 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.

Slides:



Advertisements
Similar presentations
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Advertisements

Contract CloseOut.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Submitting an Online Bid with BidCentral Online Bidding for Subcontractors (BOBS) presented in partnership with.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Waste Isolation Pilot Plant Subcontractor Technical Representative Training Best Practice Presentation February 23, 2009 Marty Gonzales Washington TRU.
More CMM Part Two : Details.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Project Close Out CTC-470.
University of Sunderland CIFM03Lecture 1 1 Quality Management of IT CIFM03 Introduction.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
ISO 9000 Certification ISO 9001 and ISO
Implementing Effective Contractor Compliance Programs.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Project Management Best Practices Jason Volz Nebraska Department of Roads Construction Division.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Project Lifecycle Section 6 - Closeout. Project Manager’s Role During Project Close-Out  Ensure that all project deliverables have been completed and.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Keith H. Lundin, Quality Unit-BTS.  Team Mission  Materials Certification Lean Team  Current Status  Materials Certification Issues  Materials Certification.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
9 Closing the Project Teaching Strategies
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
New Grantee/Staff Institute: Lessons Learned Peer Panel WELCOME! California AmeriCorps Training Crown Plaza, LAX– July 22-23, 2015.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 Acquisition Office SYMTRAC TM – The Importance of Compliance presented by Evita J. Fields.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Contract Administration Stacy Sassman Purchasing Agent Iowa State University Cory Harms Associate Director of Purchasing Iowa State University.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
WAP Quality Management Plan NASCSP 2013 Annual Training Conference Phoenix, Arizona September 11, 2013 Barb Klug-Sieja – Bureau Director Hoyt O’Brien –
S Q A.
Allen Hughes State Materials Office
The IR Role in Subscriber Managed Course Reviews QM Institution Representative Training © MarylandOnline, Inc., All rights reserved.
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Close-out Documentation  DISTRICT WIDE REQUIREMENT – The District has implemented the requirement of the “Blue Folder” for final LAP documentation. This.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
BOS – Structures Maintenance Fabrication Initiative Richard Marz, PE Chief, Structures Maintenance WisDOT – Bureau of Structures.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
ASSOC.PROF.DR. İBRAHİM YİTMEN
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
CONSTRUCTION MANAGERS MANUAL
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Payments Report Verification and Request March 2017
The following training presentation is for all subcontract employees and is taken upon joining a contract or task order to which we are the Prime vendor.
DTF CONSTRUCTION MONITORING
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
Construction Management
CST Team Leader Meeting
Materials Certification List
Diversity management system (DMS)
Presentation transcript:

 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives  Sample Lessons

 Why is the Material Coordinator Important?

 Why are Material Coordinator’s Important?  Prevent Delays  Prevent Missing Documentation  Make sure all required tests are done  Prevent Payment Reductions  Assure Quality  Improved Communication  Reduce Final Payment Time  Material Coordinators on both sides working together are the key

 2014 Spec Section Designated Materials Person Designate one person, either a member of the contractor's own organization or acting as an agent for the contractor responsible for the following:

 Communicating contract sampling and testing requirements to subcontractors at all tiers.  Reporting out-of-specification test results to the department as soon as the information is available.  Providing certified reports of test or analysis and manufacturers’ certificates of compliance from subcontractors at all tiers and maintaining certification records as specified in  Ensure that the contractor-designated materials person submits materials information required under the contract to a person the engineer designates. Ensure that the contractor- designated materials person communicates with their department counterpart weekly.

 WisDOT Construction Material Manual (CMM) Responsibilities include: Communicate or meet weekly with the Contractors representative to discuss outstanding materials issues on the contract. Monitor the submittals from the CDMP to ensure timeliness and completeness. Review contractor submittals to verify materials requirements are met. Inform the Project Leader of non-conforming materials issues and discuss actions to be taken. Prepare materials documentation for inclusion into the project files. Provide a project-specific sampling testing guide (E-Guide) to the contractor

 Developed by UW-Platteville Distance Learning  Available April 2014  No cost to participant  Available thru by HTCP website, Coordinator List

 Training Recommended by Lean Gov’t Team as part of solution to reduce close-out time  Will be on-line training / half day  Recommended for DOT and Contractors

 Learning Objectives: 1.Know the Coordinator Roles and Responsibilities 2.Know the Material Certification Process  CMM 8-45 Materials Testing, Sampling, Acceptance  CMM 8-10 – Materials-General 3.Creating an E-Guide incl STSP/SPV items 4.Know “Buy America” requirements

 Learning Objectives Continued: 5.Resolve Non-conformance/Non-performance issues 6.Create DT 1310 report 7.On-line data bases used for material report MRS, MIT, MTS Create 155, 900 and 905 Reports

 QUESTIONS??  WisDOT Point of Contact:  Rich Sorensen