Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.

Slides:



Advertisements
Similar presentations
Albania Good practices and Gaps 13 December 2013.
Advertisements

Pakistan Nuclear Regulatory Authority
Exemption, Clearance, Discharges
SECURITY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS IN THE UNITED STATES.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Authorization and Inspection of Cyclotron Facilities The activities and responsibilities of the Regulatory Body GSR Part 1.
IAEA International Atomic Energy Agency Regulations Part I: Role and Structure of Regulations Day 8 – Lecture 5(1)
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
EMERGENCY PLAN AND PROCEDURE IN INDUSTRY INVOLVING NORM/TENORM
Protection Against Occupational Exposure
Authorization and Inspection of Cyclotron Facilities Staff Requirements.
Authorization and Inspection of Cyclotron Facilities Inspections.
IAEA International Atomic Energy Agency SAFETY REQUIREMENTS FOR PREDISPOSAL MANAGEMENT OF RADIOACTIVE WASTE Luc Baekelandt Safety.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
U.S Regulatory Process for Uranium Production Facility Licensing and Operation Daniel M. Gillen.
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Prime Responsibility for Radiation Safety
I st Workshop on issues and trends from the European IRRS missions, 22 – 23 January 2014, Brussels Authorization Improvements: Establish within the regulatory.
OSU-CHS ALARA Statement The OSU-CHS radiation safety program will be conducted in such a manner so that exposure to faculty, staff, students, the public,
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the licensee Jiří Veselý, SONS, Czech republic.
Authorization and Inspection of Cyclotron Facilities The Authorization Process.
Management and Safe Disposal of Radioactive Waste COUNTRY STATUS:ZIMBABWE By Rujeko Lynette Mpandanyama Tunis, March 2014.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Nuclear decommissioning: Turning waste into Wealth
Preliminary Decommissioning Plan for the Canadian Light Source
Sustaining Cradle-to-Grave Control of Radioactive Sources (INT-9182) Workshop on implementation of a national cradle-to-grave control system for radioactive.
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Module Planned exposure situations Public exposure (GSR Part 3)
REGULATORY REQUIREMENTS FOR HANDLING RADIOISOTOPE Mohd Abd Wahab Yusof (Dr) Malaysian Nuclear Agency.
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Research Reactor Decommissioning Demonstration Project (R2D2)
Safety and Security of Radiation Sources
BASIC PROFESSIONAL TRAINING COURSE Module XVIII Decommissioning
IAEA Safety Guidance on Licensing and Oversight Activities
Research and Test Reactor Decommissioning Inspections
NRC Oversight on Storage of Special Nuclear Material
Course Structure.
Regulatory system in Hungary
Safety requirements for predisposal management
Research and Test Reactor Decommissioning Inspections
LEARNING OBJECTIVES The key objectives of this lecture are to familiarize the workshop participants with the: Different stages of the licensing process.
Presentation transcript:

Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility

Authorization and Inspection of Cyclotron Facilities To achieve an understanding of the authorization process and the procedures for its implementation in the decommissioning of cyclotron facilities.

Authorization and Inspection of Cyclotron Facilities The main and specific elements to be included in an application for Authorization Assessment of an application based on criteria established by the legislation, by regulation or the Regulatory Body. Establishment and use by the regulator of suitable procedures for the consistent assessment of applications. Criteria for granting, renewing, amending and revoking a license.

Authorization and Inspection of Cyclotron Facilities License to decommission a cyclotron facility At the end of its useful life, the facility should be decommissioned and the building and the surrounding areas returned to uncontrolled use. Upon reaching the decision to shut down the facility for the decommissioning, the licensee should apply for the decommissioning license.

Authorization and Inspection of Cyclotron Facilities

Application for a license to decommission a cyclotron facility Specific elements of the application: Specific elements of the application: the name and location of the cyclotron facility; the proposed nature of and schedule for the decommissioning; the land, buildings, structures, components, systems, equipment, radioactive and hazardous substances that will be affected by the decommissioning;

Authorization and Inspection of Cyclotron Facilities

the nature and extent of any radioactive contamination at the cyclotron facility, including radiation dose rates; the nature, quantity and activity of radioactive substances at the cyclotron facility; the maximum quantities and concentrations of radioactive substances and hazardous substances that may be released into the environment; the proposed measures to control releases of radioactive substances and hazardous substances into the environment.

Authorization and Inspection of Cyclotron Facilities Segregation and labeling of components

Authorization and Inspection of Cyclotron Facilities the anticipated maximum dose of radiation that may be received by any person as a result of the decommissioning; the proposed responsibilities and qualification requirements for the workers; and a description of the planned state of the site upon completion of the decommissioning.

Authorization and Inspection of Cyclotron Facilities Segregation of components for storage

Authorization and Inspection of Cyclotron Facilities  Characterize the operation. How long have radioactive substances and prescribed equipment been in use, where were they used, which ones were used and in what quantities? Consult old licenses.  Plan for the transfer, removal, shipment and disposal of radioactive substances and prescribed equipment.  Plan contamination monitoring and decontamination. Make allowance for radiation monitoring, dismantling and removal of equipment.

Authorization and Inspection of Cyclotron Facilities  Remove or deface all signs and labels including radioactive substance packages.  Conduct a final radiological survey and report to the Regulatory Body so that a decommissioning verification can be scheduled.  If applicable defer decommissioning until clearance levels are met! Reduction or even prevention of nuclear waste Cooling periods of 100+ years needed due to Eu-152

Authorization and Inspection of Cyclotron Facilities

Walls of the accelerator vault are activated!

Authorization and Inspection of Cyclotron Facilities The application is assessed for completeness and technical content and the license issued if all regulatory and safety requirements are met.

Authorization and Inspection of Cyclotron Facilities Renewal A decommissioning license should be renewed prior to its expiration date. The licensee sends the application for license renewal which should detail any modification of the data provided in the original license application.

Authorization and Inspection of Cyclotron Facilities The regulatory oversight of the decommissioning activities is also planned and scheduled. Typically, an initial inspection upon issuing the license verifies that the operation of the cyclotron facility has ceased. Subsequent inspections may verify proper execution of the decommissioning plan. At those stages any modifications of the decommissioning plan may require the amendment of the license.

Authorization and Inspection of Cyclotron Facilities A final inspection must be done upon completion of the decommissioning to verify that the land, buildings, structures previously parts of the cyclotron facility may be returned to non-controlled use. On the basis of the licensee’s request and the successful final inspection report, the decommissioning license is revoked.