Cortez Sanitation DistrictSeptember 2002 Arber Cortez UV Disinfection Steven M. Ravel, P.E. Travis E. Meyer, P.E. Richard P. Arber Associates.

Slides:



Advertisements
Similar presentations
1 Bid Evaluation - Goods Objective Secure goods/services at most economical cost Price only one factor Other optional factors Time of delivery/completion.
Advertisements

Newcastle Water Pollution Control Plant
Ultraviolet Light Process Model Evaluation
Ultraviolet Disinfection - BIO-SECURITY Specification, Operation and Maintenance in a New Era 2010 Regional Aquatics Workshop Presented By: Adrian Megay.
Proven, Affordable, Environmentally Friendly …defining UV innovation…
DISINFECTION: APPROPRIATE TECHNOLOGIES FOR WASTEWATER TREATMENT KA SAMSON Presented at the APPROPRIATE TECHNOLOGY CONFERENCE BMW CENTRE, CAPE TOWN, 3-4.
Engineers scientists architects constructors Case Study UV Disinfection Interference at Big Rapids WWTP 83 rd Annual Conference Michigan Water Environment.
Engineers scientists architects constructors Case Study UV Disinfection Interference From Industry MWEA Industrial Pretreatment Seminar October 24, 2007.
Wastewater Permit Renewals
Anne Arundel County Department of Public Works
C. T Calculation Math for Water Technology MTH 082 (pg. 468) Math for Water Technology MTH 082 (pg. 468) “Required by Law”
Prepared by WMC Consulting Engineers Inc. John A. Wengell.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Upgrade Project.  Old Rexnord bar screen removed and replaced with new Headworks bar screen.  Screenings compactor installed  Chlorine Disinfection.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
UV Disinfection for Unfiltered Surface Water Regulatory Compliance Kevin Castro, PE | GHD Image placeholder.
UV Systems; Alternative Disinfectant to Free Chlorine
Chlorination Chemistry; Considering Chloramines and Free Chlorine
Driving Toward Energy Efficiency Emerson Process Management Novaspect. Inc. June 22 / 23, 2010 Steam.
Innovative Green Building - High Rise Residential - Water Reuse American Water Applied Water Management Group.
Silberschatz, Galvin and Gagne  2002 Modified for CSCI 399, Royden, Operating System Concepts Operating Systems Lecture 19 Scheduling IV.
Wastewater Treatment & Collection System Improvements.
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Chlorine Contact Chambers; Chlorine Mixing and Contact Time for Ct Harris County Wastewater.
The City of North Bend Sanitary Sewer System
New Approaches to Developing Local Limits Industrial & Hazardous Waste Committee Meeting July 18, 2001 by Richard W. von Langen, P.E. New Approaches to.
Math for Water Technology MTH 082 (pg. 468)
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
Prevention of filaments with aluminium or ozone at Klagshamn WWTP? Marika Wennberg*, Ulf Nyberg* and Karin Jönsson** * VA SYD **Lund University.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Wastewater Collection System Optimization An Innovative Approach to Capital Improvement Planning COPYRIGHT – OPTIMATICS PTY LTD
O Objective:  Asses the feasibility of achieving the disinfection requirement of the primary effluent overflow during wet weather events through the existing.
Hawke’s Bay Refrigeration
Volvo Group North America, LLC Reuse of Wastewater - A Manufacturer’s Experience Steve Pierett, Env.Mgr. CEM, CRM, CP EnMS-Industrial.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
COMMERCIAL BOILERS. HIGH MASS Advantages Flow Indifferent Primary Piping Resistant to low return temperature issues Up to 1200 H.P. 20 plus year life.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Operator Reports for New Technologies Vanessa Wike, P.E. Statewide Engineering Coordinator (907) Cordova St. Anchorage, AK 99501
Christopher Hill December 6, 2006 CE 679
Deborah Helstrom, P.E. Industrial Permits Team Wastewater Permitting Section Membrane Bioreactors Treatment.
Representative Sampling. Samples vs. Populations The population is the total or all of the possible answers we might get by sampling. All of the individuals.
Process Testing for Household Water Treatment Invention Megan N. Heinze, Thomas D. Jacroux, Richard P. Oleksak College of Chemical, Biological, and Environmental.
Trojan UV Swift SC. Introduction Designed to meet the needs of the small community, the TrojanUVSwift™SC is ideally suited for smaller flow applications.
LOW D.O. OPERATION: EFFECTS ON BIOLOGICAL PHOSPHORUS REMOVAL, OXYGEN TRANSFER EFFICIENCY, DENITRIFICATION, AND ENERGY SAVINGS.
CEE 426 September :05 PM UW Madison Room _____ Engineering Hall Energy in Wastewater Treatment Plants Thomas E. Jenkins, P.E. 1.
Tools to Control Energy Use through O&M Practices Wastewater/Water Sustainable Energy Cohort, October 11, 2012 Presentation by Walt Mintkeski, P.E.
MONTHLY OPERATIONS REPORT February 2016 Town of Discovery Bay, CA 2373 Days of Safe Operations 107,602 worked hours since last recordable incident.
Aeration System Opportunities Dave Reardon, PE, ENV SP HDR National Director - Water Sustainability WW/W Sustainable Energy Cohort-Session 5 January 31,
The Public Health and Safety Company™ NSF International Onsite Wastewater Treatment Unit Program Standards, Testing and Certification Update.
CTC 450 Review WW Collection Systems Types of pipes Installation.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
5th Annual Water and Sanitation Workshop
Actuator Edi Leksono Department of Engineering Physics
Recycled Water Project Basis of Design Report
Strategic Capacity Management
Manage costs and schedules for system replacement due to obsolescence
High Octane Low Carbon Solution for tomorrow… today
Background Appledore Island, ME: Aerial View.
Wastewater Facilities Upgrade Project
Mohr Separations Research, Inc.
Operations Management
Draft BMP Verification Protocols for Non-significant WWTPs Combined Sewer Overflows On-site Wastewater Treatment Systems CBPO Wastewater Workgroup.
Capital Improvement Plan April 9, 2018 Status Update
WATER SAVING PRODUCTS & PROGRAMS
Presentation transcript:

Cortez Sanitation DistrictSeptember 2002 Arber Cortez UV Disinfection Steven M. Ravel, P.E. Travis E. Meyer, P.E. Richard P. Arber Associates

Cortez Sanitation DistrictSeptember 2002 Arber Introduction Background Selection of UV Lamp Type Specifying UV Dose Verification of UV Dose

Cortez Sanitation DistrictSeptember 2002 Arber Background New WWTP for Cortez Sanitation District Treatment Train –Headworks –Extended Aeration –Secondary Clarification –UV Disinfection

Cortez Sanitation DistrictSeptember 2002 Arber Background Design Flows –Average: 1.8 mgd –Peak Month: 2.1 mgd –Peak Hour: 7 mgd

Cortez Sanitation DistrictSeptember 2002 Arber UV Lamp Types Considered Medium Pressure Low Pressure / Low Intensity Low Pressure / High Intensity

Cortez Sanitation DistrictSeptember 2002 Arber Medium Pressure Advantages –Lowest Number of Lamps Required –UV Intensity Adjustable –Sleeve Wipers Available –Low Space Requirement –Open Channel and Closed Pipe Systems Available

Cortez Sanitation DistrictSeptember 2002 Arber Medium Pressure Disadvantages –Low Efficiency (Approximately % –Higher Capital Cost (for these flow rates) –Require warm-up period on start- up

Cortez Sanitation DistrictSeptember 2002 Arber Low Pressure / Low Intensity Advantages –Low Capital Cost –High Efficiency (Approximately 40%) –Simple Design / Simple Operation

Cortez Sanitation DistrictSeptember 2002 Arber Low Pressure / Low Intensity Disadvantages –Highest Number of Lamps Required –UV Intensity Not Adjustable –Sleeve Wipers Not Available –High Maintenance (Lamp Replacement and Cleaning) –High Space Requirement

Cortez Sanitation DistrictSeptember 2002 Arber Low Pressure / High Intensity (Selected) Advantages –Low Capital Cost –High Efficiency (Approximately 40%) –Less Lamps Required than Low/Low (Approximately 1/4) –UV Intensity Adjustable –Sleeve Wipers Available

Cortez Sanitation DistrictSeptember 2002 Arber Low Pressure / High Intensity (Selected) Disadvantages –Relatively Short Track Record Compared to Low/Low and Medium –More Lamps Required than Medium

Cortez Sanitation DistrictSeptember 2002 Arber Specifying UV Dose EPA UVDIS Computer Model BioAssay Performance Based

Cortez Sanitation DistrictSeptember 2002 Arber UVDIS Computer Model Advantages –Computer program easy and fast to run –Theoretical model developed by EPA

Cortez Sanitation DistrictSeptember 2002 Arber UVDIS Computer Model Disadvantages –Program designed for Low/Low systems May not be as applicable for Low/High or Medium Systems –Model results must be adjusted using high safety factors to ensure system will perform as required

Cortez Sanitation DistrictSeptember 2002 Arber BioAssay Advantages –System sized based on dose response curve for actual equipment to be installed –Dose response curve developed for site specific wastewater effluent quality

Cortez Sanitation DistrictSeptember 2002 Arber BioAssay Disadvantages –No Standard Protocol for BioAssay Detailed protocol must be developed to compare results for different systems –Expensive and Time-Consuming –If MS-2 Phage used for bioassay, correlation must be developed to translate results for fecal coliform

Cortez Sanitation DistrictSeptember 2002 Arber Performance Based Advantages –Specify what you want the system to do, let manufacturers design their system to do it –Most direct method to specify

Cortez Sanitation DistrictSeptember 2002 Arber Performance Based Disadvantages –Relying on manufacturers to design adequate system –Must determine a method to check performance in the field

Cortez Sanitation DistrictSeptember 2002 Arber Cortez Sanitation District Pre-selection of UV System based on: –Primary UV Dose Criteria: Performance for Fecal Coliform In: 500,000/100 mL Out: 200/100 mL –Secondary UV Dose Criteria: Min UV Dose of 30,000 µw/cm 2 based on UVDIS

Cortez Sanitation DistrictSeptember 2002 Arber Cortez Sanitation District –Other Design Criteria Minimum Flow: 1 mgd Average Flow: 1.8 mgd Peak Hydraulic Flow: 7 mgd Peak Process Flow: 5 mgd UV Transmittance: 65% TSS: 30 mg/l Number of Channels: 2 Number of Banks/Channel: 2

Cortez Sanitation DistrictSeptember 2002 Arber Comparison of UV Systems Mfr AMfr B # of Lamps4864 Capital Cost$100,000*$110,000 Annual O&M Costs Electricity$1,400$3,000 Lamps$1,900$3,200 Total$3,300$6,200 NPV (20 yrs, 6%)$140,000$180,000 * Includes Separate Sunshade Structure for Ballast and Controls

Cortez Sanitation DistrictSeptember 2002 Arber Verifying UV Dose During Performance Test, Need to Account for Differences (Design vs. Actual) in: –Flow –UV Transmittance –Lamp Age (70% output) –Fecal Coliforms

Cortez Sanitation DistrictSeptember 2002 Arber Flow Adjustment Adjust UV system output in proportion to difference in flow Example: Design flow = 5 MGD, Actual flow = 1 mgd: Adjust UV system output to 20% of maximum

Cortez Sanitation DistrictSeptember 2002 Arber Transmissivity Adjustment Adjust UV system output based on correlation between design UVT and actual UVT

Cortez Sanitation DistrictSeptember 2002 Arber Fecal Coliform Adjustment Two Options –Spike UV influent to bring fecal coliform up to design number –Lower effluent fecal coliform requirement to achieve same log reduction as design

Cortez Sanitation DistrictSeptember 2002 Arber Cortez Sanitation District Turn down UV system output to min during performance test. Schedule test for highest flow, lowest UVT, highest Fecal Record Flow Rate Test Fecal Coliforms (In vs.Out) Test UVT Make determination of performance based on available data

Cortez Sanitation DistrictSeptember 2002 Arber Conclusions Low Pressure / High Intensity best solution for Cortez Performance based spec on fecal coliform with min UV dose based on EPA UVDIS Verification of UV Dose using best available data at time of performance test