MVWG Report to TSS February 2015 Stephanie Lu, MVWG Chair Seattle City Light.

Slides:



Advertisements
Similar presentations
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
Advertisements

1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Stephanie Lu, MVWG Chair Seattle City Light
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
MVWG Report to TSS January 2013
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Model Validation in Western Interconnection
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
SRWG Chair Report March 2015 WECC HQ
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Jun Wen, MVWG Chair Southern California Edison
Transition Plan for Removing Wind Phase 1 Generic Models
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
MVWG Report to TSS May 2014 Stephanie Lu, MVWG Chair Seattle City Light.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
MVWG Report to TSS August 2014 Stephanie Lu, MVWG Chair Seattle City Light.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
SRWG Meeting 15-2 Power Plant Validation Tools Eric Bakie July 2015.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Jun Wen, MVWG Chair Southern California Edison
Tracy Rolstad TSS Chair TSS Chair Report July 2014 Salt Lake City, UT 1.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Slaven Kincic MVWG March System Model Validation Task Force (SMVTF) System Events for System Model Validation o 21th January event:  Colstrip.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
MVWG Report to TSS May 2016 Jun Wen, MVWG Chair Southern California Edison.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Western Electricity Coordinating Council
Song Wang, MVWG Chair PacifiCorp
Progress Report for the May 26th 17:31 Event
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
WECC Regional Standards Update
Philip Augustin TSS Chair
Slaven Kincic SMVTF Progress Report
CIIMS Proposal for TOP-003 Approach
Phil O’Donnell, Manager Operations and Planning Audits
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
Transition Plan for Removing Wind Phase 1 Generic Models
Reliability Assessment Committee Reliability Workshop Priorities
Specifications Updates and Approval
CMPLDWG Composite Model with Distributed Generation Approval
Jonathan young ColumbiaGrid
Coordinate Operations Standard
NERC LMTF Update Update on Key Topics
Andrew Christensen, SDWG Chair
Jonathan Young SDWG Chair
Reliability Assessment Committee Reliability Workshop Priorities
Western Electricity Coordinating Council Renewable Energy Modeling Task Force REMTF Report to MVWG Abraham Ellis, Sandia March 18, 2015 Salt Lake.
CMPLDWG Composite Model with Distributed Generation Approval
MVWG Report to TSS January 2014
Phil O’Donnell, Manager Operations and Planning Audits
SRWG Chair Report March 2015 WECC HQ
Donald Davies Chief Senior Engineer
Tracy Rolstad TSS Chair
Transition Plan for Removing Wind Phase 1 Generic Models
SRWG Meeting 15-2 Power Plant Validation Tools
System Review Work Group Update to TSS
Presentation transcript:

MVWG Report to TSS February 2015 Stephanie Lu, MVWG Chair Seattle City Light

Recent Meetings MeetingDate LMTF MeetingSep 17-18, 2014 PPMDTF Conference CallOct 15, 2014 HVDCTF Conference CallOct 27, 2014 REMTF MeetingNov 18-19, 2014 LMTF MeetingNov 19, 2014 MVWG MeetingNov 19-20, 2014 MOD-033 Conference CallJan 22, 2015

MVWG Activities Overview Approved Documents Status Update of Models, Documents, and Tools Load Modeling Renewable Energy Modeling System Model Validation Generator Modeling, Testing, and Validation RAS Modeling HVDC Modeling Other items: WECC Website Feedback, Program Updates, NERC Updates, WECC Project Updates Next Meetings and Workshops

MVWG Approved Documents For TSS Information: Approved CCOMP Model Specifications and Model Updated the Approved Dynamics Model List (Nov 2014)  Added comment to the 1st generation wind models that their approval will be removed from the list, expected in June 2015  Added CCOMP model

Status Update of Models, Documents, and Tools

Status of Model Development Model DescriptionModel Name Model Spec Approved? User Guide Available? WECC Approved? Composite load modelCMPLDWPlan-Mar 2015XX 1 st generation windWTxx models (retiring Jun 2015)XXX Over excitation modelOEL1PSLF Manual- X SVS modelsSVSMO1, 2, 3XXX Generator modelGENTPJX-X Overcurrent relay modelLOCTI & TIOCRSXSee Model SpecX Volt and freq ride throughLHVRT, LHFRT--X Hydro turbine governor modelH6BX-X 2 nd gen wind/1 st gen PVRExx and WTGxx modelsXXX Distributed PV modelPVD1XXX Directional Overcurrent relayTIOCRS (revision)XSee Model Spec Distance relay modelDISTRELAYXSee Model Spec Differential relay modelDIFFRLYG and DIFFRLYSXSee Model Spec Under excitation relaysUEL1 & UEL2 IEEE (2005) - Excitation system modelsSee IEEE efforts Colstrip ATRUnder development (NWE) Generator protectionUnder development (MSRATF) Composite load model with DGCMPLDWG (supersedes CMPLDW)Plan-Mar 2015 Cross-current compensation modelCCOMPXSee Model SpecX OtherSee Approved Dynamics List X

Status Update of Models, Documents, and Tools Document expanded to be used as a reference:  Added list of MVWG approved documents Policy User Guide Model Specification Technical Report White Paper  Added list of MVWG tools

Load Modeling

Load Modeling – Composite Load Model Data Tools Tools available  Load Model Data Tool LMDT4A “2012 WECC CMPLDW.zip”  Updated Load Composition Data “CMPLDW Load Composition Data_ zip”  PNNL Tool (can create PSLF dyd & PSSE dyr format) “LMDT_install.zip” PNNL provided a demo of an enhanced version

Load Modeling – CMPLDW Monitoring Improvements Requested program vendors to add the ability to monitor load lost in CMPLDW models per area, zone, or owner so that we can track how much aggregated load is being shed Requested that PSLF otg-d format is compatible for both motorw and cmpldw models (otherwise you need to update the otg-d file with the new bus number for the cmpldw) Requested PSLF not to change the bus monitoring variable name so that it stays compatible with WCA analysis tools

Load Modeling CMPLDW Model Specifications document under review  Expected approval in March 2015 Meeting CMPLDWG Model Specifications document  Draft out for review, expected approval in March 2015 Meeting  Benchmark testing results expected in the June 2015 meeting Benchmarking showed consistent implementation across software platforms  Some bugs were fixed through this exercise  MOTORW and induction motor models (CIM5, CIM6, CIMW, and MOTOR1) are not identical For single-cage motor where Tppo=0 or Lpp=Lp, all these models are identical, and historically MOTORW had input data that represented single- cage motors only.

Load Modeling – Voltage Dip Criteria TPL-001-WECC-CRT-2.1 retirement on 12/31/2015 Discussed WECC-0100 TPL-001-WECC-RBP-3 System Performance document that was posted for comment Oct 15 – Dec (Posting 1)  Includes transient voltage performance, voltage stability criteria, steady state voltage limits and post contingency voltage deviations  There were suggestions on clarification on some of the draft languages, as well as discussions on the technical basis Another draft of the WECC Criteria is out for comment Feb 4 – Mar (Posting 2)

Renewable Energy Modeling

2 nd Generation Wind & PV Models SRWG Implementation Plan – Complete transition by 6/5/2015 Superseded models will be removed from Approved Dynamics Model List on 6/5/2015

2 nd Generation Wind Models

Photovoltaic Models For large-scale PV plants: For distributed and small PV plants, use PVD1 model

REMTF – Next Steps Write a white paper describing the limitations of generic models and use in positive sequence programs Distributed PV in composite load model (CMPLDWG)  Draft model specifications are out for review, expected approval in March 2015 Meeting Energy Storage Modeling – In progress  Utility members and manufacturers are encouraged to get engaged in the model development Plant Level Control Modeling – In progress  Expand to control multiple elements, including different types of wind turbines, SVCs or STATCOMs, and MSCs  Model specifications under development, beta testing expected in 1 st or 2 nd quarter 2015

System Model Validation

MVWG is continuing to improve the process to develop future model validation cases  Method 1: Planning base case and dyd  Method 2: Using WSM case and dyd (PSLF v19) Event Model Validation Efforts:  May NW RAS Event – Completed  May DC RAS Event – In progress  June BCH RAS and Alberta Separation Event  October Colstrip Event

Planning Case & DYD

WSM Case & DYD

May NW AC RAS Event Validation Report MVWG approved the “Model Validation Report for May 16, 2014 RAS Event” in Aug 2014 Includes simulations using both methods (Planning and WSM case) Follow-Up on Recommendations:  Wind modeling reconciliation still needs work  Wind needs to be modeled with 2 nd generation models  Tools are available to validate frequency response and baseload flag  SRP is investigating the Springerville unit trip  BPA is reviewing the Chief Jo Brake operation scheme  BCH is implementing some changes to the Kemano RAS

MOD-033 Discussion NERC Standard on Steady-State and Dynamic System Model Validation effective 7/1/2017  Background: The focus of validation in this standard is not Interconnection-wide phenomena, but on the Planning Coordinator’s portion of the existing system. Conference call was held January 22, 2015 to discuss plans to comply with NERC MOD-033 Draft Data Validation Process to cover R in progress, to be reviewed at March 2015 meeting, considering  Existing practices  NERC MWG document “Procedures for Validation of Powerflow and Dynamics Cases” (2011)  NATF efforts  Eastern Interconnection PCs discussions

MOD-033 Requirement R1 R1. Each Planning Coordinator shall implement a documented data validation process that includes the following attributes: 1.1. Comparison of the performance of the Planning Coordinator’s portion of the existing system in a planning power flow model to actual system behavior, represented by a state estimator case or other Real-time data sources, at least once every 24 calendar months through simulation; 1.2. Comparison of the performance of the Planning Coordinator’s portion of the existing system in a planning dynamic model to actual system response, through simulation of a dynamic local event, at least once every 24 calendar months (use a dynamic local event that occurs within 24 calendar months of the last dynamic local event used in comparison, and complete each comparison within 24 calendar months of the dynamic local event). If no dynamic local event occurs within the 24 calendar months, use the next dynamic local event that occurs; 1.3. Guidelines the Planning Coordinator will use to determine unacceptable differences in performance under Part 1.1 or 1.2; and 1.4. Guidelines to resolve the unacceptable differences in performance identified under Part 1.3.

Generator Modeling, Testing, and Model Validation

Power Plant Model Data Task Force List of suspected errors is available - PLEASE REVIEW AND ADDRESS ITEMS IN YOUR AREA MVWG will work with SRWG to incorporate additional data checks into the base case review process  Turbine type (ensure this is being populated)  Baseload flag (review/verify that flag is populated and correct)  Pmax (powerflow) should be less than mwcap (dynamics)  Wind models (see SRWG implementation plan) If there are additional errors suspected, continue to send them to Kent

Power Plant Model Data Task Force Tool (epcl) developed to export the generator powerflow data, including turbine type, and associated dynamic models in a single spreadsheet which can be used to examine the modeling Modeling Data standard MOD  BA, GO, LSE, RP, TO, TSP must respond to PC or TP if they provide technical concerns with the data (effective 7/1/2016) Verification standards MOD (Excitation Systems) and MOD (Turbine/Governor)  GO must respond to TP within 90 days if TP notifies GO that model is not usable, provides technical concerns with the verification documentation, or provides evidence that the model did not match the recorded response to an event (effective 7/1/2014)

Power Plant Model Data Task Force Under discussion - Expand to include model validation into the scope of this task force  Becomes Power Plant Model Validation and Data Task Force

Frequency Response Tool BPA Generator Frequency Response Tool is available (uses PI data)

Frequency Response Tool Eric Bakie (IPCO) provided an improved PI Data Generator Frequency Response Model Validation Tool (version 1)  Incorporates PI data tool  Incorporates PPMV tool for model validation  Includes batch processing, for multiple units and multiple events  Includes overview presentation and detailed user guide  Webinar training was provided July 22, 2014  Good for unit level model validation  This approach works for governor model validation  Good tool for identifying undesired control behavior

Excitation Models IEEE Standard on excitation models is close to going out for ballot  More discussion will be needed to determine which model(s) WECC will recommend to be the approved Currently OEL1 is WECC approved

Cross Current Compensation Model CCOMP Model Specifications approved CCOMP added to Approved Dynamic Model list Another version of the cross current compensation model will be proposed, if warranted  Will be discussed further at the March 2015 meeting

RAS Modeling

Discussed RAS modeling for transient studies PowerTech presented their experience with modeling RAS in transient stability  used in CAISO  under evaluation by Peak RC Eric Bahr (NWE) provided an overview of the Colstrip ATR scheme and the model specifications.  Working with program vendors and Colstrip Owners to get the model implemented  ATR model specifications and model are expected for approval at the March 2015 meeting

HVDC Modeling

Conventional HVDC point-to-point model  Powerflow model – exists  Dynamic model – user-written model tested, vendors to implement VSC HVDC point-to-point model  Powerflow model – will be in next release of commercial tools (already in PSSE)  Dynamic model – modeling details under discussion

HVDC Modeling Ongoing Issues  Trans Bay DC model still needs to be validated  PDCI Modeling Sylmar model still needs to be validated Celilo is expected to be replaced in 2016, the updated model is in progress

Other Items

WECC Website Feedback  requesting a webpage for MVWG approved documents, model specifications, and tools Program Updates – PSLF, PSSE, PowerWorld, and PowerTech NERC Updates WECC Project Updates

NERC Updates Eric Allen (NERC) provided updates:  NERC MWG developed drafts addressing the first two tasks of the node-breaker implementation plan.  PRC-002 Disturbance Monitoring Equipment was approved by Member Ballot, and on the way for board approval  MOD-032 and 033 standards were approved by FERC

WECC Project Updates WECC-0101 SAR Gen Validation Policy  Drafting team chaired by Shawn Patterson USBR  Responding to the comments from the 2nd round WECC-0107 PSS Design and Performance  Drafting team chaired by Martin Bauer USBR (consists of Control Work Group)  Responding to the comments from the 2nd round

Next Meetings & Workshops

March in Salt Lake City  REMTF Meeting -- Mar 17 th afternoon & Mar 18 th morning  LMTF Meeting -- Mar 18 th morning  MVWG Meeting -- Mar 18 th afternoon & Mar 19 th all day HVDCTF and PPMDTF will meet independently from the main M&VWG meeting Workshops  WSM validation – possibly June 2015  Tools for Power Plant Model Validation – TBD

Questions ?