Ministry of Land, Infrastructure, Transport and Tourism Information for redesign of airspace composition Yoshimichi HAMAHATA ATC division, JCAB THE EIGHTH.

Slides:



Advertisements
Similar presentations
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Advertisements

1 Performance Indicators: Selection, Application, and Reporting Presented by John M Rodgers Federal Aviation Administration.
Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
Performance Requirements – Dynamic Density & Dynamic Resectorization Concepts Rich Jehlen Manager, Air Traffic Planning Division Toulouse June, 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Air Traffic Management
NY/NJ/PHL Metropolitan Area Airspace Redesign Implementation Update Presentation to: Eastern Region Aviation Weather Conference By: Don Castonguay Air.
Measures to increase ATC capacity. a) taking all reasonable steps to fully exploit the existing capacity of the air navigation system; b) developing plans.
#4908.If, while in level flight, it becomes necessary to use an alternate source of static pressure vented inside the airplane, which of the following.
Protection Values for VOR-Defined ATS Routes
Analysis of ATC Communication messages Relevant to Altitude Change Requests Electronic Navigation Research Institute IPACG/39, 5-6 February 2014, Fukuoka,
January 2015 GLOBAL COMPETITIVENESS FORUM At the Crossroads How Saudi Arabia can Leverage its Unique Position and Become a Leader in Global Transport Dr.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
System Requirements Review
Air Law 1.05 Airspace References: FTGU pages TC AIM.
Fuel Efficient Air Traffic Control Maryam Kamgarpour, PhD Student Claire Tomlin, Research Adviser John Robinson, NASA Ames Research Center December 17,
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
Air Traffic Control System Team #3. Introduction The purpose of air-traffic control is to assure safe separation between en-route aircraft and the safe.
AIR SPACE Airspace and Airports.
Exploring Control Strategies in ATC: Implications for Complexity Metrics Jonathan Histon & Prof. R. John Hansman JUP Meeting, June 21-22, 2001.
1 Canadian Implementation of ADS-B Out Presentation to ASAS TN2 14 April 2008 Jeff Cochrane Manager, CNS Service Design.
Air Traffic Control (ATC) Know the basic structure, components and functions of the modern air traffic control system 1. Describe the different components.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Presented by Joël Morin to Space Weather Workshop 2008.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Can our ATM systems cope?
CIVIL AVIATION BUREAU of JAPAN Ministry of Land, Infrastructure, Transport and Tourism Air Traffic Management Center (ATMC) Air Traffic Management Center.
CIVIL AVATION BUREAU OF JAPAN Ministry of Land Infrastructure, Transport and Tourism From Domestic to Cross Border ATFM Cross-Border ATFM Workshop Cross-Border.
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
Ministry of Land, Infrastructure, Transport and Tourism Seamless ATM in North & East Asia Hiromu HAYASHI ATC division, JCAB THE EIGHTH MEETING OF THE INFORMAL.
Survey of Traffic and Radar Controller Communication and Workload
Lecture 3: Air Traffic Control Tower
2008 SAA Proprietary and confidential. Page 1 Presentation to Portfolio Committee on Public Enterprises February 2009.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
ATC1 Air Traffic Control ATC2 Purpose of ATC Safety — Conflict Avoidance — Separation of aircraft Visual Flight Rules Instrument Flight Rules Efficiency.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
EUROCONTROL European Organisation for the Safety of Air Navigation.
By: Nan Shellabarger Date: February 28, 2006 Federal Aviation Administration FAA Forecast.
Cape Town 10 October, 2001 The System Durban Port Elizabeth Johannesburg Pilanesburg Cape Town Upington Bloemfontein Kinberly East London George International.
4 th Workshop, Amsterdam, April 2007 page 1 ASPA-S&M in Paris ASPA-S&M in Paris: CRISTAL PARIS and PALOMA results Jean-Marc Loscos, DSNA.
EMISSIONS OPERATIONAL-MEASURES WORKING GROUP CAEP WG-4 REDUCING FUEL BURN THROUGH IMPROVED OPERATIONAL MEASURES Colloquium on Environmental Aspects of.
The outcome of the common report forms for ATFM in East Asia from 2012 to 2014  ( IP ATTACHMENT 2 ) THE EIGHTH MEETING OF THE INFORMAL EAST ASIA AIR.
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Presented to: By: Date: Federal Aviation Administration New York Center System Operations Traffic Flow Management Operations Weather Users Workshop Tom.
MAK – EUROCONTROL WORKSHOP Moscow 1 -2 July 2004 Kenneth Eideberg Stakeholder Implementation Service EUROCONTROL European Organisation for the Safety of.
CIVIL AVIATION BUREAU of JAPAN Ministry of Land, Infrastructure, Transport and Tourism The proposal for the analysis of international air traffic flow.
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
WHY TOKYO EXIST. TOKYO  Tokyo is the capital of Japan, the center of the Greater Tokyo Area, and the most populous metropolitan area in the world. 
UML DESIGN By: J Kamala Ramya Y Devika
Air Traffic Management Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP ATFM and PACOTS Mr. Ryo Yamauchi.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Vertical, lateral separations based on time / distance
Presented by United Arab Emirates
Collaborative Decision Making Module 5 “The Collaborative Environment”
MGMT 203 Airports, Airspace, and Air Traffic Control Management
Unit-3 FLIGHT INFORMATION SYSTEMS
longitudinal separations based on time / distance
1.05 Airspace References: FTGU pages TC AIM
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
SESSION 5: Physical and Environmental Constraints Capacity Constraints in Japan and their implications for Liberalization MORISHIGE Toshiya Director,
Performance Indicators: Selection, Application, and Reporting
RNAV and RNP Strategy in Japan
Collaborative Decision Making “Developing A Collaborative Framework”
Long term vision for Air Traffic Systems CARATS
Efficiency losses through Fragmentation
ATC Clearances Chapter 3 Section C.
Presentation transcript:

Ministry of Land, Infrastructure, Transport and Tourism Information for redesign of airspace composition Yoshimichi HAMAHATA ATC division, JCAB THE EIGHTH MEETING OF THE INFORMAL EAST ASIA AIR TRAFFIC MANAGEMENT COORDINATION GROUP (EATMCG/8) (Hong Kong, May 2015)

Current facility and shape of sectors S04 S34 S02 S03 S01 S31 T01 T02 T03 T04 T05 T06 T07 T15 T10 T11 T13 T12 T24 T09 T14 T27 T22 T26 T17 T28 T23 T21 F01 F03 F11 F16 F02 F08 F17 F05 F06 F07 F15 N06 N01 N02 ● ● ● ● Tokyo ACC 22 sectors Naha ACC 3 sectors Fukuoka ACC 11 sectors Sapporo ACC 6 sectors

 International flight and flying-over are increased. Domestic flight is dependent on the case of GDP.  Even if GDP is estimated low, the number of aircrafts will exceed the limit of air traffic control capacity around  The demand may go up rather than this forecast by further promotion of inbound tourism and the growth of LCC. Demand forecast of air traffic in Japan * Basic case of GDP is set up based on the economic growth rate which is a target of the Japanese future strategy. (economic growth rate is set up to 1.7% from 2010 to 2017 and 2.0% from 2017 to 2032) * In upper case, economic growth rate is set up 1% higher than basic case. In lower case, economic growth rate is set up 1% lower than basic case. The number of IFR flights is that to add military, non-scheduled and cargo flights to those above. Actual Upper case Middle Lower

Expectation of Air Traffic Flow Control ・ On the Ground due to flow control : 270 traffics ・ Average of delays : 25 min or over ⇒ flight cancellation will occur ・ On the Ground due to flow control : 60 traffics ・ Average of delay : 8 min In 2025, airspace capacity in the current airspace configuration becomes the limit. TOKYO international Airport 2012 Air Traffic Flow Control Expectation of 2025 Air Traffic Flow Control

We order to respond to an increase in the future traffic demand, conventional and different, to expand the ATC capacity by the airspace divided by altitude. ・ By difference of cruising, climbing, and descending, we raise the treatment capacity of aircraft. ・ In the high altitude airspace of low workload, the handling number of aircraft makes to increase. ✓ Handling ability of Air Traffic Control was raised by reducing number of aircraft per 1 sector by subdivision of a sector conventionally. ✓ However, enforcement of subdivision beyond this will increase the time and effort of taking over between sectors. Moreover, the airspace that detour for bad weather or turn order of an aircraft becomes less insufficient, and throughput declines conversely. Current airspace composition and future airspace divided by altitude ★ TOKYO OLYMPICS 2022.Apr Apr. 2,000,000+α 1,900,000 【 image of airspace divided by altitude 】 【 western JAPAN divided by altitude 】 【 Restructure of en-route airspace completed 】 Improvement of ATC capacity (measures to expand ) NAHA ACC TOKYOACC SAPPOROACC FUKUOKA ACC Traffic volume 1,800,000 / year 2020 The introduction of New en-route RADAR data processing system FUKUOKA UAC KOBE ACC TOKYO ACC SAPPORO ACC KOBE ACC TOKYO ACC Expand capacity and implementation stage 2020.Oct.(or Nov.)

○ Redesigning the current domestic airspace (En-route and ACA) ○ Decreasing ATC workload totally and improving ATC operational efficiency. Restructure of Facilities Redesign of Airspace Change of Domestic Airspace and Facilities 6

Draft of airspace composition in 2025 w53 w52 w51 s55 w43 w48 w44 w47 w49 n30 n31 n32 n33 s54 s50 e46 e45 e42 e41 n34 n35 n36 e39 e38 T25s e40 h17 h16 h13 h15 h14 h12 h04 h01 h03 h11 h08 h07 h05 h10 h09 h02 h06 1 FUKUOKA UAC ( Upper Area Sector + Oceanic sector ) ・ EAST area ・・・ 11 sectors (within 4 Oceanic sector) ・ WEST area ・・・ 11 sectors (within 1 Oceanic sector) 2 TOKYO ACC ( EAST of JAPAN below FL335 ) ・ North area ・・・ 7 sectors ・ East area ・・・ 8 sectors 3 KOBE ACC ( WEST of JAPAN below FL335) ・ WEST area ・・・ 8 sectors ・ SOUTH area ・・・ 3 sectors ~ Number of sectors ~ SAPPORO 6 TOKYO 22 FUKUOKA 11 NAHA 3 ATMC ( Oceanic )5 total 47 FUKUOKA 22 ( within Oceanic 5) TOKYO 15 KOBE 1 1 total 4 8 current restructured Tokyo ACC Kobe ACC Fukuoka UAC

【 Shape of Upper Area sectors 】 【 Shape of ACC sectors below FL335 】 w53 w52 w51 h17 h16 s55 h13 h15 h14 h12 w43 w48 w44 w47 w49 n30 n31 n32 n33 h04 h01 s54 s50 h03 h11 h08 h07 h05 h10 h09 h02 h06 e46 e45 e42 e41 n34 n35 n36 e39 e38 e40 T25s Draft of airspace composition in 2025

2018 ① Metropolitan airspace around TOKYO and NARITA international airport will be change. (Preparation for the Tokyo Olympics) ② NAHA ACC will move to KOBE building (KOBE aeronautical satellite center building) 2018 ~ 2019 Introduce new en-route RADAR data processing system to 4ACC TOKYO Olympics & Paralympics 2020 ~ 2022 Redesign of western en-route airspace ~ 2025 Redesign of eastern en-route airspace April Redesign of en-route airspace will be completed.