Anntonette Alberti, JD Tetra Tech IPED Financing Wind Power

Slides:



Advertisements
Similar presentations
STÒRAS UIBHIST LOCH CARNAN COMMUNITY WIND FARM. Loch Carnan Community Wind Farm Iochdar Hill was deemed to be most promising due to: Strong low cost grid.
Advertisements

Wind Energy Services Integrating Environmental, Engineering and Constructability Considerations in Wind Power Development Anntonette Alberti, JD Tetra.
1 Wind Energy Services Environmental Permitting for Wind Energy Facilities Anntonette Alberti, JD Tetra Tech, Inc.
1 Siting, Real Estate and Interconnection Issues for Wind Projects Tim Conboy IPED Financing Windpower May 8, 2008.
Museum Presentation Intermuseum Conservation Association.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Innovative Approaches to Wildlife/Highway Interactions The “Seven Dwarfs”
Wind Farms 101 Gary Snyder, RES, Oklahoma State University
GLENARM POWER PLANT REPOWERING PROJECT WORKSHOP
SkyPower Corp. PRESENTATION.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Community Liaison Committee May 26, 2015 Bow Lake Wind Project.
Interconnection of Distributed Generation
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
Small Farm Profitability: Is Wind Energy the Answer? 1
Genesis Solar Module Brochure ™
Safeguards Workshop October 30, 2008 Moldova, Chusinau Day 2 – Quiz Mitigation Dmytro Glazkov.
1 Revised Jennifer M. Granholm, Governor Lisa Webb Sharpe, Director Wind Strategy.
Case Study Milford Wind Corridor Project Presenter: Lucas Lucero, Washington Office Project Manager Phone:
A Case Study in Community Wind New Ulm Public Utilities Commission - Success with Due Diligence Welcome.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Bringing Offshore Wind to Virginia
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Disaster Debris Preparedness Planning Angeline McInerny Wake County Environmental Services Department.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
1.  Offshore Siting Process / Guidelines – Macro View  Offshore Siting Example – VA  Offshore Development Example – VA Virginia Offshore Wind Technology.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
1 Overview of Minerals Management Service’s Alternative Energy Program Ocean Law Conference May 22, 2008 Seattle, WA Walter D. Cruickshank Deputy Director.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Construction of a Transfer Station
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Barriers and Challenges to Developing Renewable Energy Projects
A Paradigm for Utility Coordination
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Funder Preferred Risk Allocation
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Environmental, Engineering and Pre-Construction Cost Considerations for Wind Power Development Anntonette Alberti, JD Tetra Tech IPED Financing Wind Power July 25, 2007

Introduction to Tetra Tech 7500 employees and 250 offices nationwide Full service wind energy contractor Environmental Engineering Construction O&M Over 70 wind projects for about 30 clients across the US Our current projects range from: Drafting the American Wind Energy Association (AWEA) Environmental Siting Guide with Nixon Peabody Turnkey meteorology, engineering design and environmental permitting of a 300 to 500 MW facility on Lanai with AWS Civil construction of several New York State wind farms Offshore wind

Presentation Goals Provide an overview of the steps associated with developing a wind power project Identify aspects of development that can affect overall costs of construction

Anatomy of a Wind Project

Components of a Wind Project It is not just turbines. . . Temporary met towers Construction trailers and lay-down areas Concrete batch plant Construction spoil disposal sites Construction work areas around turbine foundations Access roads Public road improvements Electrical collection lines Transmission lines Switchyards, substations, point of interconnection stations Permanent met towers Restoration and mitigation projects Operations and maintenance building Visitor kiosk

Wind Meteorology costs: Wind Measurement Equipment and Installation Data Collection and Interpretation Meteorological Consultation and Advice

Transmission Transmission Costs: Development Electrical Engineering (What you need to get the right permits/land rights and get interconnection, not develop final construction drawings) Feasibility Study Conceptual collection system and high voltage interconnection design System Reliability Interconnection Study Utility Interconnection Fees and filings associated with interconnection Cost allocation for system upgrades Transmission legal Outside counsel for interconnection agreements, filings, FERC

Land Land costs: Costs of hired land men Landowner payments Hours and expenses Landowner payments Signing payments Met tower payments Option payments Lease conversion payments Neighbor agreement payments Land legal and title Outside counsel Title company ALTA Recording fees

Public and Governmental Relations Public and Governmental Relations Costs Local Office Staff Equipment Landowners and neighbors Newsletters Dinners Community Public Relations Mailings Ads Open houses Fairs and community events Charitable sponsorships Governmental Relations Lobbyists Public meeting support

Development Civil Engineering Costs for Development Civil Engineering (What you need to get the right permits/land rights, not develop final construction drawings): Conceptual Layout Constraint mapping Initial geotech (desktop?) Transportation study (identify routes, need for improvements to bridges, culverts, intersections, etc) Initial siting turbines, roads, collection, transmission, substation, construction work areas, etc Walk-overs

Development Civil Engineering Cont. Permitting Layout development (need coordination with electrical on collection system/high voltage portions of design) 2’ contours Initital horizontal alignment Geotechnical study Survey and Staking Engineering/environmental walk Landowner walk Agency walk as needed Finalize horizontal layout for permitting

Development Civil Engineering Cont. Engineering-heavy permits DOT permits for road improvements and cutting access into state roads Local permits for road improvements and cutting access into local roads NPDES (or state equivalent) NOI for construction with SWPPP and SPCCP NPDES (or equivalent) NOI for operation with SWPPP and SPCCP (this is important to consider during design because of potential need for secondary containment around transformers)

Environmental Studies and Permitting Environmental Studies and Permitting Costs: Consultants Permit applications and regulatory representation Avian and bat studies, reports, consultations Wetland studies, reports, permits, mitigation Wildlife and vegetation studies, reports, consultations, mitigation Agricultural protection consultation, mitigation Cultural and historical resource studies and consultations, mitigation Communications interference studies (including homeland security) Aviation interference studies Visual impact analysis Groundwater studies Socioeconomic studies as required Other studies as required EAs, DEISs. FEISs and/or equivalent reports and processes

Environmental Studies and Permitting Cont. Permitting fees Actual permit fees Agency collection agreements Permitting Legal Outside counsel

Preconstruction Preconstruction Costs: Negotiations with turbine and other equipment/service providers Finalize Turbine and Long-Lead-Time Item Procurement Final Construction Plans and Drawings Develop Environmental Construction Compliance Plan Secure Construction Owner-Representative Team Secure Construction Contractors Develop Mobilization Plan

Take Away Points Wind project development is highly iterative Change management in scope, schedule and budget is key Early engineering and constructability review can save tens of millions during construction Appropriate planning can vastly improve long term economics

Contacts Environmental and Engineering Anntonette Alberti, JD anntonette.alberti@tteci.com 518-488-8588 Charlie Karustis charlie.karustis@tteci.com 503-222-4536 Construction and Operations & Maintenance John Hueston john.hueston@tteci.com 678-983-0863