May Haapala Keijo

DEMO PHASE 1 IN TEST HALL Most important part of demonstration Estimated testing time 3 months: April - June, if everything goes well. 13th May Haapala Keijo

TEST HALL 13th May Haapala Keijo

BIM IN TEST HALL 13th May Haapala Keijo

BIM IN TEST HALL 13th May Haapala Keijo

CONCRETE BLOCKS WITH CONTAINER TOPS 13th May Haapala Keijo

DISPOSAL HOLE IN TEST HALL 13th May Haapala Keijo

DEMO PHASE 2: TESTING IN ONKALO WITH CONCRETE BLOCKS Targets: To test the installation in Onkalo conditions Installing of whole buffer within two hours 13th May Haapala Keijo

DEMO PHASE 3: TESTING IN ONKALO WITH BENTONITE BLOCKS What kind of effect the bentonite gives to installation process? What is the effect of moist conditions in Onkalo How safe is the process? 13th May Haapala Keijo

DEMO PHASE 3: TESTING IN ONKALO WITH BENTONITE BLOCKS Possibly isostatically pressed bentonite blocks are not available. Alternative buffer: Mixture of uniaxially pressed benonite and concrete blocks. The handling of concrete blocks with vacuum lifter is more risky than bentonite blocks 13th May Haapala Keijo

DEMO PHASE 3: TESTING IN ONKALO WITH BENTONITE BLOCKS Alternative buffer: Mixture of uniaxially pressed benonite and concrete blocks. Bentonite blocks in critical positions: Bottom and top First and last ring First on the canister 13th May Haapala Keijo

WORK SAFETY OF BIM AND BTD During the demonstrations, access to the test place is limited. Demo Phase 1 in the test hall. When demonstration is going on, only operators and reponsible persons can be in the test hall! Special arrangements for visitors; the access is denied, follow up of demonstrations via cameras. 13th May Haapala Keijo

WORK SAFETY OF BIM AND BTD Demo Phase 2 and 3 Steering of installation will be performed by cameras with wireless method outside of disposal tunnel During the installation the access to disposal tunnel is denied 13th May Haapala Keijo

WORK SAFETY OF BIM AND BTD Before the start of demonstrations, is needed: Detailed test plan. Safety estimation of tests. Training of employers for working in Onkalo area and in demonstrations. Operating manual of machines. 13th May Haapala Keijo

13th May Haapala Keijo