Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.

Slides:



Advertisements
Similar presentations
1 Inducements–Call Blocking. Aware of the Service?
Advertisements

Advanced Piloting Cruise Plot.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
1 7 th Progress Report: The regional and urban dimension of Europe 2020 Lewis Dijkstra Deputy Head of the Analysis Unit DG for Regional Policy European.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Arithmetic and Geometric Means
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Board of Early Education and Care Retreat June 30,
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Solve Multi-step Equations
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
Green Eggs and Ham.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Using one or more of your senses to gather information.
Subtraction: Adding UP
1 DEVELOPMENT SERVICES FY Projects Completed in FY
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
Columbia University Manhattanville in West Harlem Mixed Use Academic Development June 2013.
Presentation transcript:

Manhattanville in West Harlem

Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use Special District Subdistrict A – Project Area

A Cohesive Plan 3 17 Acres integrated into the urban fabric Tied together by an urban layer Supported by contiguous below- grade services A complement to other neighborhood initiatives Exemplifying the principles of PlaNYC Subdistrict A – Project Area *

Columbia is New York Citys seventh largest non-government employer Manhattanville adds: 6,000 New University Jobs On average 1,200 construction-related jobs per year for 22 years 4 Why Grow?

Rezone to allow a wider mix of uses Respect the context of the neighborhood Enliven West 125th Street as a gateway Provide open spaces & ground floor uses Widen sidewalks and view corridors Prohibit walls or gates Revitalization, Improvement, & Redevelopment 5 Why Manhattanville?

17-acre Academic Mixed-Use Area that allows: CU to maintain role as a leading academic institution 5 to 6 million square feet of program space Modern, flexible academic facilities An open urban campus Ends ad-hoc acquisitions causes friction 6 Why Manhattanville?

A Proposed New Campus 7

View From Above 133 rd Street, Looking South 8

Illustrative Site Plan, Full Build 2030 Illustrative Plan, November 2007 DCP Recommended Modifications 9

Illustrative Site Plan, 2030: Publicly Accessible Open Space 10 A THE SQUARE B SMALL SQUARE C THE GROVE D EAST / WEST OPEN AREA E MIDBLOCK OPEN AREA F PUBLIC PARK F

View North Toward Studebaker along the North-South Midblock Open Area – 50 Clear Width 11

12 Illustrative Site Plan, 2030: The Square

Illustrative View of The Square, Looking Southwest 13

Illustrative Site Plan, Existing Building being renovated as-of-right Proposed New Buildings Proposed Building Renovation Within Subdistrict A

Transportation Infrastructure 15

Historic Heritage: Studebaker, Nash, and Prentis 16

17 Historic Heritage: Sheffield Farms and West Market Diner

Sustainable Development 18 As part of plaNYC, Columbia has signed up to be a Challenge Partner Selected as a pilot project for the US Green Buildings Council LEED for Neighborhood Development Agreed to obtain at least LEED Silver certification for all academic and residential projects Memo of Understanding with Environmental Defense to design control measures for construction impacts

Illustrative Site Plan, 2030: The Urban Layer - Active Ground Floor Uses 20

The Urban Layer 21 Business School Mixed-use Academic Building Mind, Brain, Behavior Research

22 Illustrative Ground Floor Plan

23 12 th Ave, Looking North View of 12 th Avenue, Looking North

Illustrative View of 12 th Avenue, Looking North 24

Energy CenterLoading Dock & Parking Physical EducationMTA Bus Depot Diagrammatic Illustrative Section th Street131 st Street132 nd Street

Typical Building Section with Contiguous Basement Typical Building Section without Contiguous Basement Truck docks in central loading area, reached by one 30 curb cut Energy boilers in adjacent, below grade coordinated efficient energy center Continuous, transparent active ground floor Shared science support below grade Parking below grade, reached by four curb cubs Truck docks in all buildings, curb cuts in all Energy boilers in basement, less efficient Active ground floor interrupted, more opaque and reduced by truck docks Science support in above grade space, less efficient Reduced parking in conventional basements (additional curb cuts required) Benefits of a Contiguous Deep Basement 26

27 Illustrative Plan, Axonometric View Looking Northwest Illustrative Plan, June 2007

28 Illustrative Plan, Axonometric View Looking Northwest Illustrative Plan, November 2007

Illustrative Site Plan, Phase Illustrative Plan: Phase I – 2015 Site 1:Academic: School of the Arts, Columbia Business School and JL Greene Center Site 2:Jerome L. Greene Center for Mind, Brain, Behavior Site 3:Academic: Columbia Business School and School of the Arts Site 4:Columbia Business School Site 7:School of International & Public Affairs and University Housing Boundary of Deep Basement Slurry Wall 29

View North Toward Studebaker along the North-South Midblock Open Area – 50 Clear Width 30

View of West 125 th Street, Looking East 31

Revitalizing West 125 th Street 32

View of West 129 th Street, Looking West 33

Enhancing Pedestrian Connections to Waterfront 34

35