WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.

Slides:



Advertisements
Similar presentations
MAINTENANCE MANAGEMENT Module 9
Advertisements

ESLS 04 Daresbury Laboratory
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
All activities involved in keeping a system’s equipments working are the part of maintenances management. Maintenance of machine involves the efforts.
UPS Improvements to Beam Availability at the Australian Synchrotron Light Source Don McGilvery.
Overview Lesson 10,11 - Software Quality Assurance
1 / 24 CS 425/625 Software Engineering Software Evolution Based on Chapter 21 of the textbook [SE-8] Ian Sommerville, Software Engineering, 8 th Ed., Addison-Wesley,
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.
Introduction and Course overview by S. O. Duffuaa.
 User Manuals come in all types, designs and formats.  This presentation is designed to show a few basic elements that will serve any user manual. 
Chapter 9 – Software Evolution and Maintenance
Information Technology Project Management By Denny Ganjar Purnama, MTI Universitas Pembangunan Jaya May 2014.
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
Lecture # 22 Software Evolution
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
Analyze Opportunity Part 1
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
The Software Quality Assurance System By Jonathon Gibbs Jonathon Gibbs (jxg16u) 26 th November 2009.
E.Matias Canadian Light Source. Where is Saskatoon?
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
ASTeC 10 Years On SRS Support Paul Quinn October 2011.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Course of Study 5. Maintenance Management Assessing Maintenance Needs
Utility Engineers, PC.  Generation  Transmission  Distribution.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Requirements Engineering Requirements Validation and Management Lecture-24.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
State-of-the-Art Accelerator Technology Peter McIntosh, STFC HEPTech Environmental Applications of Accelerators 9 th July 2013.
Operational experience of high-power RF at Diamond Light Source
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
8 Medication Errors and Prevention.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Intelligent Maintenance Program
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Improved performance of Variable Energy Cyclotron(VEC) Variable Energy Cyclotron Centre Kolkata P S Chakraborty, B Ch Mandal, S K Thakur, M Das, S Som,
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 OF 17 INFORMATION TECHNOLOGY CAPITAL PLANNING FOR YOUR ENTERPRISE Steven Carpenter 14 October 2006.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Semester 8th (Self Support)
Report Technical Director Storage-Ring-Installation Completed
The Survey of the Power Supply Reliability at SSRF
Challenges of Dual Harmonic RF Systems
MPE-PE Section Meeting
MICE Target Report Video Conference 29/11/07
SuperB Injection, RF stations, Vibration and Operations
RF operation of REX-ISOLDE
Total Productive Maintenance and Quick Changeover
Machine Operation and Progresses in SSRF
Mathew C. Wright January 26, 2009
Thoughts on Energy Reach
TPM Definitions Goals and Benefits Components GEOP 4316.
Operation Progress and Upgrade in SSRF
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron Radiation Department

WAO, Trieste, 24th - 28th September 2007 Contents Introduction SRS Operational Statistics Analysis of the Operational Data –Efficiency –Fault Statistics –Ageing and Obsolete Equipment Maintaining Reliability –Capital Investment and Redundancy –Risk Analysis –Post Incident Investigation and Modifications –Preventative Maintenance and Scheduling Conclusions and Acknowledgments

WAO, Trieste, 24th - 28th September 2007 Introduction The Synchrotron Radiation Source –2GeV, 2 nd Generation Light Source –Constructed between 1975 and 1980 –Began scheduled user operations in 1981 –Some SRS systems, mainly injector components were salvaged from a previous accelerator –Operational user facility for 26 years and scheduled for closure December 2008

WAO, Trieste, 24th - 28th September – 1992 A number of upgrades HBL Undulator SC Wavelength Shifters Erratic efficiency profile due to new systems Dominated by water – vacuum incidents 01/02 (65%) SCW 9 Absorber 04/05 (85%) RF Cavity Window & Quadrupole Vessel Absorber 06/07 (78%) TVM 9 Efficiency in 06/07 was also significantly effected by Linac RF and HT systems and Gun Cathode issues. Periods between incidents in excess of 90% Stable period of operation Gradual increase in efficiency to figures in excess of 90% SRS Reliability Data

WAO, Trieste, 24th - 28th September 2007 SRS Fault Statistics Vacuum Incidents

WAO, Trieste, 24th - 28th September 2007 Vacuum Incidents Usually an isolated single failure Difficult to predict and prevent –failed RGA head –Quadrupole absorber – failed flowmeter Common Theme? –SCW Absorber & TVM 9 –Both very different failure mechanisms –Both historical – not needed in the current SRS configuration

WAO, Trieste, 24th - 28th September 2007 SRS Fault Statistics Beam Loss Cause UnknownRF Klystron PSURF SystemControls

WAO, Trieste, 24th - 28th September 2007 Ageing and Obsolete Equipment Early Equipment –Built in-house –Repairs in-situ (time) –Can be repaired Later Equipment –Plug-in –Replaced with a spare –Return to manufacturer for repair –Support issues

WAO, Trieste, 24th - 28th September 2007 Ageing and Obsolete Equipment Concern regarding condition of in vacuum water circuits –17 year old absorber removed from storage ring –Area’s milled away to examine any wall thinning RESULT No evidence of wall thinning or erosion

WAO, Trieste, 24th - 28th September 2007 Ageing and Obsolete Equipment External water circuits –Elbows –Near feedthroughs –Potential for vacuum incident during repair –Potential to cause more serious failure

WAO, Trieste, 24th - 28th September 2007 Ageing Machine – It’s not just equipment! It’s about people too! –Loss of design and build knowledge, as staff retire Less documentation for older equipment, drawings, maintenance schedules, etc. Can’t teach 20 years design, build and operational knowledge. –Succession planning important –You only know what’s been missed when the fault occurs Lapses in maintenance schedules Longer fault rectification

WAO, Trieste, 24th - 28th September 2007 Capital Investment and Redundancy Capital investment –Must be bid for against other priority items –Only essential systems and components which would significantly improve efficiency Spares –Hot Power Converters Storage Ring Klystron –Vacuum vessels Old RF PSU New Commercial Unit

WAO, Trieste, 24th - 28th September 2007 Risk Analysis Benefit difficult to assess –The biggest risk is the one you don’t know about At top level –Difficult to compare risk and focus resource –How do you compare extremely reliable long lead time items against components that fail frequently, but are a fast repair? –Does highlight major issues Linac Klystron

WAO, Trieste, 24th - 28th September 2007 Risk Analysis Most beneficial at individual technical group level Direct comparison can be made between equipment and fault hours contributed Led to successful modernisation in key area’s based on safety and operational risk

WAO, Trieste, 24th - 28th September 2007 Post Incident Investigation Learning from incidents is important Committee is always formed to recover and also determine actions to prevent reoccurrence. Actions from recent faults –Modification to TVM cooling pipes –Revised interlock testing schedule –Test rig to test thermionic valves on-site

WAO, Trieste, 24th - 28th September 2007 Preventative Maintenance and Scheduling

WAO, Trieste, 24th - 28th September 2007 Conclusions The SRS has provided reliable user operations for over 26 years Vacuum incidents are isolated incidents, which do not indicate any form of systematic failure which would limit the life of the SRS Only evidence of any systematic failure due to ageing is the failure of copper elbows on water circuits The high operating efficiency demanded by the light source community can be maintained on an ageing machine using a variety of techniques.

WAO, Trieste, 24th - 28th September 2007 Acknowledgments The author would like to thank –Previous SRS Operations Managers for compiling these statistics –Current and past Operations Teams for providing the data –Steve Griffiths of EE&PS for providing his Groups Risk Analysis Data And Finally Daresbury Staff past and present for their contributions to SRS Operations