THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.

Slides:



Advertisements
Similar presentations
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Advertisements

Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Inst. Overview Alice Preliminary Design Review JRS / 1 Instrument Overview and System Engineering John Scherrer (210) July.
Southwest Research Institute NSF Conference on Small Satellites Plasma Instrument Miniaturization and Integration: Approaches and Limitations C.J. Pollock,
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
THEMIS Instrument Suite PEREFI- 1 UCB, May 2, 2005 THEMIS Solid State Telescope (SST) Instrument Suite PER The THEMIS SST, IDPU and II&T Teams.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 IDPU Mechanical / Thermal Preliminary Design Review Heath Bersch University of California - Berkeley.
THEMIS End of Prime Mission ReviewESA- 1 UCB, November, ESA Plasma Instrument End of Prime Mission Review Dr. James McFadden and Dr. Charles Carlson.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS MISSION CDRESA- 1 UCB, June THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
THEMIS ESA SWT ESA- 1 UCB, Aug ESA In-Flight Calibration and First Results J. McFadden, C. Carlson, D. Larson UC Berkeley SSL.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
Lecture 3-Building a Detector (cont’d) George K. Parks Space Sciences Laboratory UC Berkeley, Berkeley, CA.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
THEMIS peer PDR Summaries 1 October, 2003 MPDR RFA#4 TITLE: Provide Design Information from the Instrument Peer Reviews REQUESTED BY: Joseph Bolek, Mark.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
1 PFP Peer iCDR 2011/5/11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review STATIC Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
SST- Solid State Telescope ESA - Electrostatic Analyzer Science Measurement and Operational Requirements.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
THEMIS SRR Mission Requirements - 1 UCB July MISSION REQUIREMENTS Ellen R. Taylor Mission Systems Engineer Space Science Laboratory University.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Design Fluxgate Magnetometer (FGM) Werner Magnes Institut fuer Weltraumforschung (IWF) Austrian.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Gayle K. Martin November 14, 2016
ESA Plasma Analyzer Instrument
University of California - Berkeley
Bill Donakowski Mechanical Engineer UCB/SSL
SWIA Front End Peer Review
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
University of California, Berkeley
Digital Sub-System Bob Goeke.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Presentation transcript:

THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL

THEMIS MISSION PDRESA- 2 UCB, November, 2003 Overview ESA Plasma Instrument Requirements & Specifications Heritage Design Overview Block Diagram Component Descriptions Mechanical and Thermal Mass and Power Test and Calibration

THEMIS MISSION PDRESA- 3 UCB, November, 2003 Requirements and Specifications Measurement The ESA instrument measures 3-D electron and ion energy distribution functions over the Energy range 10 eV to 30 keV. Typical energy sweep has 16 or 32 energy samples A full 4-pi distribution measurement is produced during each spin Sweep rate of 32/spin gives dense sample of 3-D particle distributions Raw measurements are compressed to selectable “reduced distributions” and moments Implementation Ion and electron “top-hat” electrostatic analyzers have 180 degree field of view Field of view is divided into 8 electron and 16 ion elevation bins Plasma analyzers have hardware programmed functions: sweep rate, sweep waveform, energy range, data collection rates. These functions are set by command. Higher level data formatting and computed products are carried out in the ETC board. Energy sweep is exponential with programmable starting energy and step ratio

THEMIS MISSION PDRESA- 4 UCB, November, 2003 Heritage ESA Instrument Design is based on FAST plasma instrument Nearly identical measurement requirements Well proven design – all 16 FAST ESA detectors remain fully functional after 7 years in orbit (Design requirement was 3 years in high radiation environment) Flight hardware designs and calibration facilities can be used with minor changes Flight spare components are available for critical functions. Design will use existing ACTEL 1020 gate array components. THEMIS instrument uses FAST strategy of “dumb” sensor having hardware defined measurement modes, combined with a “smart” processor-based interface board that performs data formatting and higher level computations. The ETC board provides this intermediate processing for both the ESA and SST.

THEMIS MISSION PDRESA- 5 UCB, November, 2003 REQUIREMENTESA DESIGN IN-1. The Instrument Payload shall be designed for at least a two-year lifetime Compliance. Lifetime has been considered in all aspects of ESA Design. System design and components are direct copy of FAST ESA (still fully functional after 7 years on orbit) IN-2. The Instrument Payload shall be designed for a total dose environment of 33 krad/year (66 krad for 2 year mission, 5mm of Al, RDM 2) Compliance. Common Parts buy for Instrument Payload. Lower radiation dose than FAST ESA has experienced without problem. IN-3. The Instrument Payload shall be Single Event Effect (SEE) tolerant and immune to destructive latch-up Compliance. FAST components were selected for SEE and latch-up immunity and are verified by flight history. IN-7. No component of the Instrument Payload shall exceed the allocated mass budget in THM-SYS-008 THEMIS System Mass Budget.xls Compliance. 2.0 kg Allocated. As built weight for equivalent FAST instrument is 1.92 kgm. IN-9. No component of the Instrument Payload shall exceed the power allocated in THM-SYS-009 THEMIS System Power Budget.xls Compliance. 2.0 W Allocated. As built power for equivalent FAST instrument is 1.75 Watt. IN-13. The Instrument Payload shall survive the temperature ranges provided in the ICDs Compliance. ESA is designed and will be tested to comply with the ICD requirements. IN-14. The Instrument Payload shall perform as designed within the temperature ranges provided in the ICDs Compliance. ESA is designed and will be tested to comply with the ICD requirements. Mission Requirements

THEMIS MISSION PDRESA- 6 UCB, November, 2003 REQUIREMENTESA DESIGN IN-16 The Instrument Payload shall comply with the Magnetics Cleanliness standard described in the THEMIS Magnetics Control Plan Compliance. THM-SYS-002 Magnetics Contamination Control Plan. IN-17 The Instrument Payload shall comply with the THEMIS Electrostatic Cleanliness Plan Compliance. THM-SYS-003 Electrostatic Cleanliness Plan IN-18 The Instrument Payload shall comply with the THEMIS Contamination Control Plan Compliance. THM-SYS-004 Contamination Control Plan IN-19. All Instruments shall comply with all electrical specifications Compliance. THM-IDPU-001 Backplane Specification. IN-20. The Instrument Payload shall be compatible per IDPU-Instrument ICDs Compliance. THM-SYS-105 ESA and SST Electronics Card (ETC) Specification. Verification Matrices to be completed. IN-21. The Instrument Payload shall be compatible per the IDPU-Probe Bus ICD Compliance. THM-SYS-101 IDPU/ESA-to-Probe ICD. Verification Matrices to be completed. IN-23 The Instrument Payload shall verify performance requirements are met per the THEMIS Verification Plan and Environmental Test Spec. Compliance. THM-SYS-005 Verification Plan and Environmental Test Specification preliminary draft. Verification matrix to be completed. IN-24 The Instrument Payload shall survive and function prior, during and after exposure to the environments described in the THEMIS Verification Plan and Environmental Test Specification Compliance. THM-SYS-005 Verification Plan and Environmental Test Specification preliminary draft. Verification matrix to be completed. Mission Requirements

THEMIS MISSION PDRESA- 7 UCB, November, 2003 REQUIREMENTESA DESIGN IN.ESA-1. The ESA shall obtain partial moments of the 3D plasma electron and ion distributions in the magnetotail plasma sheet Compliance. ESA will provide the ETC board with plasma measurement data sufficient for computing the required moments. IN.ESA-2. The ESA shall measure differences in velocity and ion pressure between probes in the magnetotail plasma sheet Compliance. ESA will provide the ETC board with plasma measurement data sufficient for computing the required moments. IN.ESA-3. The ESA shall measure ion and electron distributions that are associated with the current disruption process Compliance. ESA will provide the ETC board with plasma measurement data sufficient for computing the required moments. IN.ESA-4. The ESA shall be capable of measuring ion moments and differences of those moments in the magnetosheath and solar wind. Compliance. ESA will provide the ETC board with plasma measurement data sufficient for computing the required moments. Solar wind moments will be limited to a specific range of velocity and density consistent with instrument saturation. Science Requirements

THEMIS MISSION PDRESA- 8 UCB, November, 2003 REQUIREMENTESA DESIGN IN.ESA-5. The ESA shall measure ions and electrons over an energy range of 10eV to 30 keV Compliance. Satisfied by design. IN.ESA-6. The ESA energy sampling resolution, dE/E, shall be better than 25% FWHM for ions and electrons Compliance. Satisfied by design. IN.ESA-7. The ESA shall be capable of measuring ion and electron energy flux of 10^4 to 10^9 keV/cm^2/s/Str/keV Compliance. Satisfied by design. IN.ESA-8. The ion ESA geometric factor shall be attenuated in the solar wind to avoid saturation. Compliance. High fluxes of solar wind ions will be accommodated by small area anodes in the equatorial view directions. IN.ESA-9. The ESA shall supply partial energy moments at one spin time resolution. Compliance. Satisfied by design. IN.ESA-10. The ESA shall have a 180 deg. elevation FOV with a minimum angular resolution of 22.5 deg. Compliance. Satisfied by design. IN.ESA-11. To resolve the solar wind, the ESA shall have a FOV with enhanced resolution of ~ 6 deg. Compliance. Satisfied by design. IN.ESA-12. The ESA shall produce measurements of particle distributions over the entire 4pi steradian field of view in one spin period. Compliance. Satisfied by design. IN.ESA-13. ESA calibration shall ensure <20% relative flux uncertainty (not including statistical uncertainty) over the ranges defined above. Compliance. Satisfied by on-orbit calibration of plasma density with wave measurements. Performance Requirements

THEMIS MISSION PDRESA- 9 UCB, November, 2003 ESA Development Team ESA Systems Definition and Specifications: Charles Carlson, UCB Analog and Digital Systems: Charles Carlson, UCB Mechanical and Thermal: Bill Elliot, Paul Turin Ground Support Equipment: Jim Lewis, UCB Power Systems (LVPS, HVPS): Peter Berg, UCB Thermal: Chris Smith, UCB Calibration and Test Facilities: Mario Marckwordt, UCB IDPU Instrument Interface: Robert Abiad Flight Software: Frank Harvey, UCB ESA Support Functions Probe Interfaces: Ellen Taylor, UCB Reliability and Quality Assurance (R&QA): Ron Jackson, UCB Parts Engineering: Jorg Fischer, UCB

THEMIS MISSION PDRESA- 10 UCB, November, 2003 Design Overview THEMIS Uses FAST ESA Design (1/2 of a FAST module) Modular for efficient testing, assembly and repair Entrance sealed and nitrogen purged Changes from FAST : Ion Detector Anode pattern Cover Release Mechanism (TiNi Nanomuscle-125) Specifications: 180 degree elevation field of view with a minimum angular resolution of 22.5 degrees. To resolve the solar wind the IESA will have a field of view with enhanced resolution of approximately 5.62 degrees. Pulse Amplifiers Digital Interface & HV Sweep HV Supplies } MCP

THEMIS MISSION PDRESA- 11 UCB, November, 2003 Block Diagram Electronics design is nearly direct copy from FAST Three circuit modules plug together for efficient assembly and test MCP pulse amplifiers are Amptek A121 with programmable gain All discrete logic, counters, and HV DAC drivers are Actel FPGAs HV supplies are a mature design built at UCBSSL

THEMIS MISSION PDRESA- 12 UCB, November, 2003 Analyzer/Anode/Preamp FAST ESA module Themis will use FAST module design IESA/EESA Analyzers Analyzer deflection plates Aperture closer mechanism UV rejection Cu-Black coating Nitrogen purge system Anode Boards Mounts MCPs HV Interface connectors HV coupling capacitors Preamp Board AMPTEK A121 preamps Actel logic arrays Anode and Logic board interfaces

THEMIS MISSION PDRESA- 13 UCB, November, 2003 MCP/Anode Board Assembly Top Bottom Anode boards includes: MCP Mounting Hardware “Spring finger” clamp rings HV electrode connections Nitrogen purge plumbing HV Interface HV Plugs and wiring HV filter capacitors Bias resistor Preamp Interface Limit resistors & clamp diodes Preamp interface connector Materials Polyimide/glass PCB PEEK mounting rings KAPTON spacers Gold plated BeCu springs

THEMIS MISSION PDRESA- 14 UCB, November, 2003 MCP Preamp/Accumulator Preamp board includes: 24 AMPTEK A121 hybrid preamps 3 Actel logic arrays contain: 24 x 14 bit accumulators Command/Data Interface Command interpreter Test pulse generator Commandable selective anode blocking MCP Anode board interface Radiation “spot shielding” for preamps

THEMIS MISSION PDRESA- 15 UCB, November, 2003 HV Sweep & Digital Interface HV Sweep/ Interface board includes: Main data interface to ETC board and IDPU power board HV fixed and sweep supply control HV Sweep waveform generator (Amptek HV-601 high voltage optocouplers) Housekeeping multiplexer Plug-in interface to anodes and HV supplies FAST Sweep/Interface Board Themis board is about 30 % shorter length

THEMIS MISSION PDRESA- 16 UCB, November, 2003 FAST HV Supply Assembly FAST HV Interface Board (mounts on back side of Sweep/Interface board) Themis board is about 30 % shorter length HV Assembly board includes: Four HV supplies with interface mother board (FAST example has 6 supplies) HV supply assembly and Digital interface boards share structural mount plate HV supplies have HV sockets that mate directly with HV plugs on HV sweep board and on anodes. Themis option may share a single positive/negative raw supply, reducing total requirement to 3 supplies. Decision pending prototype test and risk evaluation

THEMIS MISSION PDRESA- 17 UCB, November, 2003 HV Supply and VMI Multiplier A single FAST HV Supply shown with a sample FAST HV multiplier module and a candidate commercial replacement module from VMI (HM402N10). A total of 25 HV supplies on FAST have operated without incident for seven years. The VMI multiplier is an attractive replacement for the SSL fabricated component: Huge saving of in-house technician work VMI part has been tested for use on STEREO The multiplier is physically and electrically compatible with existing FAST design VMI part is smaller – will allow single plus/minus supply for raw sweep source

THEMIS MISSION PDRESA- 18 UCB, November, 2003 ESA S/C Interface Requirements Interface to Spacecraft ESA Mounts to IDPU (0.12 Watts/deg C Coupling) Thermal Joint TBD “Foot” Mounts to Bus ESA Extends Through Corner Panel With Clearance and Some Sort of Radiation Closeout Constrained By 3.25” Furthermost Stand-Off of the ESA from the Corner Panel ESA Should Be Very Close to the Middle (Top to Bottom) of the Corner Panel (Science Requirement)

THEMIS MISSION PDRESA- 19 UCB, November, 2003 Thermal - ESA Temperature Limits Predictions from Swales Cold prediction from 3 hour eclipse orbit Hot prediction from hottest orbit and attitude Average operating temperature around 30 °C Better predictions await more complete instrument thermal models Survival (°C) Predictions (°C) Margin (°C) Eclipse-Op Science-OpColdHotColdHot

THEMIS MISSION PDRESA- 20 UCB, November, 2003 Test and Calibration UCBSSL has automated calibration facilities (FAST, WIND heritage) that will be used for THEMIS ESA calibrations Facility uses cryogenic pumped vacuum chambers with computer controlled ion and electron guns and 3-axis manipulators All six ESA units (5 flight/ 1 spare) use identical calibration procedures adapted from FAST Full environmental testing (Thermal / Vacuum, EMC, Vibration) 3 Axis Manipulator Calibration Chamber