Status of TC5 (incl. ECSS Transfer) CEN-TC5 WG 6 report to 7th Plenary Meeting CEN-TC5 (status 15 December 2014)
Status of transfer of ECSS to EN 6 newly published ECSS documents sent to UAP Now total of 105 documents transferred (of the 121 agreed) 75 Published by CEN 24 documents completed successfully CEN UAP of which on 6 documents received comments CEN NWI raised for the ECSS TRL Adoption Notice (ECSS-E-AS-11C) CEN-TC5 meeting - 16 December 2014CEN -TC5 WG 6 Status Report2
Sent to CEN on 13 Nov.2014 to start UAP 1.FprEN Space engineering - Materials 2.FprEN Space product assurance - Materials, mechanical parts and processes 3.FprEN Space product assurance - Materials, processes and their data selection 4.FprEN Space product assurance -Quality and safety assurance for test centres 5.FprEN Space product assurance -Storage, handling and transportation of spacecraft hardware 6.FprEN Space product assurance - Design rules for printed circuit boards CEN-TC5 meeting - 16 December 2014CEN -TC5 WG 6 Status Report3
Comments received from new CEN UAP 1.FprEN SpaceWire - CCSDS packet transfer protocol (N294) 2.FprEN Mechanical testing of metallic materials (N278) 3.FprEN Requirements for manufacturing and procurement of threaded fasteners (N279) 4.FprEN Two-phase heat transport equipment (N293) 5.FprEN Satellite AOCS requirements (N288) 6.FprEN Vapour Phase Bioburden Reduction for Flight Hardware (N287) All documents were approved. The comments will be checked and dispositioned by ECSS. NOTE: The number in “()” is the N-number of the CEN UAP ballot paper document. CEN-TC5 meeting - 16 December 2014CEN -TC5 WG 6 Status Report4
ECSS NWIP sent to CEN 7 new ECSS activities were adopted by CEN. 1 new ECSS activity submitted for adoption on 11 Nov CEN-TC5 meeting - 16 December 2014 No.EN numberECSS numberEnglish TitleResolution of CEN NWI Due date NWI Vote Vote NWI started VOTE RESULT 1EN ECSS-S-ST-00C EN series - Description, implementation and general requirements N21216/12/201301/11/2013Adopted 2EN ECSS-E-ST-20-20CInterface requirements for electrical powerN21116/12/201301/11/2013Adopted 3EN ECSS-Q-ST-70-39CWelding of metallic materials for flight hardwareN21001/12/201301/11/2013Adopted 4EN ECSS-Q-ST-70-14CSpace product assurance - CorrosionN25410/03/201427/01/2014Adopted 5EN ECSS-Q-ST-70-15C Space product assurance - Non-destructive testing or non-destructive inspection N25310/03/201427/01/2014Adopted 6EN ECSS-E-ST-31-04C Space engineering - Exchange of thermal model data for space applications N25510/03/201427/01/2014Adopted 7EN ECSS-U-20CSpace sustainability – Planetary protectionN26710/03/201427/01/2014Adopted 8EN ECSS-E-AS-11C Space engineering - Adoption Notice of ISO 16290, Space systems - Definition of the Technology Readiness Levels (TRLs) and their criteria of assessment Sent to CEN- TC5 Secretariat 11Nov2014 CEN -TC5 WG 6 Status Report5