DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.

Slides:



Advertisements
Similar presentations
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
Advertisements

Unit III Module 6 - Developing Age Exploration Tasks
ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to identify any challenging compliance.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
10 CFR Part 26, Subpart I Managing Fatigue 10 CFR Part 26, Subpart I Managing Fatigue Kamishan O. Martin, Human Factors Engineer Office of Nuclear Reactor.
1 Safety Instrumented Systems ANGELA E. SUMMERS, PH.D., P.E. SIS-TECH Solutions, LLC We’re Proven-in-Use.
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
NFPA-805 Duke Power Transition – Lessons Learned
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
DELIVERING SAFE & RELIABLE OPERATION
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 TR#2 “Second Edition” Long Beach Meeting April 28, 2004.
BRC Food Safety Quality Management System Training Guide
Pipeline Qra Seminar Title slide Title slide.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Deployment of a Margin Model at Comanche Peak Presented.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
1 Comprehensive Pump Testing Challenges. 2 Purpose This presentation will discuss:  Hardships encountered while implementing comprehensive pump test.
What is your IST Organizational Culture like? by NextEra Energy Seabrook Station LLC Bob Parry, Tim Couture, and Debbie Masters Inservice Test Owner’s.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Application – Identifying, Listing Equipment, and Documentation
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
ISTOG INDUSTRY ISSUES Interactive Session Gregg Joss (Ginna Station Vice Chair ISTOG) Ron Lippy (True North Consulting ISTOG Facilitator)
ISO Registration Common Areas of Nonconformances.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
2010 CMBG Conference Temporary Design Changes Tony Hathcock Duke Energy - Oconee June , 2010 Charlotte, NC.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Temelin NPP Risk Panel A PSA and Safety Monitor Application Workshop Information.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Refueling Spillage Control For Small Off-Road Engines Air Resources Board August 6, 1998 Dean Bloudoff.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Practical examples of RIDM application.
Failure Modes, Effects and Criticality Analysis
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Common Problems with Performance/Testing of Batteries
Recent Developments Regarding Control Room Habitability Assessment
Safety Instrumented Systems
Date of download: 10/15/2017 Copyright © ASME. All rights reserved.
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance Case Studies Version 1.0, May 2015 This material was prepared by the IAEA and co-funded.
Safety Instrumented Systems
Identification/control of permanent SSCs which are outside of Design Control DESIRED OUTCOME: This session is an opportunity to benchmark programs for.
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Margin Management Configuration Management Benchmarking Group
Control Access into High Radiation Areas and Locked High Radiation Areas STE RP and 03.05, Rev #0.
TRTR Briefing September 2013
Presentation transcript:

DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION

QUESTION 1 A recent ISTOG Forum question: Q: When is the need to use electrical jumpers (to satisfy permissive or interlock signals) sufficient basis for deferring quarterly stroke time test to cold shutdown and/or refueling? A: It is a case-by-case situation. Some guidance is in NUREG 1482 R1. Risk considerations could be used to justify a written practicability justification for cold shutdown. It was noted that if this is being performed already, precedent has been set and it would be hard to justify not doing the test anymore.

QUESTION 2 Q: Considering the following ISTC-1200 statement, what is meant by the term “specific function”? For example, most vent and drain valves in safety related systems have a function to remain closed for system pressure boundary/inventory purposes. Does this mean they are NOT exempt? A: No, specific function refers to an active or passive function to perform the function described by ISTA An example presented 2 MOV’s used only for maintenance in a pipeline that cause the system to be declared inoperable if they are closed for use. They fail open unless the system is inoperable. No consensus could be reached to say these are exempt or passive (50% to 50% answers). ISTC-1200 Exemptions The following are excluded from this Subsection, provided that the valves are not required to perform a specific function as described in ISTA-1100: (a) valves used only for operating convenience such as vent, drain, instrument, and test valves; (b) valves used only for system control, such as pressure regulating valves; and (c) valves used only for system or component maintenance. Excerpt from ISTA-1100 (a) pumps and valves that are required to perform a specific function in shutting down a reactor to the safe shutdown condition, in maintaining the safe shutdown condition, or in mitigating the consequences of a accident

QUESTION 3 Poll: Does your plant treat IST related pump and valve tests as Tech Spec surveillances (e.g., Tech Spec scheduling, failure to meet acceptance criteria renders component inoperable and LCO actions are considered)? Only 1 site answered no. Site answering no uses Improved Standard Technical Specifications (TS 5.5.8). Only SR required items referencing the IST Program are in the Surveillance Program.

QUESTION 4 Q: Can vibration measuring equipment be set up with a built-in averaging process (like display of total inches/sec. as averaged over last 20 readings 5mSec. apart) and still meet Code instrument requirements? A: No vibration averaging techniques are allowed by the ASME Code (Peak for velocity, Peak to Peak for displacement).

QUESTION 5 Q: Would a full stroke prior to a timed stroke of an MOV or AOV be considered unacceptable preconditioning? AC or DC? A: If the valve has to be exercised quarterly, it is stroked 3 months prior to the stroke time test, which is acceptable. If it is part of the same Inservice test procedure before conducting the stroke time test, it is unacceptable. Everything in between must be considered on a case-by-case basis.

QUESTION 6 Q: Is there some Nominal time frame for IST or CV engineer to update Check Valve Condition Monitoring Programs (add new “history” work, inspections) monthly – yearly – 10 years? A: One example used a 1 year PM. No requirement exists. Evaluation after failure is required. Poll was about 50% to 50% in terms of formal requirement existing.

QUESTION 7 Q: Is a PIT test required for a control valve with position indication and is not required to be fail safe? A: It is exempt ISTC-1200(b), assuming there is not safety function to go from fully open to close or close to open.

QUESTION 8 Q: Can analysis be performed to determine operability to next refueling outage when a pump exceeds alert limit and can only be tested during refueling outage? A: Yes, but the test frequency must be doubled. Relief would be required if it is a comprehensive pump test to justify not shutting down to perform the pump test unless the analysis section could be used to justify the pump is not degraded and new reference values established.

QUESTION 9 Preconditioning: (a)Q: How many plants have a defined process to review and evaluate preconditioning? A: 75% of attendees. (b)Q: What do most sites use as a definition of “immediately prior”? A: Needs a survey. (c)Q: CM work orders w/o declaring component in- op? A: Needs a survey.

QUESTION 10 Q: NUREG 1482 Section scheduling of inservice tests indicates it is acceptable to extend a test interval for safety and relief valves to coincide with the refueling outage. Is this a capability that sites would find valuable to retain? A: Would be useful for the 20% sample requirement. Proposed ISTA change for 25% grace with 6 month max will address other areas.