Wind Energy Services Integrating Environmental, Engineering and Constructability Considerations in Wind Power Development Anntonette Alberti, JD Tetra.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

1 Wind Energy Services Environmental Permitting for Wind Energy Facilities Anntonette Alberti, JD Tetra Tech, Inc.
Anntonette Alberti, JD Tetra Tech IPED Financing Wind Power
Museum Presentation Intermuseum Conservation Association.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study A Unique Approach to Corridor Planning.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Wildlife Considerations in Financing Wind Power Albuquerque, New Mexico July 2007 Penny Jennings Eckert, Ph.D.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
TRP Chapter Chapter 4.2 Waste minimisation.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Incident Reporting Procedure
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Pipeline Route Selection. Safety Minute What is a Typical Pipeline Project? There is no typical pipeline project since each pipeline project takes on.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
La Center, Washington: Balancing Pipelines and Populations 1.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
ENERPLUS REGULATORY STRUCTURE (U.S. OPERATIONS) MARCH 2012.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Lynne Welsh Massachusetts Department of Environmental Protection.
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Prepared by: Alex Fisch Planning Services Division.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Incident Reporting And Investigation Program
Jefferson County SA Red Rocks Site Approval
Industrial Assessment Center Database
MPO School Transportation Working Group
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
WSUP (Lightning W Tank #2)
Presentation transcript:

Wind Energy Services Integrating Environmental, Engineering and Constructability Considerations in Wind Power Development Anntonette Alberti, JD Tetra Tech, Inc.

Wind Energy Services Goals of the Presentation Provide an overview of the wind generating facility development process Describe the inter-relation of environmental, engineering and constructability data on each phase of wind farm development Site Screening Conceptual Design Final Design Permitting Construction Operations and Maintenance Stress the importance of designing and permitting constructable and economic wind projects

Wind Energy Services Overview of the Development Process

Wind Energy Services Site Selection/Screening Two most basic questions: Is the site windy? Is the site near adequate take away transmission? If you pass the basic questions then: Investigate availability of land Investigate public and local government acceptability Investigate environmental and engineering considerations – Critical Issues Analysis – Regulatory Strategy

Wind Energy Services Critical Issues Analysis Critical Issues Analysis is a study that: Identifies conditions at the proposed project site Identifies likely siting issues Projects impacts on schedule/budget Provides management strategies to reduce impacts on schedule/budget Components include: Phase I - Desktop studies - Available a la carte (Biological, Cultural, Aesthetics, Geotechnical, Telecommunications, Aviation, Land Use and Permitting, etc.) Phase II – Reconnaissance-level Field Studies Critical Issues Analysis Report - Documents key issues that warrant special consideration - Provides: permit matrix, recommendations, and schedule

Wind Energy Services Common Critical Issues Analysis Omissions Aviation Screening Telecommunications Screening Engineering/Constructability Issues Steep slopes Unstable geotechnical conditions Inadequate work space

Wind Energy Services Moving on to the Conceptual Layout You now know you have a potential wind site! Client should have an idea of the turbine technology that should be used in subsequent studies Move on to the conceptual layout

Wind Energy Services What is the Conceptual Layout? Initial layout that includes turbine locations, access roads, electrical collection system, switchyard(s) and substation(s), transmission lines, O&M building, and construction work areas. Necessary for obtaining land rights, performing preliminary studies, beginning the regulatory process, etc. Typically the developer or the meteorological firm will take a first cut at the conceptual layout of turbines on a constraint map.

Wind Energy Services Defining the Conceptual Layout Preliminary Selection of Turbine Technology Important for turbine spacing Important for defining setbacks Define Project Constraints Wind Land Setbacks from Homes/Infrastructure Engineering/Access Environmental Cultural Political Create Conceptual Layout

Wind Energy Services Constraints Map

Wind Energy Services Typical Setbacks and Constraints Setbacks from sensitive buildings such as residences, schools, hospitals and churches; Setbacks from outbuildings such as barns, garages, and hunting camps; Setbacks from roads, trails, and recreational areas; Setbacks from transmission lines, oil and gas wells, oil and gas transmission, gathering and service lines, sub-surface mining operations and other such infrastructure/facilities; Setbacks from non-participating parcel boundaries; Wetlands, surface waters, and any regulatory buffers around them; Sensitive cultural resources and any regulatory boundaries around them; Locations of special status wildlife or vegetation species and/or critical habitat; Areas of known geotechnical instability; Fresnel zones and other communication/radar related constraints; Areas impacted by air traffic (both civilian and military); and Any other environmental and land use constraints identified for the site.

Wind Energy Services Agricultural Siting Considerations Locate structures along field edges where possible Locate access roads along ridge tops where possible to eliminate the need for cut and fill and reduce the risk of creating drainage problems Avoid dividing larger fields by locating access roads along the edge of agricultural fields All existing drainage and erosion control structures such as diversions, ditches, and tile lines shall be avoided or appropriate measures taken to maintain the design and effectiveness of the existing structures Minimize loss production, crop damage and top soil

Wind Energy Services Engineering Tasks for Conceptual Layout Perform desktop study to evaluate subsurface conditions and geologic hazards Desktop Transportation Analysis Initial Road/collection system Layout Initial Constructability review

Wind Energy Services Moving from the Conceptual Layout to the Final Layout Wind projects have a lot of moving parts: wind resource, property, landowner preferences, setbacks, environmental constraints, cultural resources, engineering constraints, transportation issues, constructability, etc. influence where project facilities will be sited There must be communication among team members and impact on layout must be understood and incorporated The best team includes a meteorologist, a land man, an environmental scientist, an engineer, a constructability expert, and a lawyer Data management with multiple team members can be a challenge

Wind Energy Services What is the Final Horizontal Layout? This layout depicts all project facilities for permitting and land acquisition purposes In many cases, permits must be obtained for exactly what will be built, so a certain amount of engineering must be done at an early stage In a perfect world, micrositing occurs prior to submitting major permit applications and conducting NEPA (or state equivalent) review Failure to do so often means the need to do permit modifications, supplemental EISs, and/or variances during construction In the real world things arent that simple. If possible, permit for flexibility

Wind Energy Services Studies that Support Final Horizontal Layout Field Studies Site specific environmental and cultural fieldwork Site specific engineering field work Constructability considerations Adjust Horizontal Layout and Review for: Wind resource Constructability Engineering Environmental/cultural resources Land owner acceptability Final Horizontal Layout

Wind Energy Services Engineering Tasks for Final Layout If topo exists, may need to commission a fly-over to perform digital photography from which a topographic base map can be prepared Perform site walkdown of all project facilities to assess access feasibility (slope and terrain issues, etc.) Perform geotechnical investigations needed for design of roadway cross-sections, collection system routing and wind turbine foundations

Wind Energy Services The Timing of Studies This is the hardest part of advising a wind client Provide enough preliminary study for siting, but not waste money by providing detailed study on facilities that are not in their final location If possible, only perform full wetland and cultural delineations on the exact locations of project facilities when they are in their final location Consider timing when running visual simulation, shadow flicker analysis, writing up noise study, etc. Because siting is an iterative process, there will always be some inefficiency in study

Wind Energy Services Transportation Study Perform traffic and transportation study, for oversized or heavy deliveries, to assess adequacy of existing offsite roadways, bridges, crossings over culverts, overpasses/underpasses, turning radii, utilities, etc. Within project boundary, determine whether turning radii at existing intersections along the delivery route need to be modified Assess whether surface replacements or upgrades will be required

Wind Energy Services Wildlife Studies Typically include: Avian use surveys Raptor nesting surveys Habitat inventory Threatened, endangered, sensitive species focused surveys if appropriate Bat habitat inventory and/or risk analysis State Natural Heritage database/USFWS T&E species inquiries Plant and noxious weed surveys, if appropriate Studies will vary geographically and by state

Wind Energy Services Wetland Studies It often makes sense to start with reconnaissance level study, saving complete delineation until the layout is final All project facilities must be cleared for wetlands Public road improvements, especially public road culvert replacements, are often forgotten Good communication between wetland staff and design engineers is critical Data management is critical Keep a change log

Wind Energy Services Cultural Resource Studies Consult with State Historic Preservation Office (SHPO) Define the Study Area for Archeology and for Historic Architecture Define the Area of Potential Effects (in consultation with SHPO) as Project is more precisely defined Archeology Historical Architecture

Wind Energy Services Transmission Interconnection Studies Feasibility Study – estimates cost of interconnection System Reliability Impact Study – determines cost and equipment for maintaining reliability of existing system Complete Facility Upgrade Study determines final cost of all interconnection and system upgrade equipment Negotiate Interconnection Agreement with transmission utility

Wind Energy Services Other Important Studies Noise Shadow Flicker Visual Assessment Property Values Conduct Phase 1 Environmental Site Assessment (ASTM AIA Standards) Etc.

Wind Energy Services Permitting Phase -- Local Local At most proposed wind energy project sites, one or more local approvals will be required. The issuing authority may be a local planning commission, zoning board, town, city or village council, county board of supervisors or commissioners, or a similar entity. Although some state siting boards are authorized to override local objections, most must first demonstrate that the proposed project would be consistent with local ordinances and that there is no reasonable objection to the development of the project.

Wind Energy Services Permitting Phase -- Local Local Similar to the state regulatory process, the need for local approvals and the process for obtaining approvals vary throughout the country. In some areas, the local approval process will be time- consuming and the project will be subject to close scrutiny. In contrast, some municipalities require only a building permit. The development team should assess which local approvals will be required and consult with local counsel.

Wind Energy Services Permitting Phase -- State State Numerous state regulatory programs are likely to be triggered by a proposed wind energy project. While such programs often mirror, implement (through delegated authority), or complement similar federal laws, the state version is typically more stringent than its federal counterpart. – Little NEPA – State Siting Statutes – Endangered Species – Wetland Permits – Stream Crossing Permits – Use Authorizations for State Owned Aquatic Land – Historic Preservation – Stormwater – Agricultural Protection – DOT (Roadway) Permitting

Wind Energy Services Permitting Phase -- Federal National Environmental Policy Act Federal Wetland and Waterbody Laws National Pollutant Discharge Elimination System (NPDES) permits for stormwater during construction and operation Endangered Species Act and other Wildlife Protection Laws National Historic Preservation Act Federal Aviation Administration Clearances Federal Land Use Authorizations Federal Transmission Line Interconnections

Wind Energy Services Final Engineering Design – Outline Establish Design Team including Professional Engineer / (Engineer of Record) Develop Design Criteria These should capture design requirements for permits and plans Client should review Preliminary (Draft) Design Drawings Technical Specifications Calculations Final Design PE Sealed Issued for Construction

Wind Energy Services Design Disciplines Design Disciplines Capabilities - Civil Site Civil – Site civil drawing is a base map which is topographic survey obtained from client, or TtEC commissions a survey to develop the base map – Usually perform a pre-design constructability walkdown of WTG locations and intended access road routes to consider site natural features and landowner impacts – Roadway design: layout / direction / cross section / radii – Perform stormwater drainage calculations: Size and locate new culverts and identify soil erosion controls (e.g., silt fencing, stone rip-rap, etc.) – Geotextile Use Structural – Foundation Design – Bridge Improvements

Wind Energy Services Design Disciplines Design Disciplines Capabilities Geotechnical – May need to perform a geotechnical investigation, as a pre-design task, to obtain site specific information at WTG locations and some locations along access roads – Detailed geotechnical investigation report serves as a basis for access road and WTG foundation design – Field Investigations – Geotechnical Reports as design input

Wind Energy Services Design Disciplines Design Disciplines Capabilities Electrical – WTG collector system, – Substation(s) – Transmission Line

Wind Energy Services Final Engineering Design - PE Design requires supervision by licensed civil, structural and electrical PEs (if applicable) PEs typically need to be licensed in State where project is located

Wind Energy Services Preconstruction Finalize Turbine and Long-Lead-Time Item Procurement Identify and requisition long lead time purchased items, such as wind turbines and transformers Approvals for the later plans and permits (Storm Water Pollution Prevention Plan (SWPPP), Spill Prevention, Containment and Countermeasure Plan (SPCCP) and State DOT and US Army Corps wetlands permits) Final Construction Plans and Drawings Secure Construction Contractor Develop Environmental Construction Compliance Plan Develop Mobilization Plan

Wind Energy Services Construction Mobilization – Make sure you have obtained the right pre-construction permissions: Construction Trailers Initial Laydown Areas Sediment and Erosion Control Safety and Environmental Training Send out construction start notifications as required in permits

Wind Energy Services Construction After the Notice to Proceed -- Clearing and Grading Access Roads and Public Road Improvements Foundations Electrical Collection System Transmission Line Substation and Interconnection Facilities Tower and Turbine Erection O&M Building/Visitor Kiosks Commissioning Mitigation Areas Reclamation

Wind Energy Services Construction Engineering support during construction Provide home office support of construction activities following construction release of design drawings, to review contractor submittals and administer Field Change Requests (FCRs) and/or issue Design Change Notices (DCNs) Provide field engineer, preferably from the design team, to assist with construction activities and ensure compliance with the design

Wind Energy Services Tetra Tech, Inc. Tetra Tech, Inc. is a leading, U.S.-based national and international firm delivering solutions in, consulting, construction, engineering, remediation and restoration Publicly traded company (TTEK) – Chosen by Smart Money magazine as one of the 10 Stocks for the Next 10 Years Annual revenues in excess of $1.4 billion; financial strength to stand behind large wind energy projects, including EPC & BOP Over 8,500 employees in 250 offices world-wide Consistently ranked in Engineering News Record as one of the top ten

Wind Energy Services Tetra Tech, Inc. Acquisition of The Delaney Group – a well-respected leader in renewable energy construction Experienced energy staff in all disciplines More than 6 million hours without a lost work day over past two years Injury rate is ¼ the national average 70+ National Safety Council awards Employee health and safety perception rating in top 2% nation-wide ISO Certification for all services First major full-service firm to earn certification with such broad coverage ISO 9001 Certification for Wind Engineering Documented quality procedures and systems to meet global standards and expectations

Wind Energy Services Full-Service Energy Solutions

Wind Energy Services Recognized Expertise Tetra Tech and Nixon Peabody chosen to write American Wind Energy Association (AWEA) Wind Facility Siting Manual Frequent speaker on energy topics at AWEA, World Wind Energy Association and other renewable energy industry events Papers on environmental compliance during construction Included in New York Energy Research and Development Authority (NYSERDA) Wind Energy Tool Kit Published in North American Windpower Journal Through our Energy Management Services Supporting Energy Programs at More Than 60 DoD Installations World-Wide

Wind Energy Services Contact Anntonette Alberti, JD