Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)

Slides:



Advertisements
Similar presentations
Rooftop Solar Systems Rooftop Solar System (Off-Grid) Reliance Solar Energy™, Ratnagiri.
Advertisements

Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Ed Gaddy March 21, 2011 The Real Value of Spacecraft Solar Array Technology and Slow and Steady Does Good.
Watch the following video and answer the questions on your question sheet. Importance of Testing.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 4: February 8 th 2007 Project Aquarius Power Engineering Habitat.
Introduction to Space Systems and Spacecraft Design Space Systems Design Power Systems Design -I.
MAXIM Power Subsystem Diane Yun Vickie Moran NASA/GSFC Code (IMDC) 8/19/99.
BATTERIES of Renewable energy systems By Jess, Michael & Emily If one was to perceive a renewable energy system as a living organism, the "battery" would.
Satellite communications and the environment of space Images: NASA.
Photovoltaic Solar Cells and Solar Energy Systems for Home Usages Mohammad Anisuzzaman.
Space Engineering Institute (SEI) Space Based Solar Power Space Engineering Research Center Texas Engineering Experiment Station, Texas A&M University.
September 9, 2003 Lee Jay Fingersh National Renewable Energy Laboratory Overview of Wind-H 2 Configuration & Control Model (WindSTORM)
1 Electrical Power System By Aziatun Burhan. 2 Overview Design goal requirements throughout mission operation: Energy source generates enough electrical.
Jim Baughn K9EOH. Preview Fuel Sources Power Generators Capturing and Using Generated Power Solar Power Expansion Safety Questions.
Technical Data Electric engine, reduction belt and complete electronics only 5kg Paramotor weight without batteries: 12,5kg One-piece easy assemble (kit.
Solar PV Design Implementation O& M March 31- April 11, 2008 Marshall Islands 2. Solar Home Systems (SHS) 2. Solar Home Systems (SHS) Herb Wade PPA Consultant.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Marco Concha Charles Petruzzo June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Flight Dynamics.
Solar Powered Cars. Solar Cars Definition: A car which uses sunlight to charge batteries which inturn power the motors that drive the car.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Noah Garcia-Galan *Some information in this presentation comes from outside sources.
Launching, Orbital Effects & Satellite Subsystems
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
LSU 06/04/2007Electronics 51 Power Sources Electronics Unit – Lecture 5 Bench power supply Photovoltaic cells, i.e., solar panel Thermoelectric generator.
Designing Solar PV Systems (Rooftops ). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing Solar.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
Morehead State University Morehead, KY Prof. Bob Twiggs Power Systems Design
The exposure of the Moon to the Earth’s plasmasheet Mike Hapgood STFC Rutherford Appleton Laboratory
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
Dr. Aprille Ericsson Eric Stoneking June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Attitude Control Systems.
AAE450 Senior Spacecraft Design Project Aquarius Mike Kowalkowski Week 2: January 25 th, 2007 Project Aquarius Power Engineering Habitat, Battery, and.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
NAME DATE The Unit Organizer BIGGER PICTURE LAST UNIT/Experience CURRENT UNIT NEXT UNIT/Experience UNIT FOCUS QUESTIONS is about... Student Activities.
Student Satellite Project Power Generation and Distribution 1 Power Generation and Distribution WINTER ’99 REVIEW Chieh-Kuen Woo Team Leader.
Competition Sensitive Dennis Asato June 28, 2001 XSuperNova / Acceleration Probe (SNAP) Propulsion.
TA Station Power Team Meeting, 11/10/2015. Autonomous Power System – In the field Why Lithium? -Significant weight and volume savings (41.9Wh/lb vs 21.25Wh/lb)
Competition Sensitive Gabe Karpati June 28, 2001 SuperNova / Acceleration Probe (SNAP) System Overview.
Energy Power System. Electricity Electricity is the flow of electrons through a conductor Electricity will only move through a closed circuit, if the.
1. INTRODUCTION 2. CONCENTRATED SOLAR POWER 3. PARABOLIC TROUGH 4. SOLAR PANELS 5. PHOTOVOLTAICS 6. PV SYSTEM 7. ADVANTAGES & DISADVANTAGES 8. STORAGE.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 EPS—Design Lesson 20 Spring 2005.
John Martin April 5, 2001 SuperNova/ Acceleration Probe (SNAP) Introduction.
SuperNova / Acceleration Probe Thermal System Wes Ousley November 16, 2001.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Spacecraft Systems Henry Heetderks Space Sciences Laboratory, UCB.
K UMU A ’ O C UBESAT Amy Blas March 7, W HAT IS C UBE S AT ? 10x10x10 centimeter cube Launched in lower earth orbit (LEO) Started last semester.
IP d.c. devices © Oxford University Press 2011 d.c. devices.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
TRIO-CINEMA 1 UCB, 2/08/2010 ClydeSpace Electronic Power System Yashraj Khaitan Space Sciences Laboratory University of California, Berkeley.
Presented By Rustam Ansari 1GC05EE037 Under guidance: JANAB AMANULLAH ASST.PROF. GHOUSIA COLLEGE OF ENGINEERING RAMANAGARAM DEPARTMENT OF ELECTRICAL &ELECTRONICS.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Improved efficiency of solar powered Vehicles Sagar Dewangan, Akhilesh K. Dewangan, Isham Panigrahi KIIT University, Bhubaneswar Abstract: Now a day we.
Terry Smith June 28, 2001 Command and Data Handling System SuperNova / Acceleration Probe (SNAP)
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Solar Energy Improvement Techniques
Spacecraft Power Systems
Technical Resource Allocations
ENERGY STORED BY A CAPACITOR
Show Video:
Payload Concept Review
Electric Current, EMF and Electric Potential.
Scientific Mission Applications
Chapter 2 The Process of Design.
Power Sources Electronics Unit – Lecture 5
Presentation transcript:

Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)

Electrical Power System Page 2 SNAP June 28, 2001 Goddard Space Flight Center  Overview  Supporting Data  Driving Requirements & Assumptions  Options considered  Selected Configuration & Rationale  Technologies Required  Requirements Verification  Mass, Power, and Cost Summary  Additional Trades to Consider  Risk Assessment  Issues and Concerns  Back Up Charts Electrical Power System Overview

Electrical Power System Page 3 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Supporting Data  Spacecraft Electrical Power System (EPS) consists of Solar Cells to collect/convert electrical energy, a Battery to store energy for launch, peak loads and eclipses. Electronics are used to regulate the solar array and charge the battery.  Solar Arrays  Solar arrays provide electrical power for the spacecraft during the sunlight and recharges the battery for electrical power during the eclipse.  Triple Junction GaAs solar cells are used.  Energy Storage  Provides electrical power during launch  Provides electrical power during eclipses  Provides peak electrical power during sunlight as needed  PSE (Power System Electronics)  Provides Solar Array power Regulation  Battery charge control  Power switching and distribution

Electrical Power System Page 4 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Driving Requirements & Assumptions  Launch:Dec  Orbit:57 RE x 19 RE  Life:2 Years Minimum 5 years Goal  Battery:Needed to provide Power during eclipse  Solar Array:Spacecraft rotation of +/-45 deg during orbit cycle.  Solar Array Temperature:70 deg C

Electrical Power System Page 5 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Options Considered  Battery Mass. Many different battery masses were calculated based on changed in the load analysis. Many more traded can be done in this area.  Launch dated. Dec or June launches seam to be better than March or Sept. The March and Sept have eclipse cycles during the solar power min cycles.  Solar Array height vs coverage. Solar Array required is 2.39 M^2 at a substrate level and to keep the temperature to 70 deg C will require about 2.4 M^2 OSR’s (optical surface reflectors).

Electrical Power System Page 6 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Selected Configuration & Rationale  Solar Array. Selected 2.47 M 2 solar array area using Triple Junction Gallium Arsinide (TJGaAs) solar cells to reduce solar array area and weight.  MAP type PSE. This PSE can be adapted easily for the study phase.  Battery. NiH2 IPV (individual Pressure Vessel) at 100 ah this is a EPT stock item SAR Note a EPT SAR may also work. The mass of either of these batteries is 81 kg and further search for NiH2 SPV’s (Single Pressure Vessel) and development of large ampere hour LiIon batteries could provide a mass savings.

Electrical Power System Page 7 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Technologies Required  Selected 2.47 M 2 solar array area using Triple Junction Gallium Arsinide (TJGaAs) solar cells. This meets the Science 3 year requirement.  Impact on design. TJGaAs cells are available, however 28% efficiency is a small risk.  Alternatives: 26% efficient solar cells with increased solar array area.  Feedback to technology developer: Develop 28% efficient solar cells.  Battery will be 100 ah NiH2 IPV for the launch loads and eclipse season loads.  PSE will be a modification of the MAP PSE.

Electrical Power System Page 8 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Requirements Verification  Standard verification for PSE and Solar Array. A life test should be done on the battery design to ensure it will meet the cycle life requirement with normal eclipse seasons and instrument turn-on shallow discharges.

Electrical Power System Page 9 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Additional Trades to Consider  Battery large size (mass & ah) is driven by the long eclipse and eclipse load.  Look at LiIon life development data. The size of this battery is not presently being developed the capability of LiIon technology, however this should be reviewed in the future and may reduce the battery mass.  Scrub the load analysis to reduce the battery ampere-hour requirement. Scrubbing the launch power and eclipse power in the load analysis may reduce the battery ah and mass.  Continue to look at the Solar Array size vs Mission Life.  Continue to look at number of S/A quadrants vs height.

Electrical Power System Page 10 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Risk Assessment  Solar Cell Efficiency of 28% is a short term risk.  Solar panel production for 28% efficient cells is expected in the fall of This risk should be retired at that time.  This mission is not solar array limited and a fall back for this risk is to baseline 26% efficient solar cells.

Electrical Power System Page 11 SNAP June 28, 2001 Goddard Space Flight Center Electrical Power System Issues and Concerns  Battery Mass: Baseline NiH2 IPV for reduced risk and to stretch the mass envelope. Need further work with reducing the load analysis and trading other battery technologies like the NiH2 SPV. Also should look at LiIon development for large ah cells.  Solar array trade for OSR, temperature and quadrants of coverage vs height, mass and cost.

Back Up Charts SNAP Electrical Power System June 28, 2001

Electrical Power System Page 13 SNAP June 28, 2001 Goddard Space Flight Center Load Analysis

Electrical Power System Page 14 SNAP June 28, 2001 Goddard Space Flight Center EPS Curve