IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.

Slides:



Advertisements
Similar presentations
Emergency Preparedness and Response
Advertisements

Welcome to … The safety of all individuals working, or visiting the … facilities is of great imporatance to us and is our one priority. We would request.
(Company) Induction. Policies These can be found on all notice boards and you must spend the time to read them. Company have the following Policies: Health.
HSE instruction REC B.V. Harlingen Safety starts with the man in the mirror Welcome Information: All employees VCA or SCC Emergency exit Telephones off.
Emergency Evacuation Zayed University, Dubai Campus.
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Think Safe. Act Safe. Be Safe. Monthly Safety Spotlight, March 2010: Emergency Preparedness and Continuity Planning Preparing ahead of time helps you cope.
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
A best practice guide to...
Staff Safety Induction
Health and Safety in the School of Biological Sciences This leaflet contains important health and safety information for new employees. If, after familiarising.
FLOOR WARDEN TRAINING Presented by State Risk Management 2011.
Safe Learner Induction Stage 1 (complete) Harry Wheatcroft Safety Advisor.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Fire evacuation information. Procedure on finding a Fire Sound the Fire Alarm by activating the Fire Alarm system Evacuate the building and proceed to.
How to create... A Fire Evacuation Plan.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
What you will learn in this session 1.The characteristics of fire, smoke and toxic fumes 2.Fire hazards involved in the working environment 3.Significant.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
School of Engineering & Electronics Safety Presentation.
Student Briefing College Of Engineering February 2011.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
High-Rise Life Safety for
Food Safety Act, food hygiene regulations, HACCP, HASAWA, HSE.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
WELCOME TO THE SCHOOL OF COMPUTING Angela Doe School Administration Manager
WELCOME TO THE SCHOOL OF COMPUTING Angela Doe School Administration Manager
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Fire Safety in the Workplace Pupils will learn how to act when faced with a fire in a work setting.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
Your FM Services FM Services (How to make a rquest for service?) Should you require any of the services that we manage, or wish to report any building.
FIRE PREVENTION. Fire Of the many hazards on site or at work, fires are the worst kind. They do a great deal of damage every year.  All fires, however.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Add name of trust / organisation in box 1 and name of trainer in box 2. Delete THIS box.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
1/6 ALICE GLIMOS, Marc Tavlet Hazards and Safety in ALICE - Ways to reduce the risks Presentation at the ALICE Club, Monday, December 1 st, 2003 by Marc.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
Fire evacuation information – Woodhill House
S’Cool LAB Safety Julia Woithe 1.
The Office Procedures and Technology Chapter 7 Time and Workstation Management Copyright 2003 by South-Western, a division of Thomson Learning.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
Mechanical Equipment.
What you will learn in this session 1.The characteristics of fire, smoke and toxic fumes 2.Fire hazards involved in the working environment 3.Significant.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Hot Work Permit Osan AB Fire Emergency Services.
Safety for Researchers Philip Thornton Safety Officer 12 th November 2015.
Building The topic ‘Building’ can be divided into three parts: Passive fire protection Fire protection that is built-in in the building (for example fire.
The Office Procedures and Technology Chapter 7 Time and Workstation Management Copyright© 2007 Thomson/South-Western.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
On behalf of the Safety Unit,
Fire Safety.
Cessco Fabrication & Engineering Ltd.
Test beam check list Michael JECKEL EN-EA-EC.
What you will learn in this session
Some arrangements for personnel safety 1- Procedures for access
Safety in the Neutrino Platform Hall
SPS Winter stop Planning meeting (N06) 05/01/2011
NP Hall Visits Guides’ training
Safety in Construction and Upgrade Phases
Safety rules for works supervisors
Cryogenic Risk Assessment in LHC
Goodyear Napanee Contractor Safety
Presentation transcript:

IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1

 6.9km of accelerator tunnel.  2.5km of transfer tunnels.  7 main access points.  Over 20 surface buildings. IEFC Workshop  10 pits and 15 lifts.  Access to the underground areas is only possible for very short periods of time.

 Although the technical stop lasted 11 weeks (from the 6 th December 2010 until 21 st February, ) general access for works was only possible for 4 weeks  334 separate jobs requested.  17 required VICs (Visite d'Inspection Commune - Joint Inspection)  Works coordinated between multiple groups and departments:  EN (EL/CV/HE/STI/MEF)  BE (APB/BI/RF/OP)  TE (MSC/EPC/VSC)  GS (SEM/ASE/SEE)  DGS (RP) IEFC Workshop 20113

 Electrical Safety checks  Area safety visits  Lighting inspections and maintenance  Lift maintenance  RP surveys  Visits by the fire brigade to improve familiarisation with areas  Fire and smoke detection maintenance  Fire extinguisher maintenance  Access control tests  Toilet cleaning and maintenance. IEFC Workshop 20114

 PPSPS (Plan Particulier de Sécurité et de Protection de la Santé)  (EDMS )EDMS  SPS general coordination plan  (EDMS rev. 2010)EDMS rev  Visitors in the controlled zone of the SPS  (EDMS )EDMS IEFC Workshop 20115

 Biocell training  Electrical safety awareness  Access into the SPS can only be granted to persons who have followed this web-based course.  General CERN safety courses (level 1,2 & 3)  RP course.  ( NO dosimeter without this course)  EDH access request and authorisation IEFC Workshop 20116

 Hard hat  Lamp/torch  Passive dosimeter  Electronic dosimeter  Biocell  Safety shoes And your Buddy. (Do not work alone !) IEFC Workshop 20117

 Fire extinguishers  Smoke detection systems  Fire detection systems  Sprinkler systems  Evacuation alarms  Emergency RED telephones  Intercom system  Controlled access systems  Clearly marked evacuation routes IEFC Workshop 20118

9

10

 People  TSO - (Territorial Safety Officer)  Safety Coordinator  Superintendent / Technical coordinator  CCC operators  DSO - (Departmental Safety officer)  GLIMOS (Group Leader In Matters of Safety)  Visits  VICs – (Visite d'Inspection Commune - Joint Inspection)  Regular on site visits  Permits  Authorisation to work  Consignation (Isolating of electrical equipment)  Fire permit  IS37 (Disabling all or part of the system generating a level 3 alarm.)  Weekly planning meetings  Vital that key personnel attend  Website (up to date planning)  IEFC Workshop

 Notice boards  s  Meetings  Telephone calls  Face to face conversations  RP surveys  SPS coordination website  De-Briefing meeting  Lessons learned and how can we improve for next time When it comes to safety, you can never have too much information. IEFC Workshop

Changing of 1 magnet in the SPS  Coordination of work between 5 separate groups  Breaking of the vacuum  Cutting of cooling water systems  Isolating of main power supplies  Transportation of a large magnet around the SPS  For the main dipoles (MBA’s and MBB’s): w- 80cm x h- 65cm x l- 6.5m ; weight 18 tons  For the main quadrupoles (QD’s and QF’s): w- 80cm x h- 80cm x l- 3.5m ; weight 8.5 tons IEFC Workshop

IEFC Workshop

 Preliminary meeting  Ensure that all groups are aware of what they need to do and when.  Coordinate with planning to find the best time in the schedule to do the work.  Identify any radiation issues. (How hot is the area being worked in?)  Identify any safety issues. (Arrange a VIC if necessary)  Ensure that all equipment to be used has been fully tested and certified. (lifting equipment etc)  Inform all parties working in the affected areas of the planned work   Weekly planning meeting  Notice boards in the affected areas  Ensure that the planning is respected!! IEFC Workshop

IEFC Workshop

 Once work has been finished, it is imperative:-  That the area is clean and has been made safe.  That the coordination team and everyone involved is informed.  That all permits and consignations are signed off.  That the planning is updated. IEFC Workshop

IEFC Workshop Superintendant’s signature Operations Group leader signature SPS Ring Patrol EPC start up checks Cold check out tests DSO Tests Minimum 2 weeks

 Safety is not there to make it harder or more difficult for you to do your work. It is there to ensure that your work is done without danger to yourself, others or to the equipment or the accelerator itself  We want you to go home at the end of the day in the same condition you arrived, free from harm, injuries or work-related illness.  EVERYONE is responsible for safety! IEFC Workshop