System Planning- Preliminary investigation

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Chapter 2 Analyzing the Business Case.
Chapter 20 Introduction to Systems Development and Systems Analysis Copyright © 2012 Pearson Education 20-1.
Systems Analysis and Design 9th Edition
Chapter 2.
© Prentice Hall CHAPTER 13 Setting a Direction for Information Resources.
1 Info 1409 Systems Analysis & Design Module Lecture 5 - Feasibility HND Year /9 De Montfort University.
IT Planning.
Analyzing the Business Case
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
7.2 System Development Life Cycle (SDLC)
Chapter 5: Project Scope Management
AIS 630 chapter 3: systems planning- preliminary investigation
CHAPTER 9 DEVELOPING BUSINESS/IT STRATEGIES. IT Planning Planning an information system doesn’t start with bits, and bytes, or a Web site. It starts with.
System Planning Analyzing the Business Case
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Acquiring Information Systems and Applications
Systems Analysis and Design: The Big Picture
Chapter 2: Analyzing Business Case Phase 1: Systems Planning
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Business Case Justification System Planning
Chapter 14 Information System Development
Computers Are Your Future © 2006 Prentice Hall, Inc.
Lecture 4 1 Introduction to Systems Planning Lecture 4 2 Objectives n Describe the strategic planning process n Explain the purpose of a mission statement.
Acquiring Information Systems and Applications
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Phase 1: Preliminary Investigation or Feasibility study
Acquiring Information Systems and Applications
Chapter 2 Analyzing the Business case
System Planning (Preliminary Investigation Overview)
Systems Analysis and Design
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
 2004 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, by Bodnar/Hopwood 10 – 1 Systems Planning and Analysis Chapter 10.
BIS 360 – Lecture Four Ch. 5: Identifying and Selecting Projects
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
1 Systems Analysis & Design 7 th Edition Chapter 2.
Systems Analysis & Design 7 th Edition Chapter 2.
Accounting systems design & evaluation 9434SB 18 March 2002.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
Phase 1 Systems Planning
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Project Management PTM721S
Information Systems Development
Systems Planning and Analysis
Systems Analysis and Design in a Changing World, 4th Edition
Planning for Information System
INT211-Information Technology II
Principles of Information Systems Eighth Edition
Chapter 13: Setting a Direction for Information Resources
Systems Analysis and Design
THE FEASIBILTY STUDY LECTURE-5.
Chapter 5: Project Scope Management
CLINICAL INFORMATION SYSTEM
Introduction to Projects
Systems Analysis and Design
Project Management Process Groups
Project Management Chapter 11.
System Analysis and Design:
Presentation transcript:

System Planning- Preliminary investigation Chapter 3 System Planning- Preliminary investigation

Information System Strategic Planning Is a set of long term goals that describe the information architecture and major IS initiatives needed to achieve the goals of the org Must be aligned with overall org’s strategic plan Must efficiently allocate resources among competing systems so the projects can be completed on time , within budget and with required functionality Should identify specific areas to be given priority because of resource constraints. Priorities must be set to ensure maximum return is obtained for funds invested in dveloping IS

Information System Operational Plan Is a set of projects that will be executed by the IS dept and the functional areas managers in support of the IS strategic planning Is responsible for identifying hardware component and configuration that allow software o operate Typical IS operational plan contains: Mission and objectives of IS function Summary of info needs of the functional areas and org as a whole Constraints of the IS function in terms of technological and personnel limitation Long term plan indicating summary of the system needed by the company to reach org goals Short term listing the current IS projects and a detailed plan of projects to be developed or continued during current year

System Request Is a written request from mgt or end users which triggers the start of the SDLC Includes 5 considerations: Project Sponsor Business needs Functionality Expected value Special issues

Functionality of the system Project sponsor Is the person who usually initiates the proposed system project having an interest in seeing that the new system succeeds Could be the person who work throughout SDLC to ensure project in right direction Business needs Describes why the IS should be developed explaining to the information steering committee why org should fund the project concerned Functionality of the system Describes what the proposed IS will do. Eg. What features and capabilities the IS will need to have Expected values System request will include expected value to be gained from the proposed system Specify rough estimations of tangible and intangible benefits

Special issues Include determining the system constraints that must be met for the proposed systems project to be viable Proposed systems project needs to be completed within specific deadline and budget

Information System Steering Committee Developing IS must get support from top mgt A good approach is to have IS steering committee that represents top mgt and all functional areas within org Responsible for overall planning and control of system development Existing IS should be reviewed on a regular basis to assess it adequacy The committee may receive request to investigate such as error in payroll , request to design new inventory system etc They will need to review these system requests and determine which one should be considered for further study Other than evaluates system request, they also provide guidance throughout the SDLC

Preliminary Investigation The first step in SDLC is to do survey or preliminary investigation of existing system It is important t understand existing system before proposing for changes or modifications It is important to establish relationship with the users because the success of a system depends on users acceptance In order for a system to serves the needs of the org, the development team must: Find out and analyze causes of business problems rather than just deal with symptom

Ensure that needs of all affected by new system are considered Consider how the new system will integrate with other system in the org Nature of problem In preliminary stage, the nature of problem must be determined Sometimes what appears to be a problem only a symptom. The problem should be treated and not the symptom

Scope Establishing scope is important because problems tends to expand if no firm boundaries are established It is necessary to stay within budget and schedule If scope is too broad , the project will never finished. If the scope is too narrow, user needs may not be met The scope will define: Part of system to be changed Part that is outside its control Restriction on the project if any Resources to be made available Resource limitations

Goal Must be developed within practical bounds of the org One way to ensure this is to break down project goal into more detailed sub- goal that consider org constraints These sub- goals will be used in later phases to guide detailed analysis and design Another guideline for goal definition is the identification of deficiencies in the existing system The project goal is to remove such deficiencies The project goal , scope and constraints are also known as term of reference

Obtaining Information Organization Chart A good starting point to find out who is who and who is doing what Help to determine appropriate individuals to interview during preliminary investigation Should verify that the chart is updated and accurate Obtaining Information When investigating IS, we should gather info. Through some means. Eg.interview Note that preliminary investigation is not designed to learn everything in detail

Prepare a Preliminary Investigation Report After conducting preliminary investigation, the findings must be reported to the Information System Committee or top mgt Preliminary investigation is a brief phase and should result in some recommendations suggesting: Drop the matter Fix the problem immediately (if it is simple ) Authorize to go on the next phase for a closer look Typical preliminary investigation report should include: What is found concerning the operation of the system in question The problems that present or appear to present in the system Recommendations for future action