Solar PV on a Capped Municipal Landfill Ellen E. Ebner, Tighe & Bond 7/26/2012.

Slides:



Advertisements
Similar presentations
Commissioning, Maintenance, and Troubleshooting
Advertisements

Soil Erosion.
The Committee and Research – Where are we and where might we be going?
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Presentation to June 25, 2008 Northeast States-EPA Workshop Siting Renewable Energy Projects at Closed Solid Waste Landfills and Contaminated.
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at
Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
NC SWANA FALL 2014 MEETING Presented by Ed Mussler P.E., Wilmington, NC October 2014 DWM Post-Closure Landfill Use Concepts and Considerations.
Somersworth Landfill Renewable Energy Reuse Assessment Somersworth (NH) City Council April 7, 2014.
Promoting Renewable Energy Development on Closed MA Landfills Sarah Weinstein, Massachusetts Department of Environmental Protection, AEHS Foundation, UMass.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
Upper Providence Township Stormwater Management MS4 Program.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
GroSolar.com | Billings Farm Road White River Junction, VT Guilford Road.
Env 247 Overview of Stormwater Management March 1, 2011.
Mauthe Center Solar Project NWTC Solar Advanced System Design Class.
We’ve got it! Solar Solutions. Overview Intro to Solar and industry overview MicroFIT – Application and Rules How does Solar work – System overview Osso.
6:00 ­- 6:30 p.m.Poster board display 6:30 - 6:40 p.m.Open Meeting/Introductions Ellie Donovan, MassDEP, Facilitator 6:40 - 6:45 p.m.Opening Remarks Michelle.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
SOLAR BASICS. CONTENTS I.Introduction to Solar Technology II.Terminology: Solar Terms and Energy Terms III.Costs and Financing IV.Basics of Federal, State,
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Solar System Life Maintenance Call in number: Meeting number: * * August 3, 2009.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Responses to Levee Certification Requests 1.Closures 2.Maintenance Plans 3.U/S and D/S Levee Tie-ins.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Landfill Installation Considerations – Solar PV By: Gary Garfield, PE, LSP URS Corporation Salem, New Hampshire Renewable Closed Landfills.
Renewable Energy Facilities at Closed Landfills Siting and Installation Considerations January 19, 2010 Briony Angus, AICP Dana Huff, P.E. Tighe & Bond,
Lynne Welsh Massachusetts Department of Environmental Protection.
Session 12 Grid Tied PV Systems – Part 2 Design Considerations October 06, 2015.
Session 17 Grid Tied PV Systems – Part 6 Three-Phase Systems Siting and Mechanical Considerations October 29, 2015.
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Stand-Alone PV Systems, Part 2
Grid Tied PV Systems – Part 5
Part 5 - Good Housekeeping
1 Module 3: Typical Roadway Drainage Where it goes in Where it comes out Stormwater System Maintenance: A 4-Part Workshop Series.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.
THE HINGHAM LANDFILL  HMLP regularly receives calls from solar developers inquiring about building solar arrays at the landfill and on Town owned buildings.
1 © 2009 Energy Conversion Devices Proprietary and Confidential FLEXIBLE SOLAR ENERGY LANDFILL COVERS ADVANTAGES & CONSIDERATIONS 2009 Federal Environmental.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Pollution Control: For Field Office Construction Sites.
R E N O V U S. S O L A R Town of Catlin Community Solar Farm May 12, 2016 Jon McNamara.
Monterey County Grading and Erosion Control Requirements and Enforcement Methods 1.
City Council Storm Water Presentation March 6, 2014.
ENGINEERING CHALLENGES OF SITING RENEWABLE ENERGY AT LANDFILLS Ronald Johnson, PE, GE Brownfields Conference 2011 Philadelphia, PA April 5,
Typical Solar Facility Components
Photovoltaic Systems Engineering Session 27
Site Design •Project Site context Module 3: •Site Analysis
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Photovoltaic Systems Engineering Utility Scale Development:
Photovoltaic Systems Engineering Session 23
Stream Crossing Replacement Policy
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Solar PV on a Capped Municipal Landfill Ellen E. Ebner, Tighe & Bond 7/26/2012

Project Permitting ■ Conservation Commission – Generally either RDA or NOI depending on site ■ MEPA Request for Advisory Opinion ■ MassDEP Post Closure Use Permit – Pre-application meetings ■ Planning Board Permitting – Generally either Site Plan Approval or Special Permit ■ Interconnection Application

Project Development Process – Site Planning – slopes, shading infrastructure avoidance – Geotechnical Engineering – landfill stability, loading, slopes – Site/Civil Engineering – Access roads, stormwater, landfill gas – Electrical Engineering – Interconnection design – Construction Phase – Public Relations – O&M Engineering & Project Completion

Design Considerations ■ Design – Layout & Project Size – Topography – Orientation – Stormwater infrastructure – Landfill gas infrastructure – Access road – Culverts – Electrical Side Slopes E E

Design Considerations ■ Loading over Cap – Cap Design – Ballasts and Solar Arrays – Equipment Pad – Impact to cap – Access during and after Construction

Design Considerations ■ Access Roads – Minimum 3’ Separation from Synthetic Cap Material (FML) – Equipment other than LGP equipment

Design Considerations ■ Stormwater – Arrays and Ballasts

Design Considerations ■ Stormwater – Access Roads » Maintaining Existing Stormwater Management System –Adding Culverts » Erosive Velocities

Construction Sequencing

Construction – Site Prep

Construction – Access Roads

Construction - Ballasts ■ Precast versus Cast in Place Blocks

Construction - Racks

Construction - Modules

Construction – Electrical Equipment

Press and Education ■ Media Day – Boston Globe – Lieutenant Governor Murray – MassDEP Commissioner Kimmell – Easthampton Mayor Tautznik ■ MassDEP Fieldtrip

Operations & Maintenance ■ Typical Closed Landfill O&M – Water monitoring – Settlement/Cap inspection – Gas vent inspection – Stormwater infrastructure inspection – Mowing, vegetation management ■ Solar Array O&M – Panel cleaning as necessary when decreased production/observed accumulation of dirt – Annual inverter & electrical inspection

Questions “It’s just awful to look at.” “Those of us most affected by this aren’t going to see any benefits.’’ One neighbor “described himself as ‘mildly opposed’ to the project. He worries that the 5,000-pound concrete blocks that anchor each solar array will puncture the cap of the landfill, leading to toxic leaks into the ground water or clouds of methane.”